Letting Schedule for Paris District (FY 2018)

Last Update: Monday, August 27, 2018
Paris District (FY 2018)
Fannin | Franklin | Grayson | Hopkins | Hunt | Lamar | Rains | Red River |

Fannin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0174-04-035FM 79ActualAug 2018$1,464,1598RAISED EDGELINE RUMBLE STRIPS, RAISED CENTERLINE RUMBLE0.0
0045-20-018US 82ActualJul 2018$73,802,4111ADD TWO LANES WITH SHOULDERS5.0
1708-01-013FM 1752ActualDec 2017$5,448,1661REHABILITATION OF EXISTING ROAD2.0
1980-01-008FM 1629ActualDec 2017$1,652,48711PROVIDE ADDITIONAL PAVED SURFACE WIDTH3.0
0765-02-021FM 1753ActualAug 2018$11,028,9531REHABILITATION OF EXISTING ROAD0.0

Franklin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0633-01-021FM 21ActualSep 2017$1,689,5348PROVIDE ADDITIONAL PAVED SURFACE WIDTH0.0

Grayson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0045-02-034SH 56ActualApr 2018$124,48010LANDSCAPE DEVELOPMENT0.0
0666-01-027FM 691ActualAug 2018$8,299,2551RECONST ROADWAY AND ADD 2 LANES5.5
0047-02-138US 75ActualJan 2018$7,148,8061MILL AND INLAY0.0
0047-01-069US 75ActualDec 2017$1,366,98011FULL DEPTH REPAIR REINFORCE CONCRETE PAVEMENT, SLAB JACKING0.0
0045-19-053US 82ActualAug 2018$3,011,2858SAFETY TREAT FIXED OBJECTS6.5
0045-03-050SH 56ApprovedAug 2018$30,0153SH 56 AND RUSK STREET PEDESTRIAN CURB RAMP IMPROVEMENT0.0
0901-19-181CRActualJun 2018$1,224,7656BRIDGE REPLACEMENT0.0
0202-08-063SH 289ActualMar 2018$260,2802UREPLACE CULVERTS AND IMPROVE DRAINAGE0.0
0045-04-066SH 56ActualMay 2018$498,4503CONSTRUCT SHARED USE PATH AND STREETSCAPE0.0

Hopkins County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0083-03-055SH 154ActualAug 2018$5,647,8931MILL AND INLAY0.0
0901-28-090VAActualDec 2017$774,8833CONSTRUCT SIDEWALK AND SHARED USE PATH0.0
0009-18-020BU 67-VActualDec 2017$11,054,3441SEAL COAT0.0
0901-28-085CRActualJul 2018$275,9816BRIDGE REPLACEMENT0.0

Hunt County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0173-06-042SH 34ActualAug 2018$1,442,3007WIDEN 2 LANE RURAL TO 5 LANE UNDIVIDED ARTERIAL0.0
0083-01-054BS 11HActualFeb 2018$1,102,1753CONSTRUCT SIDEWALKS AND RAMPS, ADA COMPLIANT, MPO-TAP 20140.0
0173-06-048SH 34ActualJan 2018$74,60210LANDSCAPE AND SCENIC ENHANCEMENT0.0
1493-01-017FM 1569ActualNov 2017$3,744,3731REHABILITATION OF EXISTING ROAD5.5
0173-06-043SH 34ActualApr 2018$1,965,1778SAFETY TREAT FIXED OBJECTS5.5
0009-15-027US 69ActualDec 2017$3,132,94511FULL DEPTH CONCRETE REPAIR, PLANE, REHAB. SHLDRS3.0

Lamar County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0435-01-078FM 137ActualAug 2018$700,0006PREVENTATIVE MAINTENANCE0.0
0045-08-038US 82ActualJul 2018$179,9718INSTALL INTERSECTION FLASHING BEACON0.0
2657-01-031FM 2648ActualJul 2018$4,765,4291REHABILITATION OF EXISTING ROAD0.0
0769-01-028FM 197ActualFeb 2018$2,820,9781REHABILITATION OF EXISTING ROAD3.0
0221-01-074US 271ActualOct 2017$9,677,9771CONSTRUCT SUPER 23.0
0435-01-073FM 38ActualFeb 2018$2,307,1541REHABILITATION OF EXISTING ROAD2.0
0901-29-087VAActualSep 2017$642,9643CONSTRUCT SHARED USE PATH0.0
0901-00-054VAActualFeb 2018$2,490,64610CONSTRUCT CURB RAMPS, SH 11, SH 78, SH 121, SL 205,5.0
0901-29-082CRActualAug 2018$915,6496BRIDGE REPLACEMENT4.0

Rains County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0203-12-007FM 2795ActualMar 2018$1,144,4453CONSTRUCT SIDEWALK0.0

Red River County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0427-02-009FM 1158ActualNov 2017$2,730,7511REHABILITATION OF EXISTING ROAD2.5
0189-01-011SH 37ActualJun 2018$3,329,2448SAFETY TREAT FIXED OBJECTS, TEXTURIZE SHOULDERS6.5
0221-02-026US 271ActualMar 2018$970,0808SAFETY TREAT FIXED OBJECTS5.0
0901-27-048VAActualDec 2017$536,6293CONSTRUCT SHARED USE PATH0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract