Item No Description Units February 28, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,150.700 434.36122 4
730 2001 STRIP MOWING AC     38,276.000 27.77146 21
730 2002 FULL - WIDTH MOWING AC     59,358.000 32.01673 24
735 2001 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES CYC     24.000 518.62500 2
735 2003 DEBRIS REMOVAL (FRONTAGE ROADS) CYC     24.000 182.65000 2
735 2005 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) CYC     24.000 143.71000 2
738 2001 CLEANING / SWEEPING (CENTER MEDIAN) CYC     24.000 2,377.37500 2
738 2003 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC     24.000 3,679.00000 2
738 2005 CLEANING / SWEEPING (FRONTAGE ROAD) CYC     24.000 1,965.75000 2
738 2007 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) CYC     24.000 1,771.06000 2
738 2011 CLEANING / SWEEPING (HANDWORK) SY     151,712.000 0.26000 2
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     13,250.000 11.99245 5
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     190.000 14.31579 5
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     110.000 12.54545 5
770 2006 REALIGN POSTS EA     340.000 14.35294 5
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     17.000 3.23529 5
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     17.000 5.58824 5
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     51.000 1,625.49020 4
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     37.000 817.83784 5
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     1,000.000 22.20000 5
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     70.000 50.00000 4
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA     15.000 10.00000 1
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     140.000 39.28571 5
770 2018 REM / REPL TIMBER POST W / O CONC FND EA     190.000 53.73684 4
770 2019 REM / REPL STEEL POST W / O CONC FND EA     150.000 41.66667 3
770 2020 REM / REPL TIMBER POST W / CONC FND EA     70.000 52.85714 4
770 2021 REM / REPL STEEL POST W / CONC FND EA     240.000 76.58333 5
770 2022 REM & RESET SGT IMPACT HEAD EA     72.000 106.94444 5
770 2023 REPLACE SGT OBJECT MARKER EA     42.000 3.28571 4
770 2024 REPLACE SGT CABLE ANCHOR EA     14.000 18.42857 4
770 2025 REPLACE SGT CABLE ASSEMBLY EA     14.000 23.57143 4
770 2026 REPLACE SGT STRUT EA     14.000 17.85714 4
770 2027 REMOVE & REPLACE BLOCKOUT EA     210.000 10.66667 5
770 2028 REPLACE HINGED TOP SGT STEEL POST EA     83.000 69.15663 5
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     1,200.000 14.16667 5
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF     1,600.000 4.00000 1
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA     20.000 20.00000 1
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA     5.000 50.00000 1
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF     400.000 2.50000 1
774 2007 REPAIR (TRACC) LF     15.000 80.00000 1
774 2009 REPAIR (WIDE TRACC) LF     15.000 120.00000 1
774 2028 REPAIR (QUAD) (N) (BAY) EA     4.000 1,000.00000 1
774 2029 REPAIR (QUAD) (W) (BAY) EA     4.000 1,000.00000 1
774 2033 REPAIR (GREAT SYS) (BAY) EA     6.000 800.00000 1
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF     170.000 37.94118 4
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     170.000 45.29412 4
776 2011 REP METAL POST W / BASE PLATE (T101 RAIL EA     80.000 128.75000 4
776 2014 REP METAL POST W / BASE PLATE (T6 RAIL) EA     100.000 43.00000 5
776 2035 REPAIR (W - BEAM - T101 RAIL) LF     50.000 10.00000 1
776 2048 REP METAL POST W / BASE PLATE (TYPE T1) EA     15.000 10.00000 1