| Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
| County | HOWARD |
| Highway | IH0020 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6087-99-001 |
| Proj ID | RMC - 608799001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 90244.48 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 06-28-10 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 07-05-10 |
| Contract Working Days | 44 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| OPEN RANGE RESOURCES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6087-99-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 11090810 |
| Totals | 90244.48 | 0.00 | 0.00 | 0.0 |
|
| County | MITCHELL |
| Highway | IH0020 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6091-68-001 |
| Proj ID | RMC - 609168001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 74365.20 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 05-13-10 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 07-06-10 |
| Contract Working Days | 38 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| OPEN RANGE RESOURCES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6091-68-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 11090813 |
| Totals | 74365.20 | 0.00 | 0.00 | 0.0 |
|
| County | NOLAN |
| Highway | IH0020 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6091-70-001 |
| Proj ID | RMC - 609170001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 75636.88 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 06-09-10 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 07-01-10 |
| Contract Working Days | 38 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| OPEN RANGE RESOURCES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6091-70-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 11090814 |
| Totals | 75636.88 | 0.00 | 0.00 | 0.0 |
|
| County | CALLAHAN |
| Highway | FM0018 |
| From | VARIOUS AREAS IN CALLAHAN COUNTY |
| To | VARIOUS AREAS IN TAYLOR COUNTY |
| CSJ | 6137-48-001 |
| Proj ID | RMC - 613748001 |
| Work Type | STREET SWEEPING |
| |
| 0.010 | 94400.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 165 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| WILLIAM D. KNIGHT |
SUBCONTRACTOR(S) FOR CCSJ: 6137-48-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 05060801 |
| Totals | 94400.00 | 0.00 | 0.00 | 0.0 |
|
| County | SHACKELFORD |
| Highway | US0180 |
| From | VARIOUS LOCATIONS IN SHACKELFORD CO. |
| To | VARIOUS LOCATIONS IN JONES & TAYLOR CO. |
| CSJ | 6224-12-001 |
| Proj ID | RMC - 622412001 |
| Work Type | PICNIC AREA AND LANDSCAPE MAINTENANCE |
| |
| 0.001 | 136344.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 365 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| TEXAS MOWING SERVICE |
SUBCONTRACTOR(S) FOR CCSJ: 6224-12-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 04110802 |
| Totals | 136344.00 | 0.00 | 0.00 | 0.0 |
|
| County | HOWARD |
| Highway | IH0020 |
| From | VARIOUS LOCATIONS IN HOWARD |
| To | AND MITCHELL COUNTIES |
| CSJ | 6240-20-001 |
| Proj ID | BPM - 624020001 |
| Work Type | BRIDGE JOINT AND DECK REPAIR |
| |
| 0.010 | 187650.00 | | 311894.81 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 07-07-14 |
| Work Began | 07-07-14 |
| Work Completed | 12-03-14 |
| Time Computed | 07-14-14 |
| Contract Working Days | 19 |
| Addl Days Granted | 34 |
| Working Days Charged | 54 |
| Percent Time Used | 101 |
| Contractor(s) |
| L.C. JORDAN & SON |
SUBCONTRACTOR(S) FOR CCSJ: 6240-20-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 04140801 |
| Totals | 187650.00 | 0.00 | 311894.81 | 100.0 |
|
| County | TAYLOR |
| Highway | FM3438 |
| From | TAYLOR HQ OFFICE |
| To | TAYLOR HQ OFFICE |
| CSJ | 6242-21-001 |
| Proj ID | RFC - 624221001 |
| Work Type | CONCRETE APRON |
| |
| 0.001 | 21440.00 | | 21440.00 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 05-30-12 |
| Work Began | 05-30-12 |
| Work Completed | |
| Time Computed | 05-30-12 |
| Contract Working Days | 35 |
| Addl Days Granted | 0 |
| Working Days Charged | 2 |
| Percent Time Used | 5 |
| Contractor(s) |
| 3-A GLASS & CONSTRUCTION |
SUBCONTRACTOR(S) FOR CCSJ: 6242-21-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 04120832 |
| Totals | 21440.00 | 0.00 | 21440.00 | 99.9 |
|
| County | TAYLOR |
| Highway | US0083 |
| From | VARIOUS LOCATIONS IN TAYLOR COUNTY |
| To | VARIOUS LOCATIONS IN CALLAHAN COUNTY |
| CSJ | 6249-55-001 |
| Proj ID | RMC - 624955001 |
| Work Type | CLEAN AND SEAL CRACKS AND JOINTS |
| |
| 0.001 | 78936.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 02-25-13 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 03-04-13 |
| Contract Working Days | 13 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| AUSTIMPACTORS LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6249-55-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 10120801 |
| Totals | 78936.00 | 0.00 | 0.00 | 0.0 |
|
| County | SCURRY |
| Highway | US0084 |
| From | US 84 @ |
| To | SH 208 |
| CSJ | 6271-30-001 |
| Proj ID | RMC - 627130001 |
| Work Type | HEAT STRAIGHTEN BRIDGE BEAMS |
| |
| 0.040 | 95600.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 20 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| GIBSON & ASSOCIATES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6271-30-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 09140801 |
| Totals | 95600.00 | 0.00 | 0.00 | 0.0 |
|
| County | STONEWALL |
| Highway | US0083 |
| From | VARIOUS LOCATIONS IN STONEWALL |
| To | VARIOUS LOCATIONS IN FISHER |
| CSJ | 6273-85-001 |
| Proj ID | RMC - 627385001 |
| Work Type | LANDSCAPE MAINTENANCE |
| |
| 0.001 | 40000.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 60 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| HJC FARMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6273-85-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 06140802 |
| Totals | 40000.00 | 0.00 | 0.00 | 0.0 |
|
| County | STONEWALL |
| Highway | US0083 |
| From | VARIOUS LOCATIONS IN STONEWALL |
| To | VARIOUS LOCATIONS IN FISHER |
| CSJ | 6276-38-001 |
| Proj ID | RMC - 627638001 |
| Work Type | LANDSCAPE MAINTENANCE |
| |
| 0.001 | 70000.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 60 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| HJC FARMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6276-38-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 08140801 |
| Totals | 70000.00 | 0.00 | 0.00 | 0.0 |
|
| County | KENT |
| Highway | SH0070 |
| From | JANITORIAL MAINTENANCE |
| To | KENT COUNTY |
| CSJ | 6357-11-001 |
| Proj ID | SUP - 635711001 |
| Work Type | JANITORIAL MAINTENANCE |
| |
| 0.010 | 19535.12 | | 64416.25 | 99.9 |
| Work Order | 01-13-20 |
| Work Began | 02-01-20 |
| Work Completed | |
| Time Computed | 02-01-20 |
| Contract Working Days | 731 |
| Addl Days Granted | 1,461 |
| Working Days Charged | 1,735 |
| Percent Time Used | 79 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6357-11-001 WORLD TECHNICAL SERVICES, INC. (100.00) WORLD TECHNICAL SERVICES, INC. (100.00)
|
| Contract # | 01200830 |
| Totals | 19535.12 | 768.89 | 64416.25 | 99.9 |
|
| County | CALLAHAN |
| Highway | FM3217 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6359-16-001 |
| Proj ID | MMC - 635916001 |
| Work Type | AGGREGATE |
| |
| 0.010 | 239745.00 | | 499858.34 | 99.9 |
| Work Order | 12-28-23 |
| Work Began | 01-15-24 |
| Work Completed | |
| Time Computed | 01-15-24 |
| Contract Working Days | 183 |
| Addl Days Granted | 183 |
| Working Days Charged | 291 |
| Percent Time Used | 79 |
| Contractor(s) |
| ZACK BURKETT CO. |
SUBCONTRACTOR(S) FOR CCSJ: 6359-16-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 12230804 |
| Totals | 239745.00 | 107776.46 | 499858.34 | 99.9 |
|
| County | HOWARD |
| Highway | IH0020 |
| From | HOWARD COUNTY MAINTENANCE SECTION |
| To | HOWARD COUNTY MAINTENANCE SECTION |
| CSJ | 6369-97-001 |
| Proj ID | MMC - 636997001 |
| Work Type | BRINE WATER PICKUP |
| |
| 0.001 | 25000.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 120 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| MAHAN FOUNDATION & CONTRACTORS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6369-97-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 11200802 |
| Totals | 25000.00 | 0.00 | 0.00 | 0.0 |
|
| County | BORDEN |
| Highway | US0180 |
| From | BORDEN COUNTY MAINTENANCE SECTION |
| To | BORDEN COUNTY MAINTENANCE SECTION |
| CSJ | 6370-09-001 |
| Proj ID | MMC - 637009001 |
| Work Type | BRINE WATER PICKUP |
| |
| 0.001 | 25000.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 120 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| MAHAN FOUNDATION & CONTRACTORS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6370-09-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 11200804 |
| Totals | 25000.00 | 0.00 | 0.00 | 0.0 |
|
| County | TAYLOR |
| Highway | IH0020 |
| From | VARIOUS LOCATIONS |
| To | AT DISTRICT OFFICE COMPLEX |
| CSJ | 6389-62-001 |
| Proj ID | SUP - 638962001 |
| Work Type | JANITORIAL, GROUNDS AND/OR LANDSCAPE SE |
| |
| 0.010 | 87360.00 | | 103299.00 | 99.9 |
| Work Order | 09-01-21 |
| Work Began | 09-01-21 |
| Work Completed | |
| Time Computed | 09-01-21 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,157 |
| Percent Time Used | 79 |
| Contractor(s) |
WORKQUEST RELIEF ENTERPRISES |
SUBCONTRACTOR(S) FOR CCSJ: 6389-62-001 RELIEF ENTERPRISES (0.00)
|
| Contract # | 08210830 |
| Totals | 87360.00 | 3386.25 | 103299.00 | 99.9 |
|
| County | CALLAHAN |
| Highway | IH0020 |
| From | VARIOUS LOCATIONS IN |
| To | CALLAHAN COUNTY |
| CSJ | 6393-57-001 |
| Proj ID | SUP - 639357001 |
| Work Type | LITTER REMOVAL |
| |
| 0.010 | 168055.00 | | 225054.50 | 99.9 |
| Work Order | 12-28-21 |
| Work Began | 02-01-22 |
| Work Completed | |
| Time Computed | 02-01-22 |
| Contract Working Days | 730 |
| Addl Days Granted | 731 |
| Working Days Charged | 1,004 |
| Percent Time Used | 68 |
| Contractor(s) |
WORKQUEST ALDERSGATE ENRICHMENT CENTER, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6393-57-001 ALDERSGATE ENRICHMENT CENTER, INC. (100.00)
|
| Contract # | 12210832 |
| Totals | 168055.00 | 10396.50 | 225054.50 | 99.9 |
|
| County | MITCHELL |
| Highway | SH0208 |
| From | MITCHELL COUNTY MAINTENANCE FACILITY |
| To | MITCHELL COUNTY MAINTENANCE FACILITY |
| CSJ | 6430-20-001 |
| Proj ID | SUP - 643020001 |
| Work Type | JANITORIAL MAINTENANCE |
| |
| 0.010 | 28931.60 | | 24846.56 | 85.8 |
| Work Order | 12-05-22 |
| Work Began | 01-01-23 |
| Work Completed | |
| Time Computed | 01-01-23 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 670 |
| Percent Time Used | 91 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6430-20-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 11220830 |
| Totals | 28931.60 | 1091.24 | 24846.56 | 85.8 |
|
| County | TAYLOR |
| Highway | IH0020 |
| From | VARIOUS LOCATIONS IN TAYLOR, JONES |
| To | AND NOLAN COUNTIES |
| CSJ | 6432-42-001 |
| Proj ID | SUP - 643242001 |
| Work Type | LITTER REMOVAL |
| |
| 0.010 | 299344.40 | | 346346.10 | 99.9 |
| Work Order | 01-24-23 |
| Work Began | 02-01-23 |
| Work Completed | |
| Time Computed | 02-01-23 |
| Contract Working Days | 365 |
| Addl Days Granted | 366 |
| Working Days Charged | 639 |
| Percent Time Used | 87 |
| Contractor(s) |
WORKQUEST RELIEF ENTERPRISES |
SUBCONTRACTOR(S) FOR CCSJ: 6432-42-001 RELIEF ENTERPRISES (0.00)
|
| Contract # | 01230830 |
| Totals | 299344.40 | 22695.00 | 346346.10 | 99.9 |
|
| County | TAYLOR |
| Highway | FM0089 |
| From | VARIOUS LOCATIONS IN |
| To | (RURAL) TAYLOR COUNTY |
| CSJ | 6432-54-001 |
| Proj ID | RMC - 643254001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 204000.00 | | 161700.00 | 79.2 |
| Work Order | 05-01-24 |
| Work Began | 05-15-24 |
| Work Completed | |
| Time Computed | 06-03-24 |
| Contract Working Days | 365 |
| Addl Days Granted | 0 |
| Working Days Charged | 170 |
| Percent Time Used | 46 |
| Contractor(s) |
| ABESCAPE LANDSCAPING, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6432-54-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02240801 |
| Totals | 204000.00 | 81850.00 | 161700.00 | 79.2 |
|