AVERAGE LOW BID UNIT PRICE - MAINTENANCE - TYLER DISTRICT

Last Update: Friday, April 17, 2015
ITEMS 712 2005 TO 776 2032
Items Items Bid Code Range
0104 - 0168
0247 - 0275
0314 - 0361
0401 - 0496
0500 - 0560
0618 - 0685
0712 - 0776
1122 - 1122
3267 - 3268
5369 - 5445
6266 - 6834
7039 - 7185
8020 - 8852
712 2005 - 776 2032
Item No Description Units March 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     368.360 466.07992 2
730 2002 FULL - WIDTH MOWING AC     5,269.940 27.00000 1
730 6002 FULL - WIDTH MOWING AC     61,037.680 25.16808 8
734 6001 LITTER REMOVAL AC     19,614.790 10.74169 8
735 2001 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES CYC 8.000 1,400.00000 100.000 1,856.00000 4
735 2003 DEBRIS REMOVAL (FRONTAGE ROADS) CYC     12.000 1,000.00000 1
735 2005 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) CYC 8.000 1,171.00000 36.000 1,114.00000 4
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI 20.000 21.00000 66.000 37.27273 4
738 2001 CLEANING / SWEEPING (CENTER MEDIAN) CYC     5.000 9,500.00000 1
738 2003 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC     5.000 9,500.00000 1
738 2013 CLEANING / SWEEPING (DIRECT CONNECTOR) CYC     5.000 3,000.00000 1
740 2001 GRAFFITI REMOVAL (BLAST CLEANING) SF     60.000 20.00000 1
740 2002 GRAFFITI REMOVAL (PAINTING) SF     1,200.000 3.00000 1
740 2003 GRAFFITI REMOVAL (CHEMICAL CLEANING) SF     30.000 30.00000 1
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     325.340 1,339.42285 4
752 2022 TREE REMOVAL (4" - 12" DIA) EA     2,600.000 28.46154 2
752 2023 TREE REMOVAL (12" - 18" DIA) EA     1,550.000 42.25806 2
752 2024 TREE REMOVAL (18" - 24" DIA) EA     575.000 52.17391 2
752 2025 TREE REMOVAL (24" - 30" DIA) EA     275.000 102.72727 2
752 2026 TREE REMOVAL (30" - 36" DIA) EA     78.000 130.76923 2
752 2027 TREE REMOVAL (36" - 42" DIA) EA     45.000 216.66667 2
752 2028 TREE REMOVAL (42" - 48" DIA) EA     21.000 300.00000 2
752 2029 TREE REMOVAL (48" - 60" DIA) EA     12.000 387.50000 2
752 2030 TREE REMOVAL (60" - 72" DIA) EA     10.000 465.00000 2
752 6003 TREE TRIMMING / BRUSH REMOVAL MI     163.840 1,334.83356 2
752 6005 TREE REMOVAL (4" - 12" DIA) EA 850.000 50.00000 1,700.000 50.00000 2
752 6006 TREE REMOVAL (12" - 18" DIA) EA 550.000 75.00000 1,100.000 75.00000 2
752 6007 TREE REMOVAL (18" - 24" DIA) EA 250.000 85.00000 500.000 85.00000 2
752 6008 TREE REMOVAL (24" - 30" DIA) EA 175.000 85.00000 350.000 85.00000 2
752 6009 TREE REMOVAL (30" - 36" DIA) EA 105.000 100.00000 210.000 100.00000 2
752 6010 TREE REMOVAL (36" - 42" DIA) EA 5.000 300.00000 10.000 300.00000 2
752 6011 TREE REMOVAL (42" - 48" DIA) EA 3.000 500.00000 6.000 500.00000 2
752 6012 TREE REMOVAL (48" - 60" DIA) EA 2.000 600.00000 4.000 600.00000 2
752 6013 TREE REMOVAL (60" - 72" DIA) EA 1.000 1,100.00000 2.000 1,100.00000 2
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     4,000.000 20.00000 1
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     50.000 30.00000 1
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     50.000 30.00000 1
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     50.000 15.00000 1
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     15.000 50.00000 1
770 2006 REALIGN POSTS EA     350.000 70.00000 1
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     1.000 100.00000 1
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     15.000 1,800.00000 1
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     12.000 1,000.00000 1
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     1,500.000 30.00000 1
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     100.000 60.00000 1
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     12.000 100.00000 1
770 2018 REM / REPL TIMBER POST W / O CONC FND EA     350.000 40.00000 1
770 2022 REM & RESET SGT IMPACT HEAD EA     15.000 700.00000 1
770 2023 REPLACE SGT OBJECT MARKER EA     15.000 20.00000 1
770 2024 REPLACE SGT CABLE ANCHOR EA     4.990 200.00000 1
770 2025 REPLACE SGT CABLE ASSEMBLY EA     12.000 100.00000 1
770 2026 REPLACE SGT STRUT EA     1.990 100.00000 1
770 2027 REMOVE & REPLACE BLOCKOUT EA     30.000 30.00000 1
770 2031 INSTALL BLOCKOUT EA     25.000 30.00000 1
774 2006 REPAIR (TRACC) EA     1.000 3,000.00000 1
774 2015 REPAIR (NARROW QUAD) EA     1.000 3,000.00000 1
774 2028 REPAIR (QUAD) (N) (BAY) EA     10.000 800.00000 1
774 2038 REMOVE AND REPLACE (FASTRACC) EA     1.990 2,000.00000 1
774 2052 REPAIR (FASTRACC) LF     50.000 100.00000 1
774 2055 REPAIR (FASTRACC) (BAY) EA     12.000 400.00000 1
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF     50.000 60.00000 1
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     50.000 20.00000 1
776 2032 REPAIR (STEEL POST W / CHANNEL IRON RAIL LF     100.000 20.00000 1