AVERAGE LOW BID UNIT PRICE - MAINTENANCE - STATEWIDE

Last Update: Tuesday, November 4, 2014
ITEMS 100 2001 TO 164 2010
Items Items Bid Code Range
0100 - 0169
0204 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0700 - 0788
1004 - 1122
2144 - 2303
3035 - 3288
4003 - 4581
5049 - 5935
6005 - 6986
7008 - 7658
8020 - 8999
100 2001 - 164 2010
164 2011 - 169 2006
Item No Description Units October 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     8.996 10,911.44953 9
100 2002 PREPARING ROW STA     1,191.830 405.62846 28
100 2003 PREPARING ROW (TREE) (5" TO 12" DIA) EA 5.000 300.00000 14.000 428.57143 2
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA 2.000 500.00000 3.000 666.66667 2
100 2008 PREPARING ROW (TREE) (0" TO 6" DIA) EA     13.000 203.84615 4
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     1.000 2,400.00000 1
100 2017 PREP ROW (TREE) (GREATER THAN 8 IN DIA) EA     3.000 2,000.00000 1
100 2020 PREPARING ROW (DENSITY A) STA     75.040 4,800.00000 1
100 2021 PREPARING ROW (DENSITY B) STA     15.030 4,800.00000 1
100 2022 PREPARING ROW (DENSITY C) STA     96.290 4,800.00000 1
104 2001 REMOVING CONC (PAV) SY     4,336.000 27.70732 7
104 2009 REMOVING CONC (RIPRAP) SY 55.000 21.99455 6,154.150 27.85038 37
104 2010 REMOVING CONC (RIPRAP) CY     589.500 43.62629 8
104 2011 REMOVING CONC (MEDIANS) SY     249.000 30.56454 3
104 2012 REMOVING CONC (MEDIANS) CY     130.000 57.67000 1
104 2013 REMOVING CONC (FOUNDATIONS) SY     13.000 200.74000 1
104 2014 REMOVING CONC (FOUNDATIONS) CY     59.000 393.64407 2
104 2015 REMOVING CONC (SIDEWALKS) SY 30.000 19.49000 1,249.300 26.33563 15
104 2017 REMOVING CONC (DRIVEWAYS) SY     807.900 22.51516 8
104 2020 REMOVING CONC (OTHER APPURTENANCES) CY     150.560 261.63656 2
104 2021 REMOVING CONC (CURB) LF 500.000 3.00000 14,300.000 13.85758 26
104 2022 REMOVING CONC (CURB AND GUTTER) LF 30.000 19.49000 4,087.000 13.07803 14
104 2023 REMOVING CONC (CTB) LF     2,188.000 29.99589 4
104 2025 REMOVE CONC (WINGWALL) CY     95.800 454.07098 4
104 2027 REMOVING CONC (APPR SLAB) SY     763.000 53.58322 4
104 2028 REMOVING CONC (MISC) SY     806.600 51.08046 8
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     265.000 9.00000 1
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY     148.000 22.39865 3
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     31.000 35.00000 1
104 2037 REMOVE CONC (RAIL) LF     812.500 57.60825 6
104 2040 REMOVING CONC (PAVERS) SY     1,800.000 12.00000 3
104 2044 REMOVING CONC (FLUME) SY     485.000 44.92784 3
104 2045 REMOVE CONC (MISC) EA     25.000 828.00000 2
104 2048 REMOVING CONC (SIDEWALKS) (RMA) SY     550.000 10.00000 1
105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY     4,554.000 5.00000 1
105 2005 REMOVING STAB BASE AND ASPH PAV (3") SY     340.000 12.40000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     81.000 48.56296 2
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     3,500.000 6.95000 1
105 2014 REMOVING STAB BASE & ASPH PAV (7" - 12") SY 20.000 25.00000 3,020.000 7.06954 2
105 2016 REMOVING STAB BASE & ASPH PAV (16") SY     820.000 43.00000 2
105 2018 REMOVING STAB BASE AND ASPH PAV (7") SY     2,440.000 6.00000 1
105 2019 REMOVING STAB BASE & ASPH PAV (14") SY     1,591.040 12.25000 1
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     1,365.000 17.90110 2
105 2026 REMOVE STAB BASE & ASPH PAV (13" - 18") SY     4,500.000 10.00000 1
105 2041 REMOVING STAB BASE AND ASPH PAV (8") SY     1,228.000 16.07065 3
105 2050 REMOV STAB BASE AND ASPH PAV (24") SY     419.000 9.99000 1
105 2058 REMOVING STAB BASE & ASPH PAV (10" - 12" SY     1,498.000 25.00000 1
105 2069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     197.000 12.00000 1
105 2074 REMOVING STAB BASE AND ASPH PAV (4") SY     825.330 10.00000 1
105 2079 REMOVING STAB BASE & ASPH PAV (4" - 12") SY     1,826.000 11.00000 1
110 2001 EXCAVATION (ROADWAY) CY     49,975.400 10.49925 32
110 2002 EXCAVATION (CHANNEL) CY     9,183.000 15.07830 10
110 2003 EXCAVATION (SPECIAL) CY 30.000 38.97000 10,715.400 17.20965 14
112 2001 SUBGRADE WIDENING (ORD COMP) STA 194.550 412.00000 4,892.010 256.60667 30
112 2002 SUBGRADE WIDENING (DENS CONT) STA     1,341.910 203.41843 7
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY 6.000 100.00000 6,852.500 22.14251 15
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     2,577.000 21.06752 2
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     10,135.700 12.60033 16
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     17,988.000 14.78031 7
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     7,330.700 15.32146 9
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 683.000 25.00000 1,328.000 25.71536 4
132 2007 EMBANKMENT (FINAL) (ORD COMP) (TY D) CY     3,044.000 31.54599 7
132 2008 EMBANKMENT (FINAL) (DENS CONT) (TY D) CY     1,628.000 25.00000 1
132 2013 EMBANKMENT (ORIGINAL) (ORD COMP) (TY C) CY     637.000 31.00000 1
132 2015 EMBANKMENT (ORIGINAL) (ORD COMP) (TY D) CY     165.000 43.69697 2
132 2017 EMBANKMENT (VEHICLE) (ORD COMP) (TY A) CY     442.000 30.85973 3
132 2019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY 295.000 39.59322 7,754.500 25.96335 27
132 2021 EMBANKMENT (VEHICLE) (ORD COMP) (TY C) CY     13,852.000 16.20486 5
132 2036 EMBANK (FINAL) (DC) (TY E) (CSBE) CY     10.000 20.00000 1
134 2001 BACKFILL (TY A) STA 100.000 335.00000 6,243.080 87.57285 14
134 2002 BACKFILL (TY B) STA 294.550 230.87133 5,912.180 114.37496 34
134 2003 BACKFILL (TY C) STA     3,224.000 101.48883 2
134 2004 BACKFILL (TY A OR B) STA     3,989.120 158.07867 17
134 2005 BACKFILL TY A CY     14.800 200.00000 1
134 2010 BACKFILL (TY B) LF     339,615.000 0.45000 2
150 2001 BLADING STA 4,024.090 32.00000 20,506.810 37.15742 16
150 2002 BLADING HR 11.000 83.63636 900.000 110.02028 30
152 2001 ROAD GRADER WORK (ORD COMP) STA     1,324.080 138.63583 7
156 2001 BULLDOZER WORK HR     424.000 51.13208 2
158 2002 SPEC EXCAV WORK (BACKHOE) HR     142.000 95.21127 4
158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR     206.000 88.96117 5
158 2005 SPEC EXCAV WORK (ORIGINAL) CY     338.000 47.34911 3
158 2006 SPEC EXCAV WORK (VEHICLE) CY     355.000 17.00000 1
160 2001 FURNISHING AND PLACING TOPSOIL (4") STA     124.690 275.00000 1
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     43,989.300 1.65093 11
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY     31.000 8.46000 1
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY     504.000 2.00000 1
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY     312.000 6.75000 1
161 2008 EROSION CONTROL COMPOST (2") SY     120.000 6.00000 1
161 2014 COMPOST MANUF TOPSOIL (BOS OR PB) (4") SY     17,144.000 4.00000 1
161 2017 COMPOST MANUF TOPSOIL (BIP) (4") SY     2,260.000 2.19000 1
162 2002 BLOCK SODDING SY     31,452.000 3.70804 22
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     390,121.300 0.13583 19
164 2002 BROADCAST SEED (PERM) (RURAL) (SANDY) AC     32.510 561.59151 4
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 3,520.000 0.13000 152,723.760 0.21369 13
164 2004 BROADCAST SEED (PERM) (RURAL) (CLAY) AC     12.000 611.67000 2
164 2005 BROADCAST SEED (PERM) (URBAN) (SANDY) SY     3,000.000 0.39000 1
164 2007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY     15,269.000 0.78822 8
164 2009 BROADCAST SEED (TEMP) (WARM) SY     118,229.000 0.19650 15
164 2010 BROADCAST SEED (TEMP) (WARM) AC     5.100 424.00000 1