Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | HIDALGO |
Highway | 0000000 |
From | 600 WEST ESPRESSWAY 83, PHARR, TEXAS |
To | 600 WEST ESPRESSWAY 83, PHARR, TEXAS |
CSJ | 4704-01-684 |
Proj ID | CBC - 470401684 |
Work Type | LABORATORY HVAC UPGRADE - PHARR DHQ |
|
| 0.001 | 499000.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 180 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
ALPHA BUILDING CORPORATION |
SUBCONTRACTOR(S) FOR CCSJ: 4704-01-684 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06164213 |
| Totals | 499000.00 | 0.00 | 0.00 | 0.0 |
|
County | HIDALGO |
Highway | 0000000 |
From | 600 WEST US EXPRESSWAY 83 PHARR TEXAS |
To | 600 WEST US EXPRESSWAY 83 PHARR TEXAS |
CSJ | 4704-01-775 |
Proj ID | CBC - 470401775 |
Work Type | PHARR DHQ ELECTRICAL AND GENERATOR UPGRA |
|
| 0.001 | 519800.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 180 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
FSG FACILITY SOLUTIONS GROUP, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 4704-01-775 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09164227 |
| Totals | 519800.00 | 0.00 | 0.00 | 0.0 |
|
County | CAMERON |
Highway | PR0100 |
From | CAMERON COUNTY |
To | CAMERON COUNTY |
CSJ | 6175-04-001 |
Proj ID | BPM - 617504001 |
Work Type | BPM QIC BRIDGE DECK REPAIR |
|
| 0.001 | 97702.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 40 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
GIBSON & ASSOCIATES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6175-04-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 02082103 |
| Totals | 97702.00 | 0.00 | 0.00 | 0.0 |
|
County | HIDALGO |
Highway | US0083 |
From | HIDALGO, CAMERON, STARR AND WILLACY |
To | VARIOUS LOCATIONS |
CSJ | 6229-70-001 |
Proj ID | RMC - 622970001 |
Work Type | INSTALLATION OF HIGHWAY TRAFFIC SIGNALS |
|
| 0.010 | 915093.20 | | 1647473.23 | 100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 02-06-12 |
Work Began | 03-26-12 |
Work Completed | 04-30-15 |
Time Computed | 03-19-12 |
Contract Working Days | 345 |
Addl Days Granted | 120 |
Working Days Charged | 524 |
Percent Time Used | 112 |
Contractor(s) |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6229-70-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 01124014 |
| Totals | 915093.20 | 0.00 | 1647473.23 | 100.0 |
|
County | CAMERON |
Highway | US0083 |
From | VARIOUS HIGHWAYS IN PHARR DISTRICT |
To | VARIOUS HIGHWAYS IN PHARR DISTRICT |
CSJ | 6316-29-001 |
Proj ID | RMC - 631629001 |
Work Type | DEBRIS REMOVAL AND DISPOSAL |
|
| 0.001 | 599300.00 | | 0.00 | 100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 10-15-21 |
Work Completed | 10-25-21 |
Time Computed | 00-00-00 |
Contract Working Days | 25 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
T.F.R. ENTERPRISES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6316-29-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 04174216 |
| Totals | 599300.00 | 0.00 | 0.00 | 100.0 |
|
County | HIDALGO |
Highway | FM1015 |
From | FM 1015 |
To | I-69E |
CSJ | 6318-29-001 |
Proj ID | BPM - 631829001 |
Work Type | BPM |
|
| 0.010 | 827634.40 | | 1340818.87 | 100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | 02-29-20 |
Time Computed | 00-00-00 |
Contract Working Days | 120 |
Addl Days Granted | 66 |
Working Days Charged | 179 |
Percent Time Used | 96 |
Contractor(s) |
VALLEY INFRASTRUCTURE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6318-29-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03184007 |
| Totals | 827634.40 | 840.00 | 1340818.87 | 100.0 |
|
County | HIDALGO |
Highway | US0083 |
From | HIDALGO, CAMERON, STARR, AND WILLACY |
To | VARIOUS LOCATIONS |
CSJ | 6323-90-001 |
Proj ID | RMC - 632390001 |
Work Type | INSTALLATION OF HIGHWAY TRAFFIC SIGNALS |
|
| 0.010 | 778138.00 | | 1412182.15 | 99.9 |
Work Order | 02-09-18 |
Work Began | 05-07-18 |
Work Completed | |
Time Computed | 05-01-18 |
Contract Working Days | 220 |
Addl Days Granted | 200 |
Working Days Charged | 386 |
Percent Time Used | 91 |
Contractor(s) |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6323-90-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 01184012 |
| Totals | 778138.00 | 45763.00 | 1412182.15 | 99.9 |
|
County | HIDALGO |
Highway | IH0002 |
From | HIDALGO |
To | CAMERON |
CSJ | 6328-33-001 |
Proj ID | RMC - 632833001 |
Work Type | INSTALLATION OF CCTV |
|
| 0.010 | 772050.50 | | 661695.70 | 85.7 |
Work Order | 11-01-18 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 11-01-18 |
Contract Working Days | 180 |
Addl Days Granted | 80 |
Working Days Charged | 246 |
Percent Time Used | 94 |
Contractor(s) |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6328-33-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 05184012 |
| Totals | 772050.50 | 7500.00 | 661695.70 | 85.7 |
|
County | HIDALGO |
Highway | IH0002 |
From | HIDALGO COUNTY |
To | VARIOUS ROADS |
CSJ | 6337-18-001 |
Proj ID | RMC - 633718001 |
Work Type | EXPRESSWAY MOWING AND LITTER REMOVAL |
|
| 0.010 | 517345.12 | | 1087138.01 | 99.9 |
Work Order | 11-01-18 |
Work Began | 06-05-19 |
Work Completed | |
Time Computed | 06-05-19 |
Contract Working Days | 120 |
Addl Days Granted | 120 |
Working Days Charged | 115 |
Percent Time Used | 47 |
Contractor(s) |
R&M INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6337-18-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 10184023 |
| Totals | 517345.12 | 23598.75 | 1087138.01 | 99.9 |
|
County | HIDALGO |
Highway | IH0069C |
From | DISTRICT WIDE |
To | VARIOUS ROADWAYS |
CSJ | 6349-32-001 |
Proj ID | RMC - 634932001 |
Work Type | INSTALLATION OF HIGHWAY TRAFFIC SIGNALS |
|
| 0.010 | 805113.80 | | 1116129.50 | 99.9 |
Work Order | 01-03-20 |
Work Began | 11-02-20 |
Work Completed | |
Time Computed | 11-02-20 |
Contract Working Days | 220 |
Addl Days Granted | 220 |
Working Days Charged | 281 |
Percent Time Used | 63 |
Contractor(s) |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6349-32-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12194019 |
| Totals | 805113.80 | 0.00 | 1116129.50 | 99.9 |
|
County | HIDALGO |
Highway | IH0002 |
From | DISTRICT WIDE |
To | VARIOUS ROADWAYS |
CSJ | 6349-33-001 |
Proj ID | RMC - 634933001 |
Work Type | MAINTENANCE & REPAIR OF SAFETY LIGHTING |
|
| 0.010 | 710312.50 | | 1526613.30 | 99.9 |
Work Order | 01-13-20 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 10-26-20 |
Contract Working Days | 220 |
Addl Days Granted | 220 |
Working Days Charged | 357 |
Percent Time Used | 81 |
Contractor(s) |
VACA UNDERGROUND UTILITIES INC |
SUBCONTRACTOR(S) FOR CCSJ: 6349-33-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12194220 |
| Totals | 710312.50 | 0.00 | 1526613.30 | 99.9 |
|
County | HIDALGO |
Highway | IH0002 |
From | DISTRICT WIDE |
To | VARIOUS ROADWAYS |
CSJ | 6353-00-001 |
Proj ID | RMC - 635300001 |
Work Type | LARGE SIGN REPLACEMENT |
|
| | 915620.62 | | 464701.67 | 50.7 |
Work Order | 04-12-21 |
Work Began | 07-06-21 |
Work Completed | |
Time Computed | 07-06-21 |
Contract Working Days | 360 |
Addl Days Granted | 0 |
Working Days Charged | 95 |
Percent Time Used | 26 |
Contractor(s) |
TRAF-TEX, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6353-00-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03214018 |
| Totals | 915620.62 | 56634.19 | 464701.67 | 50.7 |
|
County | WILLACY |
Highway | IH0069E |
From | VARIOUS LOCATIONS |
To | WILLACY COUNTY |
CSJ | 6363-38-001 |
Proj ID | BPM - 636338001 |
Work Type | HIGHWAY BRIDGE PREVENTATIVE MAINTENANCE |
|
| 0.100 | 848211.00 | | 1708666.37 | 99.9 |
Work Order | 09-18-20 |
Work Began | 10-22-20 |
Work Completed | |
Time Computed | 10-22-20 |
Contract Working Days | 180 |
Addl Days Granted | 46 |
Working Days Charged | 212 |
Percent Time Used | 93 |
Contractor(s) |
LUCANIA CONSTRUCTION LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6363-38-001 PAVEMENT MARKINGS INC. (0.41) TEXAS HIGHWAY SYSTEMS, INC. (5.08)
|
Contract # | 08204207 |
| Totals | 848211.00 | 0.00 | 1708666.37 | 99.9 |
|
County | CAMERON |
Highway | BU0083S |
From | VARIOUS LOCATIONS |
To | CAMERON/ WILLACY COUNTY |
CSJ | 6365-58-001 |
Proj ID | RMC - 636558001 |
Work Type | CLEANING AND SWEEPING OF HIGHWAYS |
|
| 0.010 | 496748.24 | | 398540.42 | 81.4 |
Work Order | 09-02-20 |
Work Began | 10-05-20 |
Work Completed | |
Time Computed | 10-05-20 |
Contract Working Days | 480 |
Addl Days Granted | 0 |
Working Days Charged | 378 |
Percent Time Used | 78 |
Contractor(s) |
PAVEMENT PARTNERS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6365-58-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 07204202 |
| Totals | 496748.24 | 0.00 | 398540.42 | 81.4 |
|
County | HIDALGO |
Highway | IH0002 |
From | HIDALGO COUNTY |
To | CAMERON COUNTY |
CSJ | 6366-11-001 |
Proj ID | RMC - 636611001 |
Work Type | TRAFFIC CONTROL SERVICES |
|
| 0.010 | 571618.90 | | 306888.77 | 53.6 |
Work Order | 04-05-21 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 06-28-21 |
Contract Working Days | 180 |
Addl Days Granted | 0 |
Working Days Charged | 56 |
Percent Time Used | 31 |
Contractor(s) |
THE LEVY COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6366-11-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03214217 |
| Totals | 571618.90 | 6552.40 | 306888.77 | 53.6 |
|
County | CAMERON |
Highway | IH0069E |
From | VARIOUS ROADWAYS IN CAMERON COUNTY |
To | SAN BENITO AREA REGION |
CSJ | 6379-40-001 |
Proj ID | RMC - 637940001 |
Work Type | SWEEPING AND DEBRIS REMOVAL |
|
| 0.010 | 716667.00 | | 570841.00 | 80.5 |
Work Order | 05-14-21 |
Work Began | 07-14-21 |
Work Completed | |
Time Computed | 07-14-21 |
Contract Working Days | 378 |
Addl Days Granted | 0 |
Working Days Charged | 304 |
Percent Time Used | 80 |
Contractor(s) |
STRIPE-A-ZONE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6379-40-001 SWEEPING CORPORATION OF AMERICA, INC. (0.00)
|
Contract # | 04214214 |
| Totals | 716667.00 | 30983.50 | 570841.00 | 80.5 |
|
County | HIDALGO |
Highway | IH0002 |
From | VARIOUS LOCATIONS |
To | HIDALGO, CAMERON AND WILLACY COUNTY |
CSJ | 6379-63-001 |
Proj ID | RMC - 637963001 |
Work Type | TREE TRIMMING |
|
| 0.010 | 468400.00 | | 183980.00 | 39.2 |
Work Order | 08-26-21 |
Work Began | 12-13-21 |
Work Completed | |
Time Computed | 12-13-21 |
Contract Working Days | 480 |
Addl Days Granted | 0 |
Working Days Charged | 47 |
Percent Time Used | 9 |
Contractor(s) |
SAENZ UTILITY CONTRACTORS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6379-63-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 07214213 |
| Totals | 468400.00 | 0.00 | 183980.00 | 39.2 |
|
County | HIDALGO |
Highway | IH0002 |
From | VARIOUS ROADWAYS IN HIDALGO COUNTY |
To | PHARR AREA REGION |
CSJ | 6379-70-001 |
Proj ID | RMC - 637970001 |
Work Type | SWEEPING AND DEBRIS REMOVAL |
|
| 0.010 | 881300.40 | | 470481.60 | 54.8 |
Work Order | 09-01-21 |
Work Began | 09-01-21 |
Work Completed | |
Time Computed | 09-01-21 |
Contract Working Days | 420 |
Addl Days Granted | 0 |
Working Days Charged | 288 |
Percent Time Used | 68 |
Contractor(s) |
SWEEPING SERVICES OF TEXAS - OPERATING, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6379-70-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 05214017 |
| Totals | 881300.40 | 41302.40 | 470481.60 | 54.8 |
|
County | HIDALGO |
Highway | FM0396 |
From | VARIOUS LOCATIONS |
To | HIDALGO COUNTY |
CSJ | 6380-16-001 |
Proj ID | BPM - 638016001 |
Work Type | BRIDGE PREVENTATIVE MAINTENANCE |
|
| 0.010 | 677720.50 | | 296019.20 | 43.6 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 180 |
Addl Days Granted | 0 |
Working Days Charged | 41 |
Percent Time Used | 22 |
Contractor(s) |
SCR CIVIL CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6380-16-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08214014 |
| Totals | 677720.50 | 160520.00 | 296019.20 | 43.6 |
|
County | HIDALGO |
Highway | SH0495 |
From | VARIOUS COUNTIES |
To | DISTRICTWIDE |
CSJ | 6381-54-001 |
Proj ID | MMC - 638154001 |
Work Type | ASPHALTIC PATCHING MATERIAL |
|
| 0.010 | 83615.76 | | 85366.90 | 99.9 |
Work Order | 12-22-21 |
Work Began | 02-22-22 |
Work Completed | |
Time Computed | 02-22-22 |
Contract Working Days | 120 |
Addl Days Granted | 240 |
Working Days Charged | 313 |
Percent Time Used | 86 |
Contractor(s) |
WALLER COUNTY ASPHALT INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6381-54-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 11214024 |
| Totals | 83615.76 | 17277.22 | 85366.90 | 99.9 |
|