AVERAGE LOW BID UNIT PRICE - MAINTENANCE - STATEWIDE

Last Update: Friday, October 3, 2014
ITEMS 100 2001 TO 164 2009
Items Items Bid Code Range
0100 - 0169
0204 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0700 - 0788
1004 - 1138
2144 - 2303
3035 - 3288
4003 - 4568
5049 - 5953
6005 - 6986
7008 - 7658
8020 - 8987
100 2001 - 164 2009
164 2010 - 169 2006
Item No Description Units Septembe 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     9.246 10,751.61151 10
100 2002 PREPARING ROW STA 27.940 1,672.09986 1,309.190 414.27952 33
100 2003 PREPARING ROW (TREE) (5" TO 12" DIA) EA     64.000 328.12500 2
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     1.000 1,000.00000 1
100 2008 PREPARING ROW (TREE) (0" TO 6" DIA) EA     13.000 203.84615 4
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     1.000 2,400.00000 1
100 2017 PREP ROW (TREE) (GREATER THAN 8 IN DIA) EA     3.000 2,000.00000 1
100 2020 PREPARING ROW (DENSITY A) STA     75.040 4,800.00000 1
100 2021 PREPARING ROW (DENSITY B) STA     15.030 4,800.00000 1
100 2022 PREPARING ROW (DENSITY C) STA     96.290 4,800.00000 1
104 2001 REMOVING CONC (PAV) SY 73.000 21.50000 4,336.000 27.70732 7
104 2009 REMOVING CONC (RIPRAP) SY 728.000 13.48853 6,929.750 27.16682 42
104 2010 REMOVING CONC (RIPRAP) CY 250.000 32.50000 589.500 43.62629 8
104 2011 REMOVING CONC (MEDIANS) SY     249.000 30.56454 3
104 2012 REMOVING CONC (MEDIANS) CY     130.000 57.67000 1
104 2013 REMOVING CONC (FOUNDATIONS) SY     13.000 200.74000 1
104 2014 REMOVING CONC (FOUNDATIONS) CY     74.000 375.27027 3
104 2015 REMOVING CONC (SIDEWALKS) SY 80.000 60.00000 1,514.300 22.01109 17
104 2017 REMOVING CONC (DRIVEWAYS) SY 83.000 18.50000 807.900 22.51516 8
104 2020 REMOVING CONC (OTHER APPURTENANCES) CY 150.560 261.63656 150.560 261.63656 2
104 2021 REMOVING CONC (CURB) LF 4,227.000 5.84230 17,040.000 11.90175 32
104 2022 REMOVING CONC (CURB AND GUTTER) LF 300.000 11.50000 4,057.000 13.03061 13
104 2023 REMOVING CONC (CTB) LF     2,188.000 29.99589 4
104 2025 REMOVE CONC (WINGWALL) CY     95.800 454.07098 4
104 2027 REMOVING CONC (APPR SLAB) SY     763.000 53.58322 4
104 2028 REMOVING CONC (MISC) SY     1,192.600 38.43158 9
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     265.000 9.00000 1
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY     148.000 22.39865 3
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     112.000 29.93750 2
104 2037 REMOVE CONC (RAIL) LF     812.500 57.60825 6
104 2040 REMOVING CONC (PAVERS) SY 1,400.000 11.50000 1,800.000 12.00000 3
104 2044 REMOVING CONC (FLUME) SY     485.000 44.92784 3
104 2045 REMOVE CONC (MISC) EA     25.000 828.00000 2
104 2048 REMOVING CONC (SIDEWALKS) (RMA) SY     550.000 10.00000 1
104 2054 REMOVING CONCRETE (MOW STRIP) LF     50.000 20.00000 1
105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY     4,554.000 5.00000 1
105 2005 REMOVING STAB BASE AND ASPH PAV (3") SY     340.000 12.40000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY 64.000 34.90000 81.000 48.56296 2
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY 3,500.000 6.95000 3,500.000 6.95000 1
105 2014 REMOVING STAB BASE & ASPH PAV (7" - 12") SY 3,000.000 6.95000 3,040.000 7.13487 3
105 2016 REMOVING STAB BASE & ASPH PAV (16") SY     820.000 43.00000 2
105 2018 REMOVING STAB BASE AND ASPH PAV (7") SY     2,440.000 6.00000 1
105 2019 REMOVING STAB BASE & ASPH PAV (14") SY     1,591.040 12.25000 1
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY 396.000 25.00000 1,365.000 17.90110 2
105 2026 REMOVE STAB BASE & ASPH PAV (13" - 18") SY     4,500.000 10.00000 1
105 2041 REMOVING STAB BASE AND ASPH PAV (8") SY 166.000 27.70000 1,228.000 16.07065 3
105 2050 REMOV STAB BASE AND ASPH PAV (24") SY     419.000 9.99000 1
105 2058 REMOVING STAB BASE & ASPH PAV (10" - 12" SY     1,498.000 25.00000 1
105 2069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     197.000 12.00000 1
105 2074 REMOVING STAB BASE AND ASPH PAV (4") SY     825.330 10.00000 1
105 2079 REMOVING STAB BASE & ASPH PAV (4" - 12") SY     1,826.000 11.00000 1
110 2001 EXCAVATION (ROADWAY) CY 752.000 16.50000 50,617.400 10.57795 34
110 2002 EXCAVATION (CHANNEL) CY     9,860.000 15.22348 12
110 2003 EXCAVATION (SPECIAL) CY 1,000.000 10.00000 10,742.400 17.19022 14
112 2001 SUBGRADE WIDENING (ORD COMP) STA 345.640 268.23076 4,918.430 251.10869 31
112 2002 SUBGRADE WIDENING (DENS CONT) STA     1,544.670 197.71914 8
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY 2,000.000 22.15000 6,846.500 22.07428 14
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY 917.000 23.00000 2,577.000 21.06752 2
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     10,285.700 12.75199 17
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     18,502.000 15.13062 8
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     9,514.700 18.59885 12
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     645.000 26.47287 3
132 2007 EMBANKMENT (FINAL) (ORD COMP) (TY D) CY     3,044.000 31.54599 7
132 2008 EMBANKMENT (FINAL) (DENS CONT) (TY D) CY     1,628.000 25.00000 1
132 2013 EMBANKMENT (ORIGINAL) (ORD COMP) (TY C) CY     637.000 31.00000 1
132 2015 EMBANKMENT (ORIGINAL) (ORD COMP) (TY D) CY     165.000 43.69697 2
132 2017 EMBANKMENT (VEHICLE) (ORD COMP) (TY A) CY     442.000 30.85973 3
132 2019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     8,839.500 22.58417 28
132 2021 EMBANKMENT (VEHICLE) (ORD COMP) (TY C) CY     13,852.000 16.20486 5
132 2036 EMBANK (FINAL) (DC) (TY E) (CSBE) CY     10.000 20.00000 1
134 2001 BACKFILL (TY A) STA 200.000 200.00000 6,143.080 83.54511 13
134 2002 BACKFILL (TY B) STA 341.000 184.12610 6,006.360 103.64342 34
134 2003 BACKFILL (TY C) STA     3,224.000 101.48883 2
134 2004 BACKFILL (TY A OR B) STA 21.100 680.20000 3,989.120 158.07867 17
134 2005 BACKFILL TY A CY     14.800 200.00000 1
134 2010 BACKFILL (TY B) LF     339,615.000 0.45000 2
150 2001 BLADING STA     16,846.480 39.26012 17
150 2002 BLADING HR 100.000 95.00000 923.000 113.35607 30
152 2001 ROAD GRADER WORK (ORD COMP) STA     1,324.080 138.63583 7
156 2001 BULLDOZER WORK HR 400.000 50.00000 424.000 51.13208 2
158 2002 SPEC EXCAV WORK (BACKHOE) HR 100.000 100.00000 142.000 95.21127 4
158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR 125.000 100.00000 206.000 88.96117 5
158 2005 SPEC EXCAV WORK (ORIGINAL) CY     738.000 29.81572 4
158 2006 SPEC EXCAV WORK (VEHICLE) CY     1,802.000 15.39401 2
160 2001 FURNISHING AND PLACING TOPSOIL (4") STA     124.690 275.00000 1
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY 20.000 15.00000 44,161.300 1.65423 12
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY     531.000 5.20200 2
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY     504.000 2.00000 1
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY     312.000 6.75000 1
161 2008 EROSION CONTROL COMPOST (2") SY     120.000 6.00000 1
161 2014 COMPOST MANUF TOPSOIL (BOS OR PB) (4") SY     17,144.000 4.00000 1
161 2017 COMPOST MANUF TOPSOIL (BIP) (4") SY     2,260.000 2.19000 1
162 2002 BLOCK SODDING SY 8,771.000 3.72013 34,964.000 4.08707 24
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 70,401.000 0.11667 390,121.300 0.13583 19
164 2002 BROADCAST SEED (PERM) (RURAL) (SANDY) AC     32.510 561.59151 4
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY     153,786.760 0.23780 14
164 2004 BROADCAST SEED (PERM) (RURAL) (CLAY) AC     12.000 611.67000 2
164 2005 BROADCAST SEED (PERM) (URBAN) (SANDY) SY     3,000.000 0.39000 1
164 2007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY 220.000 12.72727 15,269.000 0.78822 8
164 2009 BROADCAST SEED (TEMP) (WARM) SY     131,360.000 0.21525 19