Letting Schedule for November, 2005 (FY 2006)

 
 
Last Update: Monday, August 28, 2006
November, 2005 (FY 2006) (see Links)
SEP 2005 | OCT 2005 | NOV 2005 | DEC 2005 | JAN 2006 | FEB 2006 | MAR 2006 | APR 2006 | MAY 2006 | JUN 2006 | JUL 2006 | AUG 2006
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0109-01-048 Anderson/
Tyler
US 287 Actual $2,083,225 8 ADD LEFT TURN LANE
0890-02-016 Anderson/
Tyler
FM 315 Actual $6,965,803 8 WIDEN ROADWAY TO 24'
0017-02-067 Bexar/
San Antonio
IH 35 Actual $5,643,909 1 SEAL COAT AND PAVEMENT MARKINGS ON FRONTAGE ROADS
0915-12-431 Bexar/
San Antonio
VA Actual $1,410,548 10 CONSTRUCT ADA CURB RAMPS
0558-02-007 Borden/
Abilene
FM 669 Actual $798,345 6 REPLACE BRIDGE AND APPROACHES
0252-02-045 Burnet/
Austin
US 281 Actual $85,652 10 CONSTRUCT LEFT TURN LANE
0437-03-016 Callahan/
Abilene
US 283 Actual $4,033,250 6 REPLACE EXISTING RAILROAD UNDERPASS AND APPROACHES
0921-06-180 Cameron/
Pharr
CR Actual $886,250 6 REPLACE BRIDGE AND APPROACHES
0047-06-129 Collin/
Dallas
US 75 Actual $8,263,606 10 RELOCATION AND REVERSAL OF SEVERAL RAMPS AND INCLUDE
0047-14-061 Collin/
Dallas
US 75 Actual $1,343,998 8 INSTALL MEDIAN BARRIER
0470-03-017 Comal/
San Antonio
FM 1863 Actual $9,053,804 11 WIDEN NARROW ROADWAY AND ADD SHOULDERS
2021-01-011 Comal/
San Antonio
FM 1044 Actual $962,431 1 WIDEN NARROW ROADWAY AND ADD SHOULDERS
8403-15-001 Comal/
San Antonio
MH Actual $493,023 6 REPLACING BRIDGE & APPROACHES
0035-03-042 Concho/
San Angelo
US 83 Actual $713,900 1 RETRACE PAVEMENT MARKINGS
0184-01-055 Coryell/
Waco
SH 36 Actual $8,599,168 1 SEAL COAT
0905-21-002 Crosby/
Lubbock
VA Actual $424,249 9 TRANSPORTATION ENHANCEMENT PROJECT
0002-20-007 Culberson/
El Paso
BI 10-D Actual $7,464,039 1 2006 SEAL COAT PROGRAM
0009-11-213 Dallas/
Dallas
IH 30 Actual $223,833 10 LANDSCAPE DEVELOPMENT
0196-03-225 Dallas/
Dallas
IH 35E Actual $3,277,500 1 RECONSTRUCT EXISTING PAVEMENT AND CONSTRUCT AUXILIARY LANE
0261-02-058 Dallas/
Dallas
US 67 Actual $423,721 5 INTERSECTION IMPROVEMENTS ON FRONTAGE ROAD
0918-00-099 Dallas/
Dallas
VA Actual $1,990,649 1 NON SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION
0918-46-161 Denton/
Dallas
CR Actual $516,385 6 REPLACE BRIDGE AND APPROACHES
0269-06-050 Dewitt/
Yoakum
US 183 Actual $2,899,008 1 SAFETY TREAT FIXED OBJECTS
0007-04-106 Eastland/
Brownwood
SH 6 Actual $7,502,743 1 SEAL COAT
0288-03-021 Eastland/
Brownwood
SH 16 Actual $881,123 1 REWORK EXISTING BASE, NEW FLEX BASE, AND SURFACE TREAT
0923-09-043 Eastland/
Brownwood
VA Actual $86,530 10 LANDSCAPE DEVELOPMENT
0005-13-045 Ector/
Odessa
IH 20 Actual $166,341 11 INSTALL TRAFFIC SIGNALS
0045-06-050 Fannin/
Paris
SH 56 Actual $1,951,516 1 SEAL COAT
3422-01-010 Fort Bend/
Houston
PR 72 Actual $813,788 10 CROSS CULVERT REPAIR
0017-07-087 Frio/
San Antonio
IH 35 Actual $3,820,871 1 SEAL COAT & PAVEMENT MARKINGS
0912-73-079 Galveston/
Houston
CS Actual $699,659 6 REPLACE BRIDGE
0053-05-047 Garza/
Lubbock
US 84 Actual $9,430,558 1 SEAL COAT
0091-01-043 Grayson/
Paris
SH 289 Actual $744,000 10 RIGHT OF WAY ACQUISITION, UTILITY ADJUSTMENT AND RELOCATION
0050-06-066 Harris/
Houston
US 290 Actual $1,235,808 7 DETENTION PONDS #2 AND #3
0110-05-110 Harris/
Houston
IH 45 Actual $355,389 1 RESHAPE EXISTING CHANNEL & CONSTRUCT RIPRAP
0271-15-080 Harris/
Houston
IH 610 Actual $25,000 11 HIGH VESSEL DETECTION SYSTEM
0508-01-318 Harris/
Houston
IH 10 Actual $2,599,195 1 CONVERT 2 - WAY FRONTAGE ROAD TO TO A 1 - WAY
0208-04-011 Harrison/
Atlanta
FM 2198 Actual $8,356,315 8 WIDEN LANES ON EXISTING ROADWAY
0009-09-091 Hopkins/
Paris
IH 30 Actual $1,210,039 1 SEAL COAT
0213-08-082 Jasper/
Beaumont
US 190 Actual $477,140 1 MILL AND OVERLAY EXISTING ROADWAY
0255-01-073 Jim Wells/
Corpus Christi
US 281 Actual $3,656,327 1 SEAL COAT ROADWAY (2006 LOW CONTROL CSJ SOUTH SEAL COAT)
0914-21-025 Lee/
Austin
CR Actual $448,647 6 REPLACE BRIDGE AND APPROACHES
0951-01-057 Liberty/
Beaumont
SH 105 Actual $8,682,561 1 REHABILITATE EXISTING ROADWAY AND ADD SHOULDERS
1547-01-042 Medina/
San Antonio
FM 471 Actual $93,303 1 CONSTRUCT DRAINAGE DITCH
0005-08-091 Mitchell/
Abilene
IH 20 Actual $4,831,235 1 SEAL COAT
0499-02-026 Newton/
Beaumont
SH 12 Actual $5,906,499 1 REHABILITATE EXISTING ROADWAY
0052-01-037 Parmer/
Lubbock
US 70 Actual $8,859,388 1 SEAL COAT
0904-00-117 Potter/
Amarillo
VA Actual $127,701 1 TEXTURIZE SHOULDERS
0904-00-118 Potter/
Amarillo
VA Actual $184,963 1 TEXTURIZE SHOULDERS
0904-00-120 Potter/
Amarillo
VA Actual $230,276 1 CRACK POURING
0003-05-044 Reeves/
Odessa
IH 20 Actual $8,312,666 1 SEAL COAT
1559-01-021 San Patricio/
Corpus Christi
FM 1074 Actual $1,465,487 1 RESTORATION OF ROADWAY
0006-10-009 Taylor/
Abilene
FM 18 Actual $5,372,108 1 SEAL COAT
0095-06-060 Van Zandt/
Tyler
US 80 Actual $10,484,671 1 SEAL COAT AND PAVEMENT MARKINGS
0840-05-017 Victoria/
Yoakum
FM 444 Actual $4,857,672 1 RESTORE ROADWAY
0675-06-080 Walker/
Bryan
IH 45 Actual $17,852,485 9 RECONSTRUCT EXISTING NORTH AND SOUTH BOUND SAFETY REST AREAS


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract