Detail Letting Schedule for San Jacinto County (FY 2018)
San Jacinto County (FY 2018) |
CCSJ: 0395-02-038 |
|||
District: | LUFKIN | Let Date: | Apr 2018 |
Highway: | SH 150 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0395-02-038 |
Description: | IMPROVE GUARDRAIL TO DESIGN STANDARDS | Handling Code: | |
Limits From: | WALKER COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 156 | ESTIMATE: | $620,898 |
Length: | 15.1 | Actual | $0 |
Back... | Totals for 0395-02-038 | ||
---|---|---|---|
Length: | 15.1 | ||
Estimate: | $620,898 | ||
Actual: | |||
CCSJ: 0403-02-019 |
|||
District: | LUFKIN | Let Date: | Apr 2018 |
Highway: | FM 224 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0403-02-019 |
Description: | IMPROVE GUARDRAIL TO DESIGN STANDARDS | Handling Code: | |
Limits From: | SH 156 (N) | Fund Cat: | 8 |
Limits To: | SH 156 (S) | ESTIMATE: | $572,692 |
Length: | 7.7 | Actual | $0 |
District: | LUFKIN | Let Date: | Apr 2018 |
Highway: | FM 945 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 2594-01-014 |
Description: | IMPROVE GUARDRAIL TO DESIGN STANDARDS | Handling Code: | |
Limits From: | SH 156 | Fund Cat: | 8 |
Limits To: | SH 150 | ESTIMATE: | $439,331 |
Length: | 8.9 | Actual | $0 |
Back... | Totals for 0403-02-019 | ||
Length: | 16.6 | ||
Estimate: | $1,012,023 | ||
Actual: |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |