Letting Schedule for November, 2005 (FY 2006)
Letting Schedule for November, 2005 (FY 2006) | ||||
Last Update: Monday, August 28, 2006 |
November, 2005 (FY 2006) | (see Links) |
SEP 2005 | OCT 2005 | NOV 2005 | DEC 2005 | JAN 2006 | FEB 2006 | MAR 2006 | APR 2006 | MAY 2006 | JUN 2006 | JUL 2006 | AUG 2006 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0109-01-048 | Anderson/ Tyler |
US 287 | Actual | $2,083,225 | 8 | ADD LEFT TURN LANE |
0890-02-016 | Anderson/ Tyler |
FM 315 | Actual | $6,965,803 | 8 | WIDEN ROADWAY TO 24' |
0017-02-067 | Bexar/ San Antonio |
IH 35 | Actual | $5,643,909 | 1 | SEAL COAT AND PAVEMENT MARKINGS ON FRONTAGE ROADS |
0915-12-431 | Bexar/ San Antonio |
VA | Actual | $1,410,548 | 10 | CONSTRUCT ADA CURB RAMPS |
0558-02-007 | Borden/ Abilene |
FM 669 | Actual | $798,345 | 6 | REPLACE BRIDGE AND APPROACHES |
0252-02-045 | Burnet/ Austin |
US 281 | Actual | $85,652 | 10 | CONSTRUCT LEFT TURN LANE |
0437-03-016 | Callahan/ Abilene |
US 283 | Actual | $4,033,250 | 6 | REPLACE EXISTING RAILROAD UNDERPASS AND APPROACHES |
0921-06-180 | Cameron/ Pharr |
CR | Actual | $886,250 | 6 | REPLACE BRIDGE AND APPROACHES |
0047-06-129 | Collin/ Dallas |
US 75 | Actual | $8,263,606 | 10 | RELOCATION AND REVERSAL OF SEVERAL RAMPS AND INCLUDE |
0047-14-061 | Collin/ Dallas |
US 75 | Actual | $1,343,998 | 8 | INSTALL MEDIAN BARRIER |
0470-03-017 | Comal/ San Antonio |
FM 1863 | Actual | $9,053,804 | 11 | WIDEN NARROW ROADWAY AND ADD SHOULDERS |
2021-01-011 | Comal/ San Antonio |
FM 1044 | Actual | $962,431 | 1 | WIDEN NARROW ROADWAY AND ADD SHOULDERS |
8403-15-001 | Comal/ San Antonio |
MH | Actual | $493,023 | 6 | REPLACING BRIDGE & APPROACHES |
0035-03-042 | Concho/ San Angelo |
US 83 | Actual | $713,900 | 1 | RETRACE PAVEMENT MARKINGS |
0184-01-055 | Coryell/ Waco |
SH 36 | Actual | $8,599,168 | 1 | SEAL COAT |
0905-21-002 | Crosby/ Lubbock |
VA | Actual | $424,249 | 9 | TRANSPORTATION ENHANCEMENT PROJECT |
0002-20-007 | Culberson/ El Paso |
BI 10-D | Actual | $7,464,039 | 1 | 2006 SEAL COAT PROGRAM |
0009-11-213 | Dallas/ Dallas |
IH 30 | Actual | $223,833 | 10 | LANDSCAPE DEVELOPMENT |
0196-03-225 | Dallas/ Dallas |
IH 35E | Actual | $3,277,500 | 1 | RECONSTRUCT EXISTING PAVEMENT AND CONSTRUCT AUXILIARY LANE |
0261-02-058 | Dallas/ Dallas |
US 67 | Actual | $423,721 | 5 | INTERSECTION IMPROVEMENTS ON FRONTAGE ROAD |
0918-00-099 | Dallas/ Dallas |
VA | Actual | $1,990,649 | 1 | NON SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION |
0918-46-161 | Denton/ Dallas |
CR | Actual | $516,385 | 6 | REPLACE BRIDGE AND APPROACHES |
0269-06-050 | Dewitt/ Yoakum |
US 183 | Actual | $2,899,008 | 1 | SAFETY TREAT FIXED OBJECTS |
0007-04-106 | Eastland/ Brownwood |
SH 6 | Actual | $7,502,743 | 1 | SEAL COAT |
0288-03-021 | Eastland/ Brownwood |
SH 16 | Actual | $881,123 | 1 | REWORK EXISTING BASE, NEW FLEX BASE, AND SURFACE TREAT |
0923-09-043 | Eastland/ Brownwood |
VA | Actual | $86,530 | 10 | LANDSCAPE DEVELOPMENT |
0005-13-045 | Ector/ Odessa |
IH 20 | Actual | $166,341 | 11 | INSTALL TRAFFIC SIGNALS |
0045-06-050 | Fannin/ Paris |
SH 56 | Actual | $1,951,516 | 1 | SEAL COAT |
3422-01-010 | Fort Bend/ Houston |
PR 72 | Actual | $813,788 | 10 | CROSS CULVERT REPAIR |
0017-07-087 | Frio/ San Antonio |
IH 35 | Actual | $3,820,871 | 1 | SEAL COAT & PAVEMENT MARKINGS |
0912-73-079 | Galveston/ Houston |
CS | Actual | $699,659 | 6 | REPLACE BRIDGE |
0053-05-047 | Garza/ Lubbock |
US 84 | Actual | $9,430,558 | 1 | SEAL COAT |
0091-01-043 | Grayson/ Paris |
SH 289 | Actual | $744,000 | 10 | RIGHT OF WAY ACQUISITION, UTILITY ADJUSTMENT AND RELOCATION |
0050-06-066 | Harris/ Houston |
US 290 | Actual | $1,235,808 | 7 | DETENTION PONDS #2 AND #3 |
0110-05-110 | Harris/ Houston |
IH 45 | Actual | $355,389 | 1 | RESHAPE EXISTING CHANNEL & CONSTRUCT RIPRAP |
0271-15-080 | Harris/ Houston |
IH 610 | Actual | $25,000 | 11 | HIGH VESSEL DETECTION SYSTEM |
0508-01-318 | Harris/ Houston |
IH 10 | Actual | $2,599,195 | 1 | CONVERT 2 - WAY FRONTAGE ROAD TO TO A 1 - WAY |
0208-04-011 | Harrison/ Atlanta |
FM 2198 | Actual | $8,356,315 | 8 | WIDEN LANES ON EXISTING ROADWAY |
0009-09-091 | Hopkins/ Paris |
IH 30 | Actual | $1,210,039 | 1 | SEAL COAT |
0213-08-082 | Jasper/ Beaumont |
US 190 | Actual | $477,140 | 1 | MILL AND OVERLAY EXISTING ROADWAY |
0255-01-073 | Jim Wells/ Corpus Christi |
US 281 | Actual | $3,656,327 | 1 | SEAL COAT ROADWAY (2006 LOW CONTROL CSJ SOUTH SEAL COAT) |
0914-21-025 | Lee/ Austin |
CR | Actual | $448,647 | 6 | REPLACE BRIDGE AND APPROACHES |
0951-01-057 | Liberty/ Beaumont |
SH 105 | Actual | $8,682,561 | 1 | REHABILITATE EXISTING ROADWAY AND ADD SHOULDERS |
1547-01-042 | Medina/ San Antonio |
FM 471 | Actual | $93,303 | 1 | CONSTRUCT DRAINAGE DITCH |
0005-08-091 | Mitchell/ Abilene |
IH 20 | Actual | $4,831,235 | 1 | SEAL COAT |
0499-02-026 | Newton/ Beaumont |
SH 12 | Actual | $5,906,499 | 1 | REHABILITATE EXISTING ROADWAY |
0052-01-037 | Parmer/ Lubbock |
US 70 | Actual | $8,859,388 | 1 | SEAL COAT |
0904-00-117 | Potter/ Amarillo |
VA | Actual | $127,701 | 1 | TEXTURIZE SHOULDERS |
0904-00-118 | Potter/ Amarillo |
VA | Actual | $184,963 | 1 | TEXTURIZE SHOULDERS |
0904-00-120 | Potter/ Amarillo |
VA | Actual | $230,276 | 1 | CRACK POURING |
0003-05-044 | Reeves/ Odessa |
IH 20 | Actual | $8,312,666 | 1 | SEAL COAT |
1559-01-021 | San Patricio/ Corpus Christi |
FM 1074 | Actual | $1,465,487 | 1 | RESTORATION OF ROADWAY |
0006-10-009 | Taylor/ Abilene |
FM 18 | Actual | $5,372,108 | 1 | SEAL COAT |
0095-06-060 | Van Zandt/ Tyler |
US 80 | Actual | $10,484,671 | 1 | SEAL COAT AND PAVEMENT MARKINGS |
0840-05-017 | Victoria/ Yoakum |
FM 444 | Actual | $4,857,672 | 1 | RESTORE ROADWAY |
0675-06-080 | Walker/ Bryan |
IH 45 | Actual | $17,852,485 | 9 | RECONSTRUCT EXISTING NORTH AND SOUTH BOUND SAFETY REST AREAS |
|
|