Detail Letting Schedule for Randall County (FY 2014)

Last Update: Monday, November 17, 2014
Randall County (FY 2014)

CCSJ: 0168-09-163

District: Amarillo Let Date: JUN 2014
Highway: US 60 Let Status: Actual
Project ID: BR 2014(936) CSJ: 0168-09-163
Description: REPLACE BRIDGE Handling
Code:
 
Limits From: AT CR 214 (BUFFALO STD) Fund Cat: 6
Limits To: . Estimate: $2,085,551
Length: 0.1 Miles Actual: $2,174,375
 
Back...

Totals for 0168-09-163
Length: 0.1 Miles
Estimate: $2,085,551
Actual: $2,174,375

CCSJ: 0534-01-019

District: Amarillo Let Date: SEP 2013
Highway: PR 5 Let Status: Actual
Project ID: C 534-1-19 CSJ: 0534-01-019
Description: REPLACE CONCRETE WATER CROSSINGS Handling
Code:
 
Limits From: AT WATER CROSS 1,2,6 AND BURNT DRAW Fund Cat: 10
Limits To: IN PALO DURO CANYON STATE PARK Estimate: $2,762,651
Length: 0.6 Miles Actual: $3,956,849
 
Back...

Totals for 0534-01-019
Length: 0.6 Miles
Estimate: $2,762,651
Actual: $3,956,849

CCSJ: 0904-11-054

District: Amarillo Let Date: MAY 2014
Highway: CS Let Status: Actual
Project ID: STP 2014(606) CSJ: 0904-11-054
Description: REHAB EXISTING ROADWAY Handling
Code:
 
Limits From: ON 58TH AVE, FROM GEORGIA ST Fund Cat: 3
Limits To: WASHINGTON ST Estimate: $1,902,158
Length: 1.0 Miles Actual: $1,999,859
 
Back...

Totals for 0904-11-054
Length: 1.0 Miles
Estimate: $1,902,158
Actual: $1,999,859

CCSJ: 2635-02-022

District: Amarillo Let Date: DEC 2013
Highway: LP 335 Let Status: Actual
Project ID: DMO 2012(189) CSJ: 2635-02-022
Description: ADDITIONAL 2 LANES AND BRIDGES Handling
Code:
 
Limits From: IH 27, E Fund Cat: 3
Limits To: BNSF RR Estimate: $32,034,137
Length: 3.0 Miles Actual: $32,232,647
 
Back...

Totals for 2635-02-022
Length: 3.0 Miles
Estimate: $32,034,137
Actual: $32,232,647


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract