Detail Letting Schedule for Real County (FY 2012)
Detail Letting Schedule for Real County (FY 2012) | ||||
Last Update: Monday, September 24, 2012 |
Real County (FY 2012) |
CCSJ: 0554-01-031 | |||
District: | San Angelo | Let Date: | AUG 2012 |
Highway: | RM 336 | Let Status: | Actual |
Project ID: | STP 2012(456)HRR | CSJ: | 0554-01-031 |
Description: | WIDEN ROADWAY | Handling Code: |
|
Limits From: | 9.502 MILES SOUTH OF SH 41 | Fund Cat: | 8 |
Limits To: | 17.106 MILES SOUTH OF SH 41 | Estimate: | $782,897 |
Length: | 7.6 Miles | Actual: | $856,719 |
District: | San Angelo | Let Date: | AUG 2012 |
Highway: | RM 337 | Let Status: | Actual |
Project ID: | STP 2012(457)HES | CSJ: | 0792-01-029 |
Description: | WIDEN ROADWAY | Handling Code: |
|
Limits From: | 8.002 MILES EAST OF SH 55 | Fund Cat: | 8 |
Limits To: | 21.032 MILES EAST OF SH 55 | Estimate: | $1,908,322 |
Length: | 13.0 Miles | Actual: | $2,105,642 |
District: | San Angelo | Let Date: | AUG 2012 |
Highway: | RM 335 | Let Status: | Actual |
Project ID: | STP 2012(456)HRR | CSJ: | 0830-01-017 |
Description: | WIDEN ROADWAY | Handling Code: |
|
Limits From: | SH 41 | Fund Cat: | 8 |
Limits To: | 4.552 MILES SOUTH OF SH 41 | Estimate: | $567,925 |
Length: | 4.0 Miles | Actual: | $610,812 |
Award Status Bid Tabulations Back... |
Totals for 0554-01-031 | ||
---|---|---|---|
Length: | 24.6 Miles | ||
Estimate: | $3,259,144 | ||
Actual: | $3,573,173 |
|
|