Monthly State Let Construction Report For Lufkin District As Of Nov 10, 2024 Page 1 Of 3

Last Update: Sunday, November 10, 2024
FTP Icon
page 1 | page 2 | page 3

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyNACOGDOCHES ETC
HighwaySH 7 ETC
FromSL 224
ToFM 2713
CSJ0059-01-062
Proj IDF 2025(207)
Work TypeSEAL COAT
 
18053313.660.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days148
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
CLARK CONSTRUCTION OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0059-01-062
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #11243208
Totals18053313.660.000.000.0

CountySHELBY ETC
HighwaySL 157 ETC
FromUS 59 NORTH
ToUS 96 SOUTH
CSJ0063-07-003
Proj IDF 2024(392)
Work TypeSEAL COAT
 
2.69012827779.2010359344.3880.7
Work Order12-21-23
Work Began08-05-24
Work Completed
Time Computed05-01-24
Contract Working Days106
Addl Days Granted0
Working Days Charged102
Percent Time Used96
Contractor(s)
CLARK CONSTRUCTION OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0063-07-003
INTERSTATE BARRICADES & MARKINGS, INC. (14.71)
Contract #11233024
Totals12827779.2050540.0010359344.3880.7

CountySHELBY ETC
HighwaySH 87 ETC
FromSH 7
ToSH 147
CSJ0064-01-069
Proj IDF 2023(196)
Work TypeSEAL COAT
 
42.13815659341.6913939288.2789.3
Work Order12-14-22
Work Began07-19-23
Work Completed
Time Computed05-01-23
Contract Working Days125
Addl Days Granted0
Working Days Charged158
Percent Time Used126
Contractor(s)
CLARK CONSTRUCTION OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0064-01-069
INTERSTATE BARRICADES & MARKINGS, INC. (11.56)
Contract #11223006
Totals15659341.690.0013939288.2789.3

CountyHOUSTON ETC
HighwayUS 287
FromBU 287V NORTH
ToBU 287V SOUTH
CSJ0109-03-041
Proj IDSTP 2024(815)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
388546.190.000.0
Work Order04-18-24
Work Began00-00-00
Work Completed
Time Computed07-17-24
Contract Working Days81
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
THIRD COAST SERVICES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0109-03-041
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #03243233
Totals388546.190.000.000.0

CountyHOUSTON
HighwayUS 287
FromANDERSON COUNTY LINE
To2.198 MI N OF FM 2663
CSJ0109-03-044
Proj IDC 109-3-44
Work TypeOVERLAY
 
11224367.454310121.1238.3
Work Order05-03-24
Work Began09-27-24
Work Completed
Time Computed07-23-24
Contract Working Days140
Addl Days Granted0
Working Days Charged21
Percent Time Used15
Contractor(s)
BIG CREEK CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0109-03-044
FLEX SUPPLY, LLC (0.27)
STRIPING TECHNOLOGY, L.P. (2.27)
WEST TEXAS ROCK RESOURCES, LLC (0.42)
STRAIGHT LINE SAWING & SEALING, INC. (0.19)
NEXT CONSTRUCTION SOLUTIONS LLC (0.00)
Contract #03243006
Totals11224367.454196910.124310121.1238.3

CountyHOUSTON
HighwaySH 19
FromSL 304
To5.5 MILES SOUTH OF SL 304
CSJ0109-05-043
Proj IDF 2025(149)
Work TypeOVERLAY
 
3019865.560.000.0
CountyHOUSTON
HighwaySH 21
From2.1 MI SW OF SH 7
To0.6 MI SW OF SH 7
CSJ0117-07-044
Proj IDC 117-7-44
Work TypeOVERLAY
 
335809.300.000.0
CountyHOUSTON
HighwaySL 304
From0.1 MI W OF SH 21
To0.1 MI E OF SH 19
CSJ1854-01-051
Proj IDF 2B24(103)
Work TypeOVERLAY
 
9826174.950.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days263
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0109-05-043
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #10243011
Totals13181849.810.000.000.0

CountyHOUSTON
HighwaySH 21
FromSH 21 AT TRINITY RIVER
To.
CSJ0117-06-047
Proj IDBR 2022(446)
Work TypeBRIDGE REPLACEMENT
 
0.10027844040.2123490461.2484.3
Work Order05-10-22
Work Began08-08-22
Work Completed
Time Computed08-08-22
Contract Working Days418
Addl Days Granted3
Working Days Charged393
Percent Time Used93
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0117-06-047
DUSTIN ALLEN, INC. (0.13)
HERMANOS STEEL, LLC (0.97)
PINNACLE GRINDING AND GROOVING LLC (0.01)
PRIMATE CONSTRUCTION, LP (0.14)
STRIPE LINES, INC. (0.42)
CEN TEX HYDROSEED, INC. (0.70)
LINDAMOOD, INC. (3.52)
A-CORE CONCRETE CUTTING, INC. (0.02)
Contract #04223202
Totals27844040.21257655.5823490461.2484.3

CountyHOUSTON
HighwaySH 21
From2.56 MILES WEST OF FM 1733
ToCHEROKEE COUNTY LINE
CSJ0118-02-036
Proj IDF 2024(613)
Work TypeWIDEN NON-FREEWAY
 
14327451.661357599.549.4
Work Order02-02-24
Work Began05-10-24
Work Completed
Time Computed05-02-24
Contract Working Days314
Addl Days Granted0
Working Days Charged99
Percent Time Used31
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0118-02-036
A R BROTHERS CONSTRUCTION SERVICES, INC. (2.97)
COLD CREEK CONSTRUCTION, LTD (5.67)
STRIPE-A-ZONE, LLC (3.63)
SURFACE PREPARATION TECHNOLOGIES, LLC (0.12)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.78)
TEXAS MATERIALS GROUP, INC. (43.25)
TRAFFIC SIGNS & LINES, LLC (0.91)
DUSTROL, INC. (0.53)
MISSOURI PETROLEUM PRODUCTS COMPANY LLC (6.53)
A BROTHERS MILLING, LLC (0.27)
SUPERIOR TRAFFIC CONTROL, LLC (0.04)
Contract #01243205
Totals14327451.6610000.001357599.549.4

CountyNACOGDOCHES
HighwayBS 21-P ETC
FromUS 59
To0.338 MI W OF FM 225
CSJ0118-06-077
Proj IDF 2024(934)
Work TypeOVERLAY
 
10814630.570.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days230
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0118-06-077
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #06243217
Totals10814630.570.000.000.0

CountyNACOGDOCHES
HighwaySH 21
FromSH 21 AT ATASCOSO CREEK
ToSH 21 AT ATASCOSO CREEK
CSJ0118-08-076
Proj IDBR 2021(343)
Work TypeBRIDGE REPLACEMENT
 
0.0285478921.255054668.8093.3
Work Order06-17-21
Work Began09-17-21
Work Completed
Time Computed09-15-21
Contract Working Days321
Addl Days Granted150
Working Days Charged525
Percent Time Used111
Contractor(s)
ATLANTIC SPECIALTY INSURANCE COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0118-08-076
MORRIS COUNTY CONTRACTORS, L.L.C. (1.21)
PANOLA SIGN & BARRICADE, INC. (0.32)
PRIMATE CONSTRUCTION, LP (0.18)
RAYFORD"S TRUCK & TRACTOR (9.44)
(INACTIVE)STRIPE-A-ZONE, INC. (0.45)
PREMIER PAVING, LTD. (4.38)
TEXOP CONSTRUCTION (0.49)
PANOLA SIGN & BARRICADE, INC. (0.15)
SKYLINE BRIDGE LLC (54.03)
GVK GROUP LLC (2.71)
NEXT CONSTRUCTION SOLUTIONS LLC (0.05)
STRIPING TECHNOLOGY, L.P. (0.53)
TEXOP CONSTRUCTION (0.14)
DREWERY CONSTRUCTION COMPANY, INCORPORATED (4.03)
PEACHTREE CONSTRUCTION, LTD. (2.32)
Contract #05213230
Totals5478921.25180810.405054668.8093.3

CountyNACOGDOCHES
HighwayBS 21-P ETC
FromFM 225
ToBU 59F
CSJ0118-08-090
Proj IDSTP 2023(289)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
329755.02318937.8596.7
Work Order01-26-23
Work Began06-24-24
Work Completed
Time Computed02-25-23
Contract Working Days40
Addl Days Granted0
Working Days Charged33
Percent Time Used82
Contractor(s)
ECONOLITE SYSTEMS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0118-08-090
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #12223029
Totals329755.020.00318937.8596.7

CountySABINE
HighwaySH 21
From0.65 MI W OF SABINE RIVER BRIDGE
To0.35 MI W OF SABINE RIVER BRIDGE
CSJ0119-05-004
Proj IDF 2B24(146)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
1987987.070.000.0
Work Order08-01-24
Work Began00-00-00
Work Completed
Time Computed10-30-24
Contract Working Days124
Addl Days Granted0
Working Days Charged1
Percent Time Used0
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0119-05-004
AMERICAN REMEDIATION OPTIONS, INC. (5.09)
A R BROTHERS CONSTRUCTION SERVICES, INC. (3.83)
LELAND & BRADLEE CONSTRUCTION, INC. (3.33)
PANOLA SIGN & BARRICADE, INC. (0.68)
INTERSTATE BARRICADES & MARKINGS, INC. (3.51)
DUSTROL, INC. (0.98)
Contract #06243034
Totals1987987.070.000.000.0

CountyNACOGDOCHES
HighwayUS 59
From0.25 MILES SOUTH OF FM 95
ToUS 59/US 259 INTERCHANGE
CSJ0175-07-065
Proj IDF 2B23(190)
Work TypeOVERLAY
 
6975521.467353963.8399.9
Work Order12-05-23
Work Began05-06-24
Work Completed
Time Computed01-04-24
Contract Working Days119
Addl Days Granted0
Working Days Charged99
Percent Time Used83
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0175-07-065
AMERICAN REMEDIATION OPTIONS, INC. (0.99)
DUSTROL, INC. (0.90)
INTERSTATE BARRICADES & MARKINGS, INC. (5.70)
PANOLA SIGN & BARRICADE, INC. (0.25)
Contract #09233011
Totals6975521.465865.767353963.8399.9

CountyNACOGDOCHES
HighwayUS 59
FromSH 7
To1.242 MI SOUTH OF SPRADLEY ST.
CSJ0176-01-081
Proj IDNH 1902(081)
Work TypeINC
 
3.05083149848.4368277429.8682.2
CountyNACOGDOCHES
HighwayUS 59
FromSH 7
To1.242 MI SOUTH OF SPRADLEY ST.
CSJ0176-01-110
Proj IDNH 2017(212)
Work TypeRIGHT OF WAY
 
3.0503048521.003044374.2499.8
Work Order08-13-19
Work Began08-20-19
Work Completed
Time Computed11-11-19
Contract Working Days523
Addl Days Granted66
Working Days Charged628
Percent Time Used106
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0176-01-081
AMERICAN REMEDIATION OPTIONS, INC. (1.50)
MCL CONTRACTING, LLC (4.68)
SOUTH TEXAS PAINTING COMPANY (0.13)
JOHN WRIGHT CONSTRUCTION (3.34)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. (1.79)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (2.33)
TOTAL HIGHWAY MAINTENANCE, LLC (0.18)
BOWMAN ENGINEERING & CONSULTING, INC. (0.15)
STRIPING TECHNOLOGY, L.P. (0.33)
FARR FOUNDATION, INC. (0.30)
DYWIDAG-SYSTEMS INTERNATIONAL_USA,INC. (0.21)
EXPRESS EMPLOYMENT PROFESSIONALS (0.00)
AARON CONCRETE CONTRACTORS, L.P. (0.80)
TORO BRAVO CONSTRUCTION, LLC (0.05)
J & KD, L.L.C. (0.07)
ANTIGO CONSTRUCTION, INC. (0.05)
SNOWHILL CONTRACTING LLC (0.36)
A&J REBAR LLC (3.43)
MATRIX CONCRETE ROAD & BRIDGE, LLC (0.67)
PRIMATE CONSTRUCTION, LP (0.00)
SOUTHEAST GRINDING AND GROOVING LLC (0.00)
Contract #07193002
Totals86198369.43535672.1671321804.1082.8

CountyANGELINA
HighwayUS 59
FromFM 2021
To0.34 MILE NORTH OF SL 287
CSJ0176-02-118
Proj IDF 2021(440)
Work TypeCONVERT NON-FREEWAY TO FREEWAY
 
2.45062405510.6936961450.1359.2
CountyANGELINA
HighwayUS 59
FromFM 2021
To0.34 MILE NORTH OF SL 287
CSJ0176-02-121
Proj IDROW 0176-02-121
Work TypeRIGHT OF WAY
 
2.450740165.70728902.9098.4
Work Order07-20-22
Work Began09-14-22
Work Completed
Time Computed10-18-22
Contract Working Days512
Addl Days Granted46
Working Days Charged351
Percent Time Used62
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0176-02-118
ANCORTEX, INC. (2.26)
BUYERS BARRICADES, INC. (0.13)
J. H. ODEN CONTRACTING COMPANY (0.95)
JOHN WRIGHT CONSTRUCTION (1.04)
MOORE BROTHERS CONSTRUCTION COMPANY (8.44)
S & S BRIDGE PAINTING, INC. (0.01)
STRIPING TECHNOLOGY, L.P. (0.64)
WEST TEXAS ROCK RESOURCES, LLC (0.02)
TRAF-TEX, INC. (0.71)
AMERICAN REMEDIATION OPTIONS, INC. (0.08)
ANTIGO CONSTRUCTION, INC. (0.04)
HERMANOS STEEL, LLC (5.49)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.62)
A&J REBAR LLC (0.12)
HODGES AND SON CONSTRUCTION COMPANY, INC. (2.00)
A&J REBAR LLC (0.08)
AT STAFFING (0.00)
TEXAS MATERIALS GROUP, INC. (8.44)
Contract #06223201
Totals63145676.393109948.5937690353.0359.6

CountyANGELINA
HighwayUS 59
FromFM 2108
To1.15 MI SOUTH OF WHITE OAK CREEK
CSJ0176-03-097
Proj IDNH 2013(218)
Work TypeNEW LOCATION FREEWAY
 
8.200140098697.00118960933.3484.9
CountyANGELINA
HighwayUS 59
FromFM 2108
To1.15 MI SOUTH OF WHITE OAK CREEK
CSJ0176-03-116
Proj IDROW 176-3-116
Work TypeRIGHT OF WAY
 
8.200767232.00782872.5199.9
Work Order01-15-20
Work Began05-04-20
Work Completed
Time Computed04-14-20
Contract Working Days713
Addl Days Granted29
Working Days Charged690
Percent Time Used92
Contractor(s)
SACYR CONSTRUCTION USA LLC
SUBCONTRACTOR(S) FOR CCSJ: 0176-03-097
LONESTAR TRAFFIC SAFETY, LLC (0.04)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (2.57)
ADVANCE SITE PREP LLC (1.00)
FREDONIA CONSTRUCTION SERVICES (0.03)
TEXAS SCORPION HAULERS LLC, DBA TEXAS PRIDE HAULERS (0.05)
TERRY BLACK CONSTRUCTION COMPANY (0.40)
ANCORTEX, INC. (2.56)
A&J REBAR LLC (0.11)
LS HIGHWAY PRODUCTS, INC. (7.01)
A&J REBAR LLC (0.91)
PANTHER CREEK TRANSPORTATION, INC. (0.33)
CREACOM, INC. (1.63)
RME CONCRETE PUMPERS, INC (0.42)
JOHN DAVID HANOVER, LLC (0.07)
C&J CONTRACTORS LLC (1.37)
DREWERY CONSTRUCTION COMPANY, INCORPORATED (0.54)
ENGLISH DRILLING, INC. (0.01)
STRIPING TECHNOLOGY, L.P. (0.22)
STRAIGHT LINE SAWING & SEALING, INC. (0.28)
TEXOP CONSTRUCTION (0.47)
SOUTH TEXAS PAINTING CO. (0.23)
J. RUEDAS TRUCKING, LLC (0.08)
A.E.A. TRANSPORTATION (0.47)
TIGER CREEK ENTERPRISES, INC. (0.01)
SOUTHEAST GRINDING AND GROOVING LLC (0.08)
KC PROPERTY MANAGEMENT, LLC (0.52)
STRUCTURAL TECHNOLOGIES, LLC (0.06)
ALLEN LOGGINGS & SONS, INC. (0.55)
TEXAS SOLUTIONS TRUCKING, INC. (0.17)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. (0.70)
H&A DISCOUNT CORING (0.08)
GILGAL STONES CONSULTING, LLC (0.12)
ANTIGO CONSTRUCTION, INC. (0.04)
ROAD MAKER CONTRACTORS, LLC (2.46)
JUAN & SON CONTRACTING LLC (0.68)
Contract #12193201
Totals140865929.001913146.07119743805.8585.0

CountyPOLK
HighwayUS 59
From3.4 MI N OF US 287
ToUS 287
CSJ0176-04-056
Proj IDNH 2013(222)
Work TypeNEW LOCATION FREEWAY
 
7.060172740741.4669450206.1640.2
CountyPOLK
HighwayUS 59
From3.4 MI N OF US 287
ToUS 287
CSJ0176-04-074
Proj IDNH 2001(590)
Work TypeRIGHT OF WAY
 
3.80058366.620.000.0
Work Order06-27-22
Work Began10-03-22
Work Completed
Time Computed09-25-22
Contract Working Days902
Addl Days Granted0
Working Days Charged398
Percent Time Used44
Contractor(s)
JAMES CONSTRUCTION GROUP, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0176-04-056
LONESTAR TRAFFIC SAFETY, LLC (0.06)
ANCORTEX, INC. (2.19)
ALLSTATE SIGNAL & CONSTRUCTION, LLC (1.70)
EAGLE CONSTRUCTION LLC (7.16)
ISAACS CONSTRUCTION SERVICES LLC (0.25)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.37)
PRATER DIRT WORK LLC (0.35)
J & M CONTRACTING, COMPANY (2.10)
CHOCTAW ERECTORS, INC. (0.42)
BATTERSON, LLP (0.27)
MOORE BROTHERS CONSTRUCTION COMPANY (8.23)
WEST TEXAS ROCK RESOURCES, LLC (0.03)
CCC BLACKTOPPING LLC (0.46)
J.H. PAINTING COMPANY (0.16)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.62)
WILLOW CITY SIGN & RAIL, INC. (0.07)
PRIMATE CONSTRUCTION, LP (0.23)
B & N LOGGING, LLC (0.00)
RAY"S THREADING AND FAB SHOP (0.23)
LITTLE BEAUCHAMP TRUCKING (0.00)
A&J REBAR LLC (0.83)
GRAHAM RESOURCES, LLC (0.13)
TEXAS SOLUTIONS TRUCKING, INC. (0.09)
J. H. ODEN CONTRACTING COMPANY (0.07)
Contract #05223201
Totals172799108.083646164.5869450206.1640.1

CountyPOLK
HighwayUS 59
FromUS 287
ToUS 190
CSJ0176-05-201
Proj IDSTP 2B24(377)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
3233703.230.000.0
CountyPOLK
HighwayUS 59
From0.34 MI S OF BU 59J
ToSAN JACINTO COUNTY LINE
CSJ0177-01-118
Proj IDSTP 2B24(376)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
1347130.060.000.0
CountySAN JACINTO
HighwayUS 59
FromPOLK COUNTY LINE
ToFM 223
CSJ0177-02-109
Proj IDSTP 2B24(376)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
891598.200.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-18-24
Work Began00-00-00
Work Completed
Time Computed12-17-24
Contract Working Days203
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
SCOUT 5 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0176-05-201
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08243221
Totals5472431.490.000.000.0

CountyPOLK ETC
HighwayBU 59-J ETC
FromUS 59 NORTH
ToFM 1988
CSJ0176-06-016
Proj IDF 2023(076)
Work TypeOVERLAY
 
9240613.289073342.2598.6
Work Order05-17-23
Work Began08-30-23
Work Completed
Time Computed08-15-23
Contract Working Days121
Addl Days Granted8
Working Days Charged158
Percent Time Used122
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0176-06-016
PANOLA SIGN & BARRICADE, INC. (0.24)
DUSTROL, INC. (0.59)
STRIPING TECHNOLOGY, L.P. (7.35)
AT STAFFING (0.00)
Contract #01233207
Totals9240613.2826469.519073342.2598.6

CountySAN JACINTO
HighwayUS 59
FromFM 2914
ToLIBERTY C/L
CSJ0177-02-057
Proj IDF 2023(773)
Work TypeCONVERT NON-FREEWAY TO FREEWAY
 
3.580104794177.1432036909.1530.5
CountyLIBERTY
HighwayUS 59
FromSAN JACINTO C/L
To.65 MILE SOUTH OF SL 573
CSJ0177-03-099
Proj IDF 2023(992)
Work TypeFREEWAY OPERATIONAL IMPROVEMENTS
 
3.04085026476.8918955066.1622.2
Work Order09-08-23
Work Began12-14-23
Work Completed
Time Computed12-07-23
Contract Working Days1,309
Addl Days Granted0
Working Days Charged224
Percent Time Used17
Contractor(s)
WEBBER, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0177-02-057
ANTIGO CONSTRUCTION, INC. (0.11)
GMJ PAVING CO. (5.87)
MBN ENTERPRISES LLC (0.52)
MTAM CORPORATION (0.07)
PRIMATE CONSTRUCTION, LP (0.05)
PROFESSIONAL TRAFFIC CONTROL LLC (0.00)
SCOTT DERR PAINTING CO, LLC (0.03)
SK CONCRETE SERVICES LLC (0.20)
J. H. ODEN CONTRACTING COMPANY (0.14)
BELLA PAVING, INC. (0.34)
KING GEORGE TRAFFIC SOLUTIONS LLC (0.91)
LONESTAR TRAFFIC SAFETY, LLC (0.07)
RDI FOUNDATION DRILLING (3.89)
WILLOW CITY SIGN & RAIL, INC. (0.35)
JAM MATERIALS, LLC (0.19)
MESA ROD BUSTERS, INC. (1.73)
VALLEY PLACERS, LLC (0.19)
J & D TEX SERV, INCORPORATED (1.89)
THOMAS TRACTOR WORKS, INC. (0.20)
THIRD COAST SERVICES LLC (2.49)
CREACOM, INC. (0.17)
MCRAY CRANE (0.01)
Contract #06233402
Totals189820654.033767062.8650991975.3126.8

page 1 | page 2 | page 3