Detail Letting Schedule for Fannin County (FY 2012)

 
 
Last Update: Monday, September 24, 2012
Fannin County (FY 2012)

CCSJ: 0202-03-036

District: Paris Let Date: SEP 2011
Highway: US 69 Let Status: Actual
Project ID: STP 2012(027) CSJ: 0202-03-036
Description: HOT MIX OVERLAY Handling
Code:
 
Limits From: HUNT COUNTY LINE Fund Cat: 1
Limits To: 0.04 MILES NORTH OF SH 78 Estimate: $835,162
Length: 1.6 Miles Actual: $749,984
 
District: Paris Let Date: SEP 2011
Highway: US 69 Let Status: Actual
Project ID: STP 2012(027) CSJ: 0202-04-022
Description: HOT MIX OVERLAY Handling
Code:
 
Limits From: 0.442 MILES NORTH OF FM 1562 Fund Cat: 1
Limits To: FANNIN COUNTY LINE Estimate: $1,611,115
Length: 4.4 Miles Actual: $1,822,647
 
Back...

Totals for 0202-03-036
Length: 6.0 Miles
Estimate: $2,446,277
Actual: $2,572,631

CCSJ: 0202-03-037

District: Paris Let Date: DEC 2011
Highway: US 69 Let Status: Actual
Project ID: CRX 202-3-37 CSJ: 0202-03-037
Description: UPGRADE RR CROSSING PLANKING Handling
Code:
XX
Limits From: DALLAS GARLAND NORTHEASTERN RR Fund Cat: 10
Limits To: DOT 415 113E; RRMP 965.6 Estimate: $109,200
Length: 0.1 Miles Actual: $109,200
 
Back...

Totals for 0202-03-037
Length: 0.1 Miles
Estimate: $109,200
Actual: $109,200

CCSJ: 0279-03-034

District: Paris Let Date: MAR 2012
Highway: SH 78 Let Status: Actual
Project ID: STP 2012(425) CSJ: 0279-03-034
Description: REHABILITATION OF EXISTING ROAD Handling
Code:
 
Limits From: SH 11 Fund Cat: 1
Limits To: SH 56 Estimate: $4,165,910
Length: 10.5 Miles Actual: $3,660,235
 
Back...

Totals for 0279-03-034
Length: 10.5 Miles
Estimate: $4,165,910
Actual: $3,660,235

CCSJ: 0549-01-029

District: Paris Let Date: AUG 2012
Highway: SH 121 Let Status: Actual
Project ID: STP 2012(575) CSJ: 0549-01-029
Description: UPGRADE TO 5 LANE ROADWAY WITH SHOULDERS Handling
Code:
 
Limits From: US 82 Fund Cat: 1
Limits To: SH 56 Estimate: $5,627,852
Length: 1.9 Miles Actual: $6,855,007
 
Award Status
Bid Tabulations
Back...

Totals for 0549-01-029
Length: 1.9 Miles
Estimate: $5,627,852
Actual: $6,855,007


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract