AVERAGE LOW BID UNIT PRICE - MAINTENANCE - STATEWIDE

Last Update: Wednesday, April 3, 2013
ITEMS 100 2001 TO 164 2027
Items Items Bid Code Range
0100 - 0169
0216 - 0292
0305 - 0361
0400 - 0499
0500 - 0560
0610 - 0690
0700 - 0788
1004 - 1122
2014 - 2065
3035 - 3268
4013 - 4617
5049 - 5987
6006 - 6949
7008 - 7634
8020 - 8909
100 2001 - 164 2027
164 2029 - 169 2008
Item No Description Units March 31, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC 4.370 6,883.29519 14.050 7,655.19573 10
100 2002 PREPARING ROW STA     1,397.050 226.63807 34
100 2003 PREPARING ROW (TREE) (5" TO 12" DIA) EA 10.000 1,000.00000 74.000 418.91892 3
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     3.000 100.00000 1
100 2005 PREP ROW (TREE) (24" - 30"DIA) EA     1.000 200.00000 1
100 2008 PREPARING ROW (TREE) (0" TO 6" DIA) EA     17.000 50.00000 1
104 2001 REMOVING CONC (PAV) SY     1,270.000 32.62992 7
104 2009 REMOVING CONC (RIPRAP) SY 1,301.800 17.20080 13,891.170 9.81318 38
104 2010 REMOVING CONC (RIPRAP) CY 500.000 85.55000 1,560.000 51.86224 5
104 2011 REMOVING CONC (MEDIANS) SY     264.000 33.11553 4
104 2014 REMOVING CONC (FOUNDATIONS) CY     75.800 370.51966 4
104 2015 REMOVING CONC (SIDEWALKS) SY     3,256.000 6.44097 14
104 2017 REMOVING CONC (DRIVEWAYS) SY 41.000 27.00000 439.000 28.76948 7
104 2021 REMOVING CONC (CURB) LF 334.000 10.00000 21,148.000 3.00738 28
104 2022 REMOVING CONC (CURB AND GUTTER) LF 1,139.000 11.34328 14,952.500 16.67976 14
104 2023 REMOVING CONC (CTB) LF     1,868.000 22.70503 2
104 2025 REMOVE CONC (WINGWALL) CY     20.100 207.06468 2
104 2027 REMOVING CONC (APPR SLAB) SY     451.000 37.33038 3
104 2028 REMOVING CONC (MISC) SY 6.000 116.66667 4,048.000 10.79223 10
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF 85.000 50.00000 3,920.000 9.20281 4
104 2030 REMOVING CONC (PILE ENCASEMENT) CY     13.000 653.84615 2
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY     113.000 23.01106 4
104 2033 REMOVING CONC (DRAIN) SY     2.000 30.00000 1
104 2034 REMOVING CONC (COPING) LF     76.000 27.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     351.120 21.84552 3
104 2037 REMOVE CONC (RAIL) LF     625.000 53.74272 2
104 2038 REMOVE CONC (ABUTMENT CAP) CY     7.500 2,000.00000 1
104 2039 REMOVE CONC (ABUTMENT BACKWALL) CY     31.700 345.00000 1
104 2040 REMOVING CONC (PAVERS) SY     1,056.000 12.50592 5
104 2044 REMOVING CONC (FLUME) SY     17.000 14.00000 1
104 2045 REMOVE CONC (MISC) EA     1.000 5,400.00000 1
105 2005 REMOVING STAB BASE AND ASPH PAV (3") SY     340.000 12.40000 1
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     3,400.000 5.80294 2
105 2014 REMOVING STAB BASE & ASPH PAV (7" - 12") SY     2,520.000 6.06151 2
105 2015 REMOVING STAB BASE & ASPH PAV (8" - 10") SY     65.000 10.26000 1
105 2016 REMOVING STAB BASE & ASPH PAV (16") SY     410.000 42.00000 1
105 2019 REMOVING STAB BASE & ASPH PAV (14") SY     800.000 21.00000 1
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     252.000 12.00000 1
105 2026 REMOVE STAB BASE & ASPH PAV (13" - 18") SY     6,984.000 8.93299 2
105 2030 REMOVING STAB BASE & ASPH PAV (8" - 14") SY     143.000 9.00000 1
105 2033 REMOVING STB BASE AND ASPH PAV (10 - 14") SY     138.000 20.00000 1
105 2041 REMOVING STAB BASE AND ASPH PAV (8") SY 36,400.000 4.00000 37,530.000 4.30189 3
105 2045 REMOVING STAB BASE AND ASPH PAV (2" - 8" SY     89.000 33.50000 1
105 2069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     197.000 12.00000 1
105 2079 REMOVING STAB BASE & ASPH PAV (4" - 12") SY     129.000 40.00000 1
110 2001 EXCAVATION (ROADWAY) CY 1,062.000 12.00000 88,953.900 10.53112 32
110 2002 EXCAVATION (CHANNEL) CY     6,814.000 9.09459 9
110 2003 EXCAVATION (SPECIAL) CY 251.000 80.00000 15,825.690 14.58244 16
112 2001 SUBGRADE WIDENING (ORD COMP) STA 910.460 325.70026 3,727.920 243.11692 22
112 2002 SUBGRADE WIDENING (DENS CONT) STA     1,558.860 175.89873 9
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY 658.000 22.21884 5,566.600 19.37969 12
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     1,696.000 19.83019 2
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     22,685.500 8.62531 24
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     9,102.000 11.35944 2
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY 100.000 25.00000 7,340.000 17.78143 9
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     638.000 22.00000 1
132 2011 EMBANKMENT (ORIGINAL) (ORD COMP) (TY B) CY     220.000 37.03000 1
132 2017 EMBANKMENT (VEHICLE) (ORD COMP) (TY A) CY     1,751.000 47.86408 9
132 2019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY 1,290.000 21.13136 8,467.500 20.24433 26
132 2021 EMBANKMENT (VEHICLE) (ORD COMP) (TY C) CY     24,631.000 8.70056 7
132 2026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY     90.000 55.00000 1
134 2001 BACKFILL (TY A) STA     8,212.390 94.10698 19
134 2002 BACKFILL (TY B) STA 1,016.990 32.42770 5,578.460 82.72716 30
134 2003 BACKFILL (TY C) STA     178.200 582.63187 2
134 2004 BACKFILL (TY A OR B) STA 619.560 206.55175 1,532.190 170.50341 11
134 2010 BACKFILL (TY B) LF     339,615.000 0.45000 2
150 2001 BLADING STA     7,662.630 46.71638 18
150 2002 BLADING HR 50.000 110.00000 730.000 123.90836 27
152 2001 ROAD GRADER WORK (ORD COMP) STA     674.100 125.27235 6
156 2001 BULLDOZER WORK HR 24.000 90.00000 1,198.000 43.22204 7
158 2002 SPEC EXCAV WORK (BACKHOE) HR     232.000 92.11207 5
158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR     397.000 136.05249 6
158 2004 SPEC EXCAV WORK (FRONT - END LOADER) HR     16.000 65.00000 1
158 2005 SPEC EXCAV WORK (ORIGINAL) CY     641.000 14.68042 2
158 2006 SPEC EXCAV WORK (VEHICLE) CY     1,802.000 15.39401 2
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY 825.000 2.00000 47,130.200 0.99466 8
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY 273.000 4.38000 1,433.000 9.48761 3
160 2005 FURNISHING AND PLACING TOPSOIL CY     1,101.000 14.55041 2
160 2006 FURNISHING AND PLACING TOPSOIL (3") SY     933.000 0.75000 1
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY     504.000 2.00000 1
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY     312.000 6.75000 1
161 2008 EROSION CONTROL COMPOST (2") SY     446.000 1.75000 1
161 2009 EROSION CONTROL COMPOST CY     500.000 27.00000 1
161 2014 COMPOST MANUF TOPSOIL (BOS OR PB) (4") SY     42.000 10.00000 1
162 2002 BLOCK SODDING SY     22,811.000 5.05860 18
162 2003 STRAW OR HAY MULCH SY     1,000.000 0.80000 1
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 2,467.000 2.32469 14,192.000 0.73204 12
164 2002 BROADCAST SEED (PERM) (RURAL) (SANDY) AC     12.000 611.67000 2
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 177,484.000 0.08000 203,300.000 0.12793 12
164 2004 BROADCAST SEED (PERM) (RURAL) (CLAY) AC     12.000 611.67000 2
164 2005 BROADCAST SEED (PERM) (URBAN) (SANDY) SY     8,000.000 0.20875 2
164 2007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY 825.000 0.40000 17,578.000 0.32683 6
164 2009 BROADCAST SEED (TEMP) (WARM) SY 2,273.000 1.93995 39,050.000 0.63775 12
164 2011 BROADCAST SEED (TEMP) (COOL) SY     5,375.000 0.32558 2
164 2013 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY SY     57,004.000 0.27551 5
164 2014 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY AC     20.800 795.00000 1
164 2016 STRAW / HAY MLCH SEED (PERM) (RURAL) (CLAY) AC     0.300 2,000.00000 1
164 2021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY 4,275.000 0.39000 33,402.000 0.52682 5
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     419,531.000 0.26350 9
164 2027 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) SY     120.000 11.03000 1