Letting Schedule for August, 2012 (FY 2012)

 
 
Last Update: Monday, September 24, 2012
August, 2012 (FY 2012) (see Links)
SEP 2011 | OCT 2011 | NOV 2011 | DEC 2011 | JAN 2012 | FEB 2012 | MAR 2012 | APR 2012 | MAY 2012 | JUN 2012 | JUL 2012 | AUG 2012
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0548-01-039 Andrews/
Odessa
SH 115 Actual $1,860,700 3 NON - FREEWAY WIDENING
0904-06-009 Armstrong/
Amarillo
VA Actual $615,000 3 CHARLES GOODNIGHT HISTORICAL VISITOR AND EDUCATION CENTER
0187-02-064 Austin/
Yoakum
SH 36 Actual $10,689,701 3 CONSTRUCT AUXILLARY LANES
0914-18-098 Bastrop/
Austin
VA Actual $177,553 10 EROSION CONTROL DUE TO WILDFIRE
0914-18-099 Bastrop/
Austin
VA Actual $505,248 10 REMOVE / REPLACE METAL BEAM GUARDFENCE DUE WILDFIRE
0909-36-140 Bell/
Waco
CS Actual $200,583 8 INSTALL RAILROAD SIGNAL
0017-10-265 Bexar/
San Antonio
IH 35 Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0017-10-266 Bexar/
San Antonio
IH 35 Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0017-11-038 Bexar/
San Antonio
SP 536 Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0465-01-057 Bexar/
San Antonio
SH 218 Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0521-05-122 Bexar/
San Antonio
IH 410 Actual $1,468,825 3 RELOCATING ENTRANCE & EXIT RAMPS BETWEEN RR OVERPASSES
0915-12-438 Bexar/
San Antonio
VA Actual $4,074,498 3 PHASE 4 & 5 ENHANCE RDWYS, TRAILS, MRKRS THAT LEAD TO MISSIONS
0915-12-486 Bexar/
San Antonio
CS Actual $1,139,444 3 CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS, IMPROVE PED BRIDGE
0915-12-490 Bexar/
San Antonio
VA Actual $4,300,000 7 COSTS ASSOCIATED WITH BUS PURCHASES, ROW, CONSTRUCTION,
0915-12-491 Bexar/
San Antonio
VA Actual $267,000 7 ALAMO AREA COMMUTE SOLUTION PGM - FY 2012
0915-12-495 Bexar/
San Antonio
VA Actual $1,500,000 3 FURNISH & INSTALL EQUIPMENT TO EXPAND TRAFFIC SIGNAL
0915-12-500 Bexar/
San Antonio
CS Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0915-12-501 Bexar/
San Antonio
CS Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0915-12-502 Bexar/
San Antonio
CS Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0915-12-503 Bexar/
San Antonio
CS Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0915-12-504 Bexar/
San Antonio
CS Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0915-12-505 Bexar/
San Antonio
CS Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0915-12-506 Bexar/
San Antonio
CS Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0915-12-507 Bexar/
San Antonio
CS Actual $150,000 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0915-12-508 Bexar/
San Antonio
CS Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0919-19-074 Bowie/
Atlanta
VA Actual $109,620 10 LANDSCAPE AND SCENIC ENHANCEMENT
0919-19-075 Bowie/
Atlanta
CR Actual $212,667 8 INSTALL AUTOMATIC RR WARNING DEVICES
1231-01-061 Bowie/
Atlanta
FM 989 Actual $212,667 8 INSTALL AUTOMATIC RR WARNING DEVICES
0912-31-275 Brazoria/
Houston
CR Actual $15,980,617 3 RECONST 2 - LN RDWY FROM SH 288 TO E OF BS 288, CONST 2 - LN
0117-02-028 Brazos/
Bryan
SH 21 Actual $13,287,732 3 WIDEN NON - FREEWAY FACILITY CONSISTING OF GRADING, STRUCTURES
2399-01-064 Brazos/
Bryan
FM 2818 Actual $731,813 1 OVERLAY CONSISTING OF SMA ASPHALT PAVEMENT AND PAVEMENT
0255-05-034 Brooks/
Pharr
US 281 Actual $13,828,828 3 CONSTRUCT OVERPASS
0923-06-064 Brown/
Brownwood
CR Actual $212,667 8 RAILROAD SIGNALIZATION
1438-01-023 Calhoun/
Yoakum
FM 1289 Actual $1,648,606 8 SET FIXED OBJECTS & CONSTRUCT SHOULDERS
0327-08-083 Cameron/
Pharr
US 77 Actual $4,952,957 3 UPGRADE RAMPS & CONVERT FRONTAGE ROADS TO 1 - WAY
3622-01-003 Cameron/
Pharr
SH 550 Actual $36,055,194 3 CONSTRUCT TOLLED DIRECT CONNECTORS & MAIN LANES
0919-00-074 Cass/
Atlanta
VA Actual $745,272 10 TREE REMOVAL DUE TO WILDFIRE ON IH 20 IN HARRISON CO & SH 49
0047-14-068 Collin/
Dallas
US 75 Actual $63,579,302 3 RECONSTRUCT AND WIDEN 4 LANE TO 6 LANES AND 2 LANE FRONTAGE
0230-01-018 Collingsworth/
Childress
SH 203 Actual $2,895,508 3 REHABILITATION EXISTING TRUSS BRIDGE
0016-10-022 Comal/
San Antonio
BS 46-C Actual $9,677,387 3 REPLACE RR UNDERPASS & WIDEN TO 4 LANE UNDIVIDED URBAN
0915-17-061 Comal/
San Antonio
CS Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
1728-02-037 Comal/
San Antonio
FM 306 Actual $23,138,866 1 EXPAND 2 TO 4 LANE DIVIDED
3107-01-038 Comal/
San Antonio
FM 3009 Actual $1,832,065 3 RECONFIGURE INTERSECTION
0146-08-052 Cottle/
Childress
FM 1037 Actual $750,135 3 WIDENING OF NON - FREEWAY FACILITY
0442-02-151 Dallas/
Dallas
IH 35E Actual $689,824 1 FULL DEPTH REPAIR OF FRONTAGE ROADS AND RAMPS
0918-00-184 Dallas/
Dallas
VA Actual $181,228 1 UPGRADE VIDEO DETECTION FOR HIGH SPEED APPROACHES
0918-00-199 Dallas/
Dallas
VA Actual $187,500 12 NCTCOG REGIONAL ITS DATA ARCHIVING (FY 2012)
0918-45-889 Dallas/
Dallas
VA Actual $2,500,000 3 TRE OVERHAUL OF FLEET
0918-45-890 Dallas/
Dallas
VA Actual $4,178,125 3 PHASE 2 - CONSTRUCTION OF RAIL STATION ON DART BLUELINE IN
0918-47-049 Dallas/
Dallas
CS Actual $5,737,500 3 NORTHWEST CORRIDOR LIGHT RAIL BED, TRACK, OVERHEADS AND
0918-47-050 Dallas/
Dallas
VA Actual $6,700,000 3 NORTHWEST CORRIDOR SEGMENT FROM BACHMAN STATION IN DALLAS
0918-47-063 Dallas/
Dallas
VA Actual $17,015,000 12 LIGHT RAIL BED, TRACK, VEHICLES, OVERHEADS AND FACILITIES
0918-47-066 Dallas/
Dallas
CS Actual $175,133 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-47-067 Dallas/
Dallas
CS Actual $78,708 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-47-068 Dallas/
Dallas
CS Actual $186,977 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-46-260 Denton/
Dallas
CS Actual $4,196,789 3 ON STONEBROOK, LEBANON, AND LONE STAR PKWYS; CONSTRUCT
0918-46-264 Denton/
Dallas
CS Actual $230,400 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-46-265 Denton/
Dallas
CS Actual $228,708 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-46-266 Denton/
Dallas
CS Actual $314,759 8 INSTALL RAILROAD SIGNALS AND GATES
1311-01-052 Denton/
Dallas
FM 1171 Actual $363,989 1 REPAIR EDGES AND FULL DEPTH BASE FAILURES
1568-02-007 Denton/
Dallas
FM 407 Actual $1,303,238 6 REPLACE BRIDGE AND APPROACHES
2681-01-020 Denton/
Dallas
FM 2499 Actual $979,910 3 LANDSCAPE DEVELOPMENT
0037-06-084 Dimmit/
Laredo
US 83 Actual $14,803,450 3 WIDENING ROADWAY TO PROVIDE PASSING LANES (SUPER 2)
2170-05-014 Duval/
Laredo
FM 2295 Actual $299,500 8 FEDERAL SIGNAL PROGRAM PROJECT
0167-01-109 El Paso/
El Paso
US 54 Actual $677,584 12 SIGNING / PAVEMENT MARKINGS
0608-01-001 El Paso/
El Paso
SP 276 Actual $12,972,137 ROW BUILD SPUR BETWEEN IH 10 AND SH 20
2121-01-085 El Paso/
El Paso
IH 10 Actual $1,213,345 3 CONSTRUCT AT GRADE RAMPS, NB FRONTAGE ROAD IMPROVEMENTS, SAF
0048-03-085 Ellis/
Dallas
US 77 Actual $212,667 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0048-08-046 Ellis/
Dallas
IH 35E Actual $74,459 1 INSTALL GUIDE SIGNS
0568-01-047 Ellis/
Dallas
SH 34 Actual $71,929 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-22-147 Ellis/
Dallas
CS Actual $384,536 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-22-148 Ellis/
Dallas
CS Actual $170,000 8 CLOSE BRITTON RD AT UNION PACIFIC RAILROAD
0918-22-149 Ellis/
Dallas
CS Actual $170,000 8 CLOSE CROSSING
0079-08-001 Erath/
Fort Worth
SH 267 Actual $8,735,148 11 RECONSTRUCT US 67 ON ALTERNATE ROUTE NORTH AND WEST OF
0909-38-067 Falls/
Waco
CR Actual $315,416 8 INSTALL RAILROAD SIGNAL
0909-38-068 Falls/
Waco
CR Actual $251,089 8 INSTALL RAILROAD SIGNAL
0909-38-069 Falls/
Waco
CR Actual $172,057 8 INSTALL RAILROAD SIGNAL
0909-38-070 Falls/
Waco
CR Actual $254,708 8 INSTALL RAILROAD SIGNAL
0549-01-029 Fannin/
Paris
SH 121 Actual $6,855,007 1 UPGRADE TO 5 LANE ROADWAY WITH SHOULDERS
3510-04-044 Fort Bend/
Houston
SH 99 Actual $32,980,095 3 CONSTRUCT OVERPASS AND APPROACHES
3510-04-050 Fort Bend/
Houston
SH 99 Actual $19,104,708 3 CONSTRUCT OVERPASS AND APPROACHES
0459-01-040 Freestone/
Bryan
FM 488 Actual $2,246,128 6 REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING,
1327-02-016 Freestone/
Bryan
FM 1451 Actual $513,444 6 GRADING, STRS, BASE AND SURFACING
0045-19-047 Grayson/
Paris
US 82 Actual $26,059,262 3 WIDEN FROM 2 - LANE TO 4 - LANE DIVIDED
0901-19-175 Grayson/
Paris
CS Actual $4,500 8 INSTALL STOP SIGNS AND STOP LINE AT RAILROAD CROSSINGS
0917-17-068 Grimes/
Bryan
CR Actual $309,965 8 INSTALL RAILROAD SIGNALS UNDER THE 2012 FEDERAL RAILROAD
0016-06-046 Guadalupe/
San Antonio
IH 35 Actual $21,590,719 3 EXPAND FROM 6 TO 8 LANE EXPRESSWAY
0366-03-062 Guadalupe/
San Antonio
SH 123 Actual $8,905,183 3 WIDEN ROADWAY TO PROVIDE PASSING LANES
1542-01-017 Guadalupe/
San Antonio
FM 1518 Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
3107-02-032 Guadalupe/
San Antonio
FM 3009 Actual $212,667 8 STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS
0028-01-094 Harris/
Houston
BU 90-U Actual $2,039,775 6 REPLACE BRIDGE AND APPROACHES (NBI# 12102002801007)
0389-13-058 Harris/
Houston
SH 146 Actual $100,000 10 LANDSCAPE DEVELOPMENT (PURCHASE OF MATERIALS ONLY) (NON - LET)
0502-01-208 Harris/
Houston
SH 225 Actual $2,342,263 1 FULL DEPTH REPAIR, MILLING, CURB REPAIR & ACP OVERLAY
0598-01-094 Harris/
Houston
SH 288 Actual $953,843 3 CONSTRUCT TWO LANE DIRECT CONNECTOR FROM IH 610 EB TO SH 288
0912-00-337 Harris/
Houston
VA Actual $90,000 1 SIGNAL SYSTEM ITS (NON - LETTING)
0912-00-459 Harris/
Houston
VA Actual $437,500 5 CLEAN AIR ACTION PROGRAM STAFF MARKETING AND OUTREACH
0912-70-095 Harris/
Houston
VA Actual $1,000,000 7 MOTORIST ASSISTANCE PROGRAM OPERATING EXPENSES
0912-71-002 Harris/
Houston
CR Actual $13,744,578 3 INSTALL 3, 900 FEET TRACK & RAIL CROSSING THRU W BELT JCT &
0912-71-631 Harris/
Houston
VA Actual $5,688,316 3 CONSTRUCT HIKE & BIKE TRAIL - KEEGANS BAYOU TRAIL
0912-72-295 Harris/
Houston
CR Actual $212,667 8 FY 2012 RR SIGNAL & WARNING DEVICES (UPRR DOT# 743 638B)
1006-01-068 Harris/
Houston
FM 529 Actual $1,457,279 3 IMPLEMENTATION OF ACCESS MANAGEMENT
1685-03-089 Harris/
Houston
FM 1960 Actual $962,619 8 IMPROVE TRAFFIC SIGNAL AND REALIGNING EB AND WB LEFT TURN
1812-01-019 Harris/
Houston
FM 1942 Actual $506,733 1 INSTALL LEFT TURN LANE ON FM 1942 EB TO BOHEMIAN RD NB
3256-01-097 Harris/
Houston
BW 8 Actual $1,075,234 1 DIAMOND GRINDING & FULL DEPTH CONCRETE REPAIR
3256-02-040 Harris/
Houston
BW 8 Actual $8,671,034 3 WIDEN EXISTING TO 6 MAIN LANES
0919-03-052 Harrison/
Atlanta
CR Actual $258,986 8 INSTALL AUTOMATIC RR WARNING DEVICES
0425-01-019 Hartley/
Amarillo
US 87 Actual $21,250,815 3 REHAB EXISTING RDWY & PASSING LANES
0366-01-070 Hays/
Austin
LP 82 Actual $1,130,055 6 REPLACE BRIDGE CLASS CULVERT
0914-33-053 Hays/
Austin
CS Actual $224,900 3 CONST BIKE / PEDESTRIAN FACILITY
1539-01-005 Hays/
Austin
FM 1626 Actual $17,235,782 3 RECONSTRUCT TO 4 - LANES W / CONT LTL
3545-02-003 Hays/
Austin
FM 110 Actual $6,493,407 3 CONST 5LN SUBURB SECT & 4LN DIV RDWY
0108-05-014 Henderson/
Tyler
SH 19 Actual $6,385,018 3 WIDEN 2 LN ROADWAY TO SUPER - 2 (3 LANE) _CRITERIA
0255-07-128 Hidalgo/
Pharr
US 281 Actual $19,817,171 3 RECONSTRUCT MAINLANES & ADD FRONTAGE RDS
0921-02-204 Hidalgo/
Pharr
CS Actual $957,021 3 IMPROVEMENTS @ HIDALGO INTERNATIONAL BRIDGE
0921-02-283 Hidalgo/
Pharr
VA Actual $1,120,000 3 BICENTENNIAL HIKE & BIKE TRAIL CORRIDOR BEAUTIFICATION
1804-02-023 Hidalgo/
Pharr
FM 1926 Actual $188,300 3 CONST RIGHT TURN LANES (NB & WB)
0901-28-084 Hopkins/
Paris
CR Actual $179,000 8 INSTALL RAILROAD LIGHTS AND GATES
0908-12-021 Howard/
Abilene
CS Actual $212,667 8 UPGRADE / INSTALL RR XING PROTECTION
1134-01-015 Howard/
Abilene
FM 818 Actual $248,648 8 INSTALL / UPGRADE RR XING PROTECTION
0642-03-019 Hunt/
Paris
FM 36 Actual $1,731,836 1 REHAB EXIST ROAD
0920-38-248 Jefferson/
Beaumont
CS Actual $200,000 8 RAILROAD SIGNAL UPGRADE
0920-38-249 Jefferson/
Beaumont
CS Actual $265,000 8 RAILROAD SIGNAL UPGRADE
2367-01-055 Jefferson/
Beaumont
SH 82 Actual $4,771,981 6 CONSTRUCT BRIDGE DOLPHINS
0921-24-008 Jim Hogg/
Pharr
CS Actual $212,667 8 UPGRADE RRX WARNING DEVICES
0921-24-009 Jim Hogg/
Pharr
CS Actual $212,667 8 UPGRADE RRX WARNING DEVICES
0014-04-077 Johnson/
Fort Worth
IH 35W Actual $4,319,955 1 SALVAGE, HAUL AND STOCKPILE RECLAIMED PAVEMENT; HMAC INLAY
0019-01-137 Johnson/
Fort Worth
SH 174 Actual $4,068,872 3 PLANE ASPHALT AND INLAY 2" HMAC ADD CENTER MEDIAN
0902-50-109 Johnson/
Fort Worth
CR Actual $165,657 8 2011 - 2012 FEDERAL RAILROAD SIGNAL PROGRAM
0902-50-110 Johnson/
Fort Worth
CR Actual $212,667 8 2011 - 2012 FEDERAL RAILROAD SIGNAL PROGRAM
2734-01-014 Johnson/
Fort Worth
FM 2135 Actual $2,926,692 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0173-04-052 Kaufman/
Dallas
SH 34 Actual $212,667 8 INSTALL SIGNAL PREEMPTION
0751-01-047 Kaufman/
Dallas
FM 148 Actual $212,667 8 INSTALL SIGNAL PREEMPTION
0193-02-031 Kerr/
San Antonio
SH 39 Actual $7,644,986 3 UPGRADE TO 2 LANE WITH CONTINUOUS LEFT TURN LANE
0098-05-026 Knox/
Childress
SH 6 Actual $4,296,515 3 REPLACE BRIDGE AND APPROACHES
0483-01-040 La Salle/
Laredo
SH 97 Actual $4,063,510 1 OVERLAY
0136-07-048 Lamar/
Paris
US 271 Actual $3,275,793 1 REHABILITATION OF EXISTING ROAD
0909-40-066 Limestone/
Waco
CR Actual $192,766 8 INSTALL RAILROAD SIGNAL
2373-04-013 Live Oak/
Corpus Christi
FM 624 Actual $4,199,613 1 REHAB ROADWAY
0421-08-032 Medina/
San Antonio
SH 173 Actual $1,919,480 1 REHAB & WIDEN NARROW PAVEMENT TO ADD SHOULDERS & CONTINUOUS
0590-05-027 Milam/
Bryan
FM 486 Actual $1,943,618 6 REPLACE STRUCTURE
0908-21-020 Mitchell/
Abilene
CR Actual $213,087 6 REPLACE BRIDGE AND APPROACHES
0908-21-022 Mitchell/
Abilene
CR Actual $212,667 8 UPGRADE / INSTALL RR XING PROTECTION
2471-01-009 Mitchell/
Abilene
FM 670 Actual $782,135 6 REPLACE BRIDGE
0903-28-061 Montague/
Wichita Falls
CR Actual $1,321 8 GRADE CROSSING PROTECTION
0912-37-199 Montgomery/
Houston
CS Actual $2,836,771 3 WIDEN TO 6 LANE DIVIDED
0912-37-225 Montgomery/
Houston
CS Actual $212,667 8 FY 2012 RR SIGNAL & WARNING DEVICES (UPRR DOT# 430 088L)
3050-02-021 Montgomery/
Houston
FM 2978 Actual $1,065,381 1 WIDEN FROM 2 TO 4 LANES
0277-01-028 Morris/
Atlanta
SH 77 Actual $2,668,955 3 WIDEN TO ADD SHOULDERS TO EXISTING 2 - LANE RURAL HIGHWAY
0704-05-020 Motley/
Childress
FM 94 Actual $3,796,505 3 WIDENING OF NON - FREEWAY FACILITY
0553-03-022 Nacogdoches/
Lufkin
SH 7 Actual $5,437,705 3 REHABILITATE EXISTING ROADWAY AND ADD PAVED SHOULDERS /
0918-18-127 Navarro/
Dallas
CR Actual $185,822 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-18-128 Navarro/
Dallas
CS Actual $355,776 8 INSTALL RAILROAD SIGNALS AND GATES
1451-03-013 Navarro/
Dallas
FM 55 Actual $2,796,268 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1601-02-023 Parker/
Fort Worth
FM 1884 Actual $6,349,600 1 WIDEN EXISTING ROADWAY; ADD SHOULDERS
0554-01-031 Real/
San Angelo
RM 336 Actual $3,573,173 8 WIDEN ROADWAY
0189-01-007 Red River/
Paris
SH 37 Actual $14,580,057 3 REPLACE BRIDGE
0917-18-024 Robertson/
Bryan
CR Actual $1,922,884 6 REHABILITATE EXISTING BRIDGE FACILITY CONSISTING OF
0917-18-076 Robertson/
Bryan
CS Actual $192,172 8 INSTALL RAILROAD SIGNALS UNDER THE 2012 FEDERAL RAILROAD
0451-01-047 Rockwall/
Dallas
SH 205 Actual $1,969,765 6 REPLACE BRIDGE AND APPROACHES
1014-03-050 Rockwall/
Dallas
FM 550 Actual $2,519,946 6 REPLACE BRIDGE AND APPROACHES
0378-01-029 Rusk/
Tyler
SH 135 Actual $212,667 8 UPGRADE R / R WARNING & / OR PROTECTION DEVICES
3340-01-005 San Patricio/
Corpus Christi
FM 3239 Actual $4,770,791 3 CONSTRUCT 2 ADDITIONAL LANES WITH CONTINUOUS LEFT TURN LANE
0175-02-083 Shelby/
Lufkin
US 84 Actual $5,325,125 1 RECONSTRUCT EXISTING PAVEMENT
0911-39-041 Shelby/
Lufkin
CR Actual $275,414 8 UPGRADE RAILROAD CROSSING WARNING DEVICES
2893-01-017 Shelby/
Lufkin
FM 947 Actual $250,710 8 UPGRADE RAILROAD CROSSING WARNING DEVICES
0190-05-063 Smith/
Tyler
US 69 Actual $107,744 10 LANDSCAPE DIVIDED MEDIAN & SHOULDERS N OF IH 20
0013-10-080 Tarrant/
Fort Worth
BU 287P Actual $575,000 8 2011 - 2012 FEDERAL RAILROAD SIGNAL PROGRAM
0902-00-130 Tarrant/
Fort Worth
VA Actual $1,048,475 1 FULL DEPTH CONCRETE PAVEMENT REPAIR ON VARIOUS ROADWAYS
0902-48-779 Tarrant/
Fort Worth
CS Actual $456,201 8 2009 SRTS INFRASTRUCTURE PROJECT;CONSTRUCT SIDEWALKS, ADA
0902-48-796 Tarrant/
Fort Worth
VA Actual $1,816,666 12 PROVIDE MPO PLAN. SUPPORT & TECH ASST FOR SURF TRANS PROJ
0902-48-839 Tarrant/
Fort Worth
CS Actual $212,667 8 2011 - 2012 FEDERAL RAILROAD SIGNAL PROGRAM
0902-48-840 Tarrant/
Fort Worth
CS Actual $143,882 8 2011 - 2012 FEDERAL RAILROAD SIGNAL PROGRAM
0158-02-062 Tom Green/
San Angelo
US 67 Actual $5,288,891 6 REPLACE BRIDGES
0914-00-351 Travis/
Austin
VA Actual $200,000 7 PROCURE 10 PARATRANSIT BUSES FOR CARTS ON - DEMAND COUNTRY BUS
0914-00-353 Travis/
Austin
VA Actual $900,000 7 PROCUREMENT OF FOUR (4) INTERURBAN BUSES FOR USE IN THE FIVE
0914-00-355 Travis/
Austin
IH 35 Actual $4,100,000 7 TSU BUS CAPITAL IH 35 BUS CORRIDOR SERVICE
0914-04-272 Travis/
Austin
VA Actual $5,400,000 7 DOUBLE TRACK CAPITAL METRO METRORAIL LINE AT PLAZA SALTILLO
0914-04-276 Travis/
Austin
VA Actual $5,000,000 7 NEPA, ALTERNATIVE ANALYSIS & PRELIM ENGINEERING FOR CITY OF
1200-03-053 Travis/
Austin
FM 973 Actual $565,900 3 ADD CENTER TURN LANE AND RIGHT TURN LANES
3136-01-171 Travis/
Austin
LP 1 Actual $249,790 3 WIDEN NORTHBOUND FRONTAGE ROAD & INSTALL AUXILIARY LANES
0595-01-008 Uvalde/
San Antonio
FM 1796 Actual $1,993,667 1 REHAB AND WIDEN NARROW ROADWAY
1168-02-015 Uvalde/
San Antonio
FM 1049 Actual $2,094,081 1 REHAB AND WIDEN NARROW ROADWAY TO ADD SHOULDERS
1590-01-021 Uvalde/
San Antonio
FM 481 Actual $2,663,513 6 REPLACE BRIDGE
0245-19-022 Van Zandt/
Tyler
SH 64 Actual $7,358,630 1 WIDEN 2 LN ROADWAY TO SUPER - 2 (3LANE) CRITERIA
0523-02-043 Waller/
Houston
FM 362 Actual $763,185 1 INSTALL LEFT TURN LANES
0086-16-004 Webb/
Laredo
SL 20 Actual $11,417,278 3 FOR THE WIDENING OF A SECT OF LOOP 20 FROM 2 TO 4 LANE
0903-03-104 Wichita/
Wichita Falls
CR Actual $3,207 8 RAILROAD CROSSING CLOSURE
0903-03-105 Wichita/
Wichita Falls
CR Actual $35,000 8 REPLACE RAILROAD CROSSING ADVANCE WARNING SIGNS
3317-01-005 Wilbarger/
Wichita Falls
FM 3207 Actual $2,961,201 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0015-08-137 Williamson/
Austin
IH 35 Actual $418,380 10 LANDSCAPING AND IRRIGATION
0683-06-028 Williamson/
Austin
SH 45 Actual $2,188,831 3 INSTALL ELECTRONIC TOLL COLLECTION FACILITIES AT RAMPS
0914-05-149 Williamson/
Austin
CR Actual $5,412,628 3 CONST CR 273 / 274 T , A FACILITY CRITICAL TO PULLING
0914-05-176 Williamson/
Austin
CS Actual $760,000 3 CONSTRUCT PEDESTRIAN STREETSCAPE SUPPORTING INTERMODAL TRANS
0401-02-031 Wood/
Tyler
SH 154 Actual $2,484,894 6 REPLACE BRIDGE & APPROACHES


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract