Item No Description Units October 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,493.210 455.61055 5
730 2001 STRIP MOWING AC     42,166.000 28.00998 24
730 2002 FULL - WIDTH MOWING AC     67,292.000 31.79804 27
735 2001 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES CYC     12.000 912.25000 1
735 2003 DEBRIS REMOVAL (FRONTAGE ROADS) CYC     12.000 240.30000 1
735 2005 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) CYC     12.000 162.42000 1
738 2001 CLEANING / SWEEPING (CENTER MEDIAN) CYC     12.000 2,024.75000 1
738 2003 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC     12.000 4,628.00000 1
738 2005 CLEANING / SWEEPING (FRONTAGE ROAD) CYC     12.000 1,201.50000 1
738 2007 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) CYC     12.000 812.12000 1
738 2011 CLEANING / SWEEPING (HANDWORK) SY     75,856.000 0.27000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     14,050.000 11.99288 5
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     260.000 14.53846 6
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     330.000 23.81818 6
770 2006 REALIGN POSTS EA     480.000 17.45833 6
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     27.000 5.74074 6
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     27.000 14.55556 6
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     57.000 1,710.52632 4
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     38.000 806.84211 6
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     1,750.000 18.54286 6
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     80.000 85.00000 5
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     100.000 72.50000 6
770 2018 REM / REPL TIMBER POST W / O CONC FND EA     300.000 47.86667 6
770 2019 REM / REPL STEEL POST W / O CONC FND EA     300.000 60.00000 4
770 2020 REM / REPL TIMBER POST W / CONC FND EA     60.000 30.00000 4
770 2021 REM / REPL STEEL POST W / CONC FND EA     490.000 92.61224 6
770 2022 REM & RESET SGT IMPACT HEAD EA     67.000 135.82090 6
770 2023 REPLACE SGT OBJECT MARKER EA     52.000 9.30769 5
770 2024 REPLACE SGT CABLE ANCHOR EA     16.000 25.25000 5
770 2025 REPLACE SGT CABLE ASSEMBLY EA     16.000 31.00000 5
770 2026 REPLACE SGT STRUT EA     16.000 22.87500 5
770 2027 REMOVE & REPLACE BLOCKOUT EA     440.000 11.00000 6
770 2028 REPLACE HINGED TOP SGT STEEL POST EA     78.000 70.06410 6
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     1,350.000 13.81481 6
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF     3,200.000 5.50000 2
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA     40.000 60.00000 2
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA     10.000 62.50000 2
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF     800.000 2.75000 2
774 2007 REPAIR (TRACC) LF     30.000 290.00000 2
774 2009 REPAIR (WIDE TRACC) LF     30.000 310.00000 2
774 2028 REPAIR (QUAD) (N) (BAY) EA     8.000 750.00000 2
774 2029 REPAIR (QUAD) (W) (BAY) EA     8.000 750.00000 2
774 2033 REPAIR (GREAT SYS) (BAY) EA     12.000 750.00000 2
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF     140.000 44.28571 4
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     165.000 41.21212 5
776 2011 REP METAL POST W / BASE PLATE (T101 RAIL EA     110.000 137.72727 5
776 2014 REP METAL POST W / BASE PLATE (T6 RAIL) EA     120.000 55.83333 6
776 2035 REPAIR (W - BEAM - T101 RAIL) LF     75.000 13.00000 2
776 2048 REP METAL POST W / BASE PLATE (TYPE T1) EA     25.000 66.00000 2