Item No Description Units March 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 5.000 24,537.59200 33.000 22,539.98667 33
500 2006 MOBILIZATION EA 1.000 45,000.00000 3.000 45,000.00000 3
500 6001 MOBILIZATION LS 5.000 26,274.30600 13.000 24,480.23538 13
500 6033 MOBILIZATION (CALLOUT) EA 4.000 20,000.00000 10.000 21,400.00000 3
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 13,121.81000 70.000 7,371.35857 37
502 2055 OFF - DUTY POLICE OFFICERS HR 342.000 64.25000 1,026.000 64.25000 3
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 9,380.00000 31.000 10,380.64516 16
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF     200.000 3.00000 1
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF     200.000 1.00000 1
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 739.000 7.15000 1,478.000 7.15000 2
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 90.000 15.00000 360.000 9.50000 3
530 2009 DRIVEWAYS (SURF TREAT) EA 57.000 20.00000 171.000 20.00000 3
530 2017 TURNOUTS (ACP) SY 230.000 7.83000 690.000 7.83000 3
530 2021 INTRSCT, DRVWAYS, & TURNOUT (SURF TREAT SY     3,680.000 39.05000 2
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     262,950.000 0.18000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF 100.000 22.00000 300.000 22.00000 3
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 4.000 1,650.00000 12.000 1,650.00000 3
544 2006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA 4.000 2,500.00000 12.000 2,500.00000 3