Detail Letting Schedule for Bexar County (FY 2008)

 
 
Last Update: Monday, February 2, 2009
Bexar County (FY 2008)

CCSJ: 0016-07-125

District: San Antonio Let Date: DEC 2007
Highway: IH 35 Let Status: Actual
Project ID: IM 0352(327) CSJ: 0016-07-125
Description: RECONFIGURE INTERCHANGE Handling
Code:
 
Limits From: AT SH 218 Fund Cat: 11
Limits To: . Estimate: $7,847,167
Length: 1.3 Miles Actual: $6,610,139
 
Back...

Totals for 0016-07-125
Length: 1.3 Miles
Estimate: $7,847,167
Actual: $6,610,139

CCSJ: 0017-02-068

District: San Antonio Let Date: SEP 2007
Highway: IH 35 Let Status: Actual
Project ID: IM 0352(323) CSJ: 0017-02-068
Description: CONSTRUCT LANDSCAPE AND IRRIGATION SYSTEM Handling
Code:
 
Limits From: IH 35S Fund Cat: 10
Limits To: @ IH 410 Estimate: $365,145
Length: 0.6 Miles Actual: $331,759
 
Back...

Totals for 0017-02-068
Length: 0.6 Miles
Estimate: $365,145
Actual: $331,759

CCSJ: 0017-02-071

District: San Antonio Let Date: JAN 2008
Highway: IH 35 Let Status: Actual
Project ID: IM 0352(328) CSJ: 0017-02-071
Description: RECONSTRUCT FRONTAGE ROADS / RAMPS, REPLACE FR RD BRIDGES @ Handling
Code:
 
Limits From: OLD QUINTANA RD. Fund Cat: 11
Limits To: FISCHER RD. Estimate: $9,791,287
Length: 2.0 Miles Actual: $8,385,286
 
Back...

Totals for 0017-02-071
Length: 2.0 Miles
Estimate: $9,791,287
Actual: $8,385,286

CCSJ: 0017-10-231

District: San Antonio Let Date: DEC 2007
Highway: IH 35 Let Status: Actual
Project ID: IM 0352(324) CSJ: 0017-10-231
Description: REPLACE WALTERS ST BRIDGE - ADD TURNAROUNDS, RECONST & WIDEN Handling
Code:
 
Limits From: NEW BRAUNFELS AVE Fund Cat: 12
Limits To: AT&T PARKWAY Estimate: $20,652,100
Length: 1.4 Miles Actual: $22,554,694
 
District: San Antonio Let Date: DEC 2007
Highway: IH 35 Let Status: Actual
Project ID: RW 17-10-247 CSJ: 0017-10-247
Description: ROW ACQUISITION, RELOCATION & UTILITIES ADJUSTMENT Handling
Code:
 
Limits From: NEW BRAUNFELS AVE Fund Cat: 2
Limits To: AT&T PARKWAY Estimate:  
Length: 1.4 Miles Actual: $24,875
 
Back...

Totals for 0017-10-231
Length: 2.8 Miles
Estimate: $20,652,100
Actual: $22,579,569

CCSJ: 0017-10-233

District: San Antonio Let Date: JAN 2008
Highway: IH 35 Let Status: Actual
Project ID: BR 2008(297) CSJ: 0017-10-233
Description: WIDEN NARROW BRIDGE & APPROACHES Handling
Code:
 
Limits From: SB ML AT ABAND SPRR & FRANK ST. Fund Cat: 6
Limits To: . Estimate: $754,540
Length: 0.1 Miles Actual: $939,261
 
Back...

Totals for 0017-10-233
Length: 0.1 Miles
Estimate: $754,540
Actual: $939,261

CCSJ: 0017-10-236

District: San Antonio Let Date: APR 2008
Highway: IH 35 Let Status: Actual
Project ID: BR 2008(302) CSJ: 0017-10-236
Description: WIDEN NARROW BRIDGE & APPROACHES Handling
Code:
 
Limits From: AT IH 410 CONN-F (BENZ-ENGLEMAN) Fund Cat: 6
Limits To: . Estimate: $1,278,541
Length: 0.1 Miles Actual: $1,092,502
 
District: San Antonio Let Date: APR 2008
Highway: IH 35 Let Status: Actual
Project ID: BR 2008(302) CSJ: 0017-10-237
Description: WIDEN NARROW BRIDGE & APPROACHES Handling
Code:
 
Limits From: IH 35 NB CONN E AT IH 35 NB FR & SP Fund Cat: 6
Limits To: . Estimate: $1,303,693
Length: 0.1 Miles Actual: $1,226,690
 
Back...

Totals for 0017-10-236
Length: 0.2 Miles
Estimate: $2,582,234
Actual: $2,319,192

CCSJ: 0017-10-245

District: San Antonio Let Date: JUL 2008
Highway: IH 35 Let Status: Actual
Project ID: IM 0352(326) CSJ: 0017-10-245
Description: RECONSTRUCT AND WIDEN NARROW ROADWAY NB FRONTAGE RD., Handling
Code:
 
Limits From: IH 410 SOUTH @ BINZ ENGLEMAN RD Fund Cat: 7
Limits To: 0.2 MI NORTH OF RITTIMAN RD Estimate: $3,877,170
Length: 2.3 Miles Actual: $3,656,544
 
Back...

Totals for 0017-10-245
Length: 2.3 Miles
Estimate: $3,877,170
Actual: $3,656,544

CCSJ: 0024-08-122

District: San Antonio Let Date: OCT 2007
Highway: US 90 Let Status: Actual
Project ID: BR 2006(491) CSJ: 0024-08-122
Description: REPLACE NARROW BRIDGE & APPROACHES Handling
Code:
 
Limits From: AT OLD HWY 90 Fund Cat: 6
Limits To: . Estimate: $1,479,874
Length: 0.0 Miles Actual: $1,382,095
 
District: San Antonio Let Date: OCT 2007
Highway: US 90 Let Status: Actual
Project ID: NH 2006(492) CSJ: 0024-08-123
Description: RECONSTRUCT RAMPS AND OPERATIONAL IMPROVEMENTS Handling
Code:
 
Limits From: 0.41 MI W OF LP 13 Fund Cat: 1
Limits To: CALLAGHAN ROAD Estimate: $3,275,248
Length: 2.2 Miles Actual: $2,765,229
 
Back...

Totals for 0024-08-122
Length: 2.2 Miles
Estimate: $4,755,122
Actual: $4,147,324

CCSJ: 0024-08-124

District: San Antonio Let Date: APR 2008
Highway: US 90 Let Status: Actual
Project ID: BR 2008(501) CSJ: 0024-08-124
Description: WIDEN NARROW BRIDGE AND APPROACHES Handling
Code:
 
Limits From: WESTBOUND FRONTAGE RD AT SH 151 NB Fund Cat: 6
Limits To: . Estimate: $571,589
Length: 0.1 Miles Actual: $695,100
 
Back...

Totals for 0024-08-124
Length: 0.1 Miles
Estimate: $571,589
Actual: $695,100

CCSJ: 0025-02-177

District: San Antonio Let Date: NOV 2007
Highway: IH 10 Let Status: Actual
Project ID: BR 2007(589) CSJ: 0025-02-177
Description: WIDEN NARROW BRIDGE AND APPROACHES Handling
Code:
 
Limits From: AT IH 10 SFR AT SALITRILLO CREEK Fund Cat: 6
Limits To: . Estimate: $463,330
Length: 0.1 Miles Actual: $438,442
 
District: San Antonio Let Date: NOV 2007
Highway: IH 10 Let Status: Actual
Project ID: BR 2007(589) CSJ: 0025-02-178
Description: WIDEN NARROW BRIDGE AND APPROACHES Handling
Code:
 
Limits From: NFR AT SALITRILLO CREEK Fund Cat: 6
Limits To: . Estimate: $438,727
Length: 0.1 Miles Actual: $423,306
 
Back...

Totals for 0025-02-177
Length: 0.2 Miles
Estimate: $902,057
Actual: $861,748

CCSJ: 0073-08-155

District: San Antonio Let Date: SEP 2007
Highway: IH 37 Let Status: Actual
Project ID: IM 0372(083) CSJ: 0073-08-155
Description: CONSTRUCT LANDSCAPING AND IRRIGATION SYSTEM Handling
Code:
 
Limits From: IH 37S Fund Cat: 10
Limits To: @ IH 410 Estimate: $738,101
Length: 1.5 Miles Actual: $665,952
 
Back...

Totals for 0073-08-155
Length: 1.5 Miles
Estimate: $738,101
Actual: $665,952

CCSJ: 0100-02-057

District: San Antonio Let Date: JAN 2008
Highway: US 181 Let Status: Actual
Project ID: BR 2008(178) CSJ: 0100-02-057
Description: WIDEN NARROW BRIDGE & APPROACHES Handling
Code:
NC
Limits From: AT CALAVERAS CREEK (EB) Fund Cat: 6
Limits To: . Estimate: $1,045,403
Length: 0.3 Miles Actual: $976,495
 
Back...

Totals for 0100-02-057
Length: 0.3 Miles
Estimate: $1,045,403
Actual: $976,495

CCSJ: 0100-02-058

District: San Antonio Let Date: NOV 2007
Highway: SP 122 Let Status: Actual
Project ID: CPM 100-2-58 CSJ: 0100-02-058
Description: SEAL COAT, OVERLAY AND PAVEMENT MARKINGS Handling
Code:
 
Limits From: AT MISSION CREEK ACADEMY Fund Cat: 1
Limits To: . Estimate: $620,307
Length: 0.6 Miles Actual: $544,281
 
Back...

Totals for 0100-02-058
Length: 0.6 Miles
Estimate: $620,307
Actual: $544,281

CCSJ: 0143-01-049

District: San Antonio Let Date: APR 2008
Highway: US 87 Let Status: Actual
Project ID: BR 2008(303) CSJ: 0143-01-049
Description: REPLACE NARROW BRIDGE & APPROACHES Handling
Code:
 
Limits From: AT SALADO CREEK Fund Cat: 6
Limits To: . Estimate: $2,817,731
Length: 0.1 Miles Actual: $2,294,298
 
Back...

Totals for 0143-01-049
Length: 0.1 Miles
Estimate: $2,817,731
Actual: $2,294,298

CCSJ: 0521-04-267

District: San Antonio Let Date: JUN 2008
Highway: IH 410 Let Status: Actual
Project ID: BR 2008(675) CSJ: 0521-04-267
Description: WIDEN NARROW BRIDGE & APPROACHES Handling
Code:
 
Limits From: SB FR AT LEON CREEK Fund Cat: 6
Limits To: . Estimate: $1,197,954
Length: 0.2 Miles Actual: $1,012,240
 
District: San Antonio Let Date: JUN 2008
Highway: IH 410 Let Status: Actual
Project ID: BR 2008(675) CSJ: 0521-04-268
Description: WIDEN NARROW BRIDGE & APPROACHES Handling
Code:
 
Limits From: IH 410 NB FRONTAGE RD AT LEON CREEK Fund Cat: 6
Limits To: . Estimate: $1,219,386
Length: 0.2 Miles Actual: $1,030,370
 
Back...

Totals for 0521-04-267
Length: 0.4 Miles
Estimate: $2,417,340
Actual: $2,042,610

CCSJ: 0521-05-132

District: San Antonio Let Date: FEB 2008
Highway: IH 410 Let Status: Actual
Project ID: IM 4104(355) CSJ: 0521-05-132
Description: CONSTRUCT RAMP AND CONSTRUCT TURNAROUNDS AT MOURSUND ROAD Handling
Code:
 
Limits From: ZARZAMORA Fund Cat: 11
Limits To: 0.2 MI W OF US 281 S Estimate: $2,011,954
Length: 3.2 Miles Actual: $1,799,426
 
District: San Antonio Let Date: FEB 2008
Highway: IH 410 Let Status: Actual
Project ID: IM 4104(355) CSJ: 0521-06-129
Description: CONSTRUCT TURNAROUND @ US 281 S Handling
Code:
 
Limits From: 0.2 MI W OF US 281 S Fund Cat: 11
Limits To: US 281 S Estimate: $893,688
Length: 0.2 Miles Actual: $977,761
 
Back...

Totals for 0521-05-132
Length: 3.4 Miles
Estimate: $2,905,642
Actual: $2,777,187

CCSJ: 0915-00-123

District: San Antonio Let Date: SEP 2007
Highway: VA Let Status: Actual
Project ID: STP 2007(701) CSJ: 0915-00-123
Description: CONSTRUCT ADA CURB RAMPS Handling
Code:
 
Limits From: VARIOUS LOCATIONS IN KERR, KENDALL Fund Cat: 10
Limits To: AND COMAL COUNTIES Estimate: $1,626,256
Length: 0.0 Miles Actual: $1,424,135
 
Back...

Totals for 0915-00-123
Length: 0.0 Miles
Estimate: $1,626,256
Actual: $1,424,135

CCSJ: 0915-00-132

District: San Antonio Let Date: MAY 2008
Highway: VA Let Status: Actual
Project ID: STP 2008(772)MM CSJ: 0915-00-132
Description: FREIGHT RAIL RELOCATION STUDY - SAN ANTONIO AREA Handling
Code:
XX
Limits From: VARIOUS LOCATIONS IN BEXAR, COMAL Fund Cat: 7
Limits To: WILSON AND GUADALUPE COUNTIES Estimate: $1,000,000
Length: 0.0 Miles Actual: $1,000,000
 
Back...

Totals for 0915-00-132
Length: 0.0 Miles
Estimate: $1,000,000
Actual: $1,000,000

CCSJ: 0915-00-133

District: San Antonio Let Date: APR 2008
Highway: VA Let Status: Actual
Project ID: STP 2008(649)MM CSJ: 0915-00-133
Description: FREIGHT RAIL ADAPTIVE REUSE STUDY - SAN ANTONIO AREA Handling
Code:
XX
Limits From: VARIOUS LOCATIONS IN BEXAR, COMAL Fund Cat: 7
Limits To: WILSON AND GUADALUPE COUNTIES Estimate: $1,000,000
Length: 0.0 Miles Actual: $1,000,000
 
Back...

Totals for 0915-00-133
Length: 0.0 Miles
Estimate: $1,000,000
Actual: $1,000,000

CCSJ: 0915-00-135

District: San Antonio Let Date: JAN 2008
Highway: VA Let Status: Actual
Project ID: STP 2008(298) CSJ: 0915-00-135
Description: DISTRICTWIDE TRAFFIC CONTROL DEVICES (FY2008) / 2010 - PROJECT 1 Handling
Code:
 
Limits From: DISTRICTWIDE TRAFFIC CNTRL (FY2008) Fund Cat: 1
Limits To: . Estimate: $668,138
Length: 0.0 Miles Actual: $695,294
 
District: San Antonio Let Date: JAN 2008
Highway: CS Let Status: Actual
Project ID: STP 2008(299)HES CSJ: 0915-12-444
Description: IMPROVE SCHOOL ZONE Handling
Code:
 
Limits From: ON WEST AVE, FROM MIMOSA AVE Fund Cat: 8
Limits To: FM 1535 (NW MILITARY) Estimate: $14,545
Length: 0.3 Miles Actual: $18,048
 
Back...

Totals for 0915-00-135
Length: 0.3 Miles
Estimate: $682,683
Actual: $713,342

CCSJ: 0915-00-140

District: San Antonio Let Date: JAN 2008
Highway: VA Let Status: Actual
Project ID: STP 2008(300) CSJ: 0915-00-140
Description: DISTRICTWIDE TRAFFIC CONTROL DEVICES (FY2008) / 2010 - PROJECT 2 Handling
Code:
 
Limits From: DISTRICTWIDE TRAFFIC CNTRL (FY2008) Fund Cat: 1
Limits To: . Estimate: $712,897
Length: 0.0 Miles Actual: $731,951
 
District: San Antonio Let Date: JAN 2008
Highway: CS Let Status: Actual
Project ID: STP 2008(301)HES CSJ: 0915-15-083
Description: INSTALL TRAFFIC SIGNAL Handling
Code:
 
Limits From: SCHREINER ST @ HAYS ST Fund Cat: 8
Limits To: . Estimate: $108,066
Length: 0.1 Miles Actual: $120,662
 
District: San Antonio Let Date: JAN 2008
Highway: CR Let Status: Actual
Project ID: STP 2008(301)HES CSJ: 0915-46-035
Description: INSTALL ADVANCE SIGNS AND SIGNALS Handling
Code:
 
Limits From: LINK RD AND BARBAROSA RD Fund Cat: 8
Limits To: . Estimate: $14,050
Length: 0.1 Miles Actual: $18,158
 
Back...

Totals for 0915-00-140
Length: 0.2 Miles
Estimate: $835,013
Actual: $870,771

CCSJ: 0915-00-141

District: San Antonio Let Date: FEB 2008
Highway: VA Let Status: Actual
Project ID: HP 2008(541) CSJ: 0915-00-141
Description: COMMUNICATION LINK BTWN TXDOT TRANSPORTATION MANAGMENT CTRS Handling
Code:
XX
Limits From: DISTRICTWIDE Fund Cat: 10
Limits To: . Estimate: $1,000,000
Length: 0.0 Miles Actual: $1,030,380
 
Back...

Totals for 0915-00-141
Length: 0.0 Miles
Estimate: $1,000,000
Actual: $1,030,380

CCSJ: 0915-12-154

District: San Antonio Let Date: JUL 2008
Highway: CS Let Status: Actual
Project ID: STP 98(275)MM CSJ: 0915-12-154
Description: RECONSTRUCT & EXPAND FROM 2 TO 4 LNS W / CLTL, CURB, SIDEWALK, Handling
Code:
LC
Limits From: IN SAN ANTONIO ON CALLAGHAN RD Fund Cat: 7
Limits To: FROM W HORSESHOE BEND TO SP 421 Estimate: $5,912,795
Length: 0.8 Miles Actual: $8,321,402
 
District: San Antonio Let Date: JUL 2008
Highway: CS Let Status: Actual
Project ID: STP 98(275)MM CSJ: 0915-12-266
Description: RECONSTRUCT & EXPAND FROM 2 TO 4 LNS W / CLTL, CURB, SIDEWALK, Handling
Code:
LC
Limits From: ON CALLAGHAN RD FROM INGRAM Fund Cat: 7
Limits To: W HORSESHOE BEND Estimate: $3,029,694
Length: 0.6 Miles Actual: $3,942,364
 
Back...

Totals for 0915-12-154
Length: 1.4 Miles
Estimate: $8,942,489
Actual: $12,263,766

CCSJ: 0915-12-337

District: San Antonio Let Date: MAY 2008
Highway: CS Let Status: Actual
Project ID: STP 2000(154)MM CSJ: 0915-12-337
Description: WIDEN EXISTING FOR LEFT TURN LANES (ALL APPROCHES) Handling
Code:
LC
Limits From: STAHL RD AT JUDSON RD Fund Cat: 7
Limits To: . Estimate: $1,300,200
Length: 0.2 Miles Actual: $1,433,545
 
District: San Antonio Let Date: MAY 2008
Highway: CS Let Status: Actual
Project ID: STP 2000(159)MM CSJ: 0915-12-342
Description: WIDEN EXISTING FOR LEFT TURN LANES (ALL APPROACHES) Handling
Code:
LC
Limits From: STAHL RD AT O'CONNOR RD Fund Cat: 7
Limits To: . Estimate: $2,000,000
Length: 0.2 Miles Actual: $1,590,945
 
Back...

Totals for 0915-12-337
Length: 0.4 Miles
Estimate: $3,300,200
Actual: $3,024,490

CCSJ: 0915-12-367

District: San Antonio Let Date: JUN 2008
Highway: CS Let Status: Actual
Project ID: STP 99(799)MM CSJ: 0915-12-367
Description: RECONSTRUCT & WIDEN NARROW PAVEMENT W / CLTL (CURB, SDWK, AND Handling
Code:
LC
Limits From: ON NACOGDOCHES FROM N OF IH 410 Fund Cat: 7
Limits To: TO DANBURY Estimate: $3,008,000
Length: 0.3 Miles Actual: $4,185,471
 
Back...

Totals for 0915-12-367
Length: 0.3 Miles
Estimate: $3,008,000
Actual: $4,185,471

CCSJ: 0915-12-369

District: San Antonio Let Date: JUN 2008
Highway: CS Let Status: Actual
Project ID: STP 99(801)MM CSJ: 0915-12-369
Description: EXTEND ROADWAY ON NEW ALIGNMENT WITH CURBS, SDWLKS & DRAINAGE Handling
Code:
LC
Limits From: IN SAN ANTONIO, PRUE RD EXTENSION Fund Cat: 7
Limits To: FROM PRUE RD TO HUEBNER RD Estimate: $3,155,821
Length: 0.5 Miles Actual: $2,494,279
 
Back...

Totals for 0915-12-369
Length: 0.5 Miles
Estimate: $3,155,821
Actual: $2,494,279

CCSJ: 0915-12-372

District: San Antonio Let Date: NOV 2007
Highway: CS Let Status: Actual
Project ID: STP 99(802)MM CSJ: 0915-12-372
Description: REHAB & WIDEN NARROW PAVEMENT (CURB, SDWK, DRAINAGE, BIKE PATHS) Handling
Code:
LC
Limits From: IN SAN ANTONIO ON WOODLAWN Fund Cat: 7
Limits To: FROM BANDERA TO MAIDEN Estimate: $10,650,436
Length: 0.8 Miles Actual: $10,650,436
 
Back...

Totals for 0915-12-372
Length: 0.8 Miles
Estimate: $10,650,436
Actual: $10,650,436

CCSJ: 0915-12-399

District: San Antonio Let Date: JAN 2008
Highway: CS Let Status: Actual
Project ID: STP 2002(214)TE CSJ: 0915-12-399
Description: REHABILITATE HISTORIC STAGE COACH STOP & CONSTRUCT A VISITOR Handling
Code:
NC
Limits From: IN SELMA @ IH 35 & EVANS ROAD Fund Cat: 9
Limits To: @ THE HISTORIC SELMA STAGE COACH ST Estimate: $1,082,157
Length: 0.0 Miles Actual: $1,794,056
 
Back...

Totals for 0915-12-399
Length: 0.0 Miles
Estimate: $1,082,157
Actual: $1,794,056

CCSJ: 0915-12-436

District: San Antonio Let Date: NOV 2007
Highway: VA Let Status: Actual
Project ID: STP 2008(336)MM CSJ: 0915-12-436
Description: ALAMO AREA COMMUTE SOLUTION PGM - FY 2007 Handling
Code:
XX
Limits From: IN SAN ANTONIO/BEXAR CO AREA Fund Cat: 7
Limits To: . Estimate: $267,000
Length: 0.0 Miles Actual: $267,000
 
Back...

Totals for 0915-12-436
Length: 0.0 Miles
Estimate: $267,000
Actual: $267,000

CCSJ: 0915-12-437

District: San Antonio Let Date: AUG 2008
Highway: VA Let Status: Actual
Project ID: STP 2009(100)MM CSJ: 0915-12-437
Description: ALAMO AREA COMMUTE SOLUTION PGM - FY 2008 Handling
Code:
XX
Limits From: IN SAN ANTONIO/BEXAR CO AREA Fund Cat: 7
Limits To: . Estimate: $267,000
Length: 0.0 Miles Actual: $267,000
 
Back...

Totals for 0915-12-437
Length: 0.0 Miles
Estimate: $267,000
Actual: $267,000

CCSJ: 0915-12-445

District: San Antonio Let Date: JUN 2008
Highway: CS Let Status: Actual
Project ID: STP 2008(676)HES CSJ: 0915-12-445
Description: OVERLAY AND PAVEMENT MARKINGS Handling
Code:
 
Limits From: ON MAINLAND DRIVE, FROM MAINLAND SQ Fund Cat: 8
Limits To: MONTEGO Estimate: $213,026
Length: 0.3 Miles Actual: $212,889
 
Back...

Totals for 0915-12-445
Length: 0.3 Miles
Estimate: $213,026
Actual: $212,889

CCSJ: 0915-12-449

District: San Antonio Let Date: JUN 2008
Highway: VA Let Status: Actual
Project ID: STP 2008(896)MM CSJ: 0915-12-449
Description: PRELIMINARY ENGINEERING FOR BUS RAPID TRANSIT Handling
Code:
XX
Limits From: MEDICAL CENTER Fund Cat: 7
Limits To: DOWNTOWN- VIA FREDRICKSBURG RD Estimate: $1,000,000
Length: 0.0 Miles Actual: $1,000,000
 
Back...

Totals for 0915-12-449
Length: 0.0 Miles
Estimate: $1,000,000
Actual: $1,000,000

CCSJ: 1477-01-037

District: San Antonio Let Date: SEP 2007
Highway: FM 1516 Let Status: Actual
Project ID: STP 2008(032) CSJ: 1477-01-037
Description: INSTALLATION OF DRAINAGE STRUCTURES Handling
Code:
 
Limits From: SCHOOL STREET Fund Cat: 11
Limits To: AVENUE G Estimate: $820,726
Length: 0.2 Miles Actual: $659,457
 
Back...

Totals for 1477-01-037
Length: 0.2 Miles
Estimate: $820,726
Actual: $659,457

CCSJ: 2104-02-028

District: San Antonio Let Date: OCT 2007
Highway: FM 1957 Let Status: Actual
Project ID: STP 2008(089) CSJ: 2104-02-028
Description: ULTRATHIN BONDED WEARING COURSE & PAVEMENT MARKINGS (TO Handling
Code:
 
Limits From: LP 1604 Fund Cat: 1
Limits To: FM 3487 Estimate: $1,561,184
Length: 4.9 Miles Actual: $1,506,636
 
District: San Antonio Let Date: OCT 2007
Highway: FM 2696 Let Status: Actual
Project ID: STP 2008(089) CSJ: 2708-01-029
Description: ULTRATHIN BONDED WEARING COURSE AND PAVEMENT MARKINGS (TO Handling
Code:
 
Limits From: WEST AVE Fund Cat: 1
Limits To: IH 410 Estimate: $723,821
Length: 1.7 Miles Actual: $687,081
 
Back...

Totals for 2104-02-028
Length: 6.6 Miles
Estimate: $2,285,005
Actual: $2,193,717

CCSJ: 2440-01-020

District: San Antonio Let Date: JAN 2008
Highway: FM 2536 Let Status: Actual
Project ID: STP 2008(331)MM CSJ: 2440-01-020
Description: REPLACE BRIDGE OVER UNION PACIFIC RAILROAD Handling
Code:
 
Limits From: AT UPRR CROSSING Fund Cat: 7
Limits To: . Estimate: $13,689,795
Length: 0.6 Miles Actual: $11,525,779
 
Back...

Totals for 2440-01-020
Length: 0.6 Miles
Estimate: $13,689,795
Actual: $11,525,779

CCSJ: 2708-01-022

District: San Antonio Let Date: MAY 2008
Highway: FM 2696 Let Status: Actual
Project ID: PTF 2008(460) CSJ: 2708-01-022
Description: EXPAND ROADWAY FROM 2 TO 4 LANES WITH TURN LANE, SIDEWALKS Handling
Code:
LC
Limits From: 0.1 MI S OF GLADE CROSSING Fund Cat: 10
Limits To: 0.2 MI N OR W OAK ESTATES Estimate: $33,926,586
Length: 3.9 Miles Actual: $28,871,201
 
Back...

Totals for 2708-01-022
Length: 3.9 Miles
Estimate: $33,926,586
Actual: $28,871,201

CCSJ: 3212-06-014

District: San Antonio Let Date: JUL 2008
Highway: FM 3351 Let Status: Actual
Project ID: STP 2008(754) CSJ: 3212-06-014
Description: WIDEN RDWY TO ADD LEFT TURN LANE Handling
Code:
 
Limits From: 3.50 NI N OF IH 10 Fund Cat: 11
Limits To: 4.10 MI N OF IH 10 Estimate: $569,150
Length: 0.4 Miles Actual: $596,002
 
Back...

Totals for 3212-06-014
Length: 0.4 Miles
Estimate: $569,150
Actual: $596,002


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract