| Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
| County | VICTORIA |
| Highway | US0059 |
| From | VARIOUS ROADWAYS IN |
| To | VICTORIA, JACKSON & CALHOUN COUNTIES |
| CSJ | 6218-72-001 |
| Proj ID | RMC - 621872001 |
| Work Type | PERFORMANCE BASED VEGETATION MANAGEMENT |
| |
| 0.001 | 1592011.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| DEANGELO BROTHERS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6218-72-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 01114017 |
| Totals | 1592011.00 | 0.00 | 0.00 | 0.0 |
|
| County | COLORADO |
| Highway | US0090 |
| From | VARIOUS LIMITS |
| To | . |
| CSJ | 6220-45-001 |
| Proj ID | RMC - 622045001 |
| Work Type | MOWING HIGHWAY RIGHTS OF WAY |
| |
| 0.001 | 171658.64 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 70 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| XTW ENTERPRISES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6220-45-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 01114026 |
| Totals | 171658.64 | 0.00 | 0.00 | 0.0 |
|
| County | LAVACA |
| Highway | US0077 |
| From | VARIOUS ROADWAYS |
| To | . |
| CSJ | 6220-49-001 |
| Proj ID | RMC - 622049001 |
| Work Type | MOWING HIGHWAY RIGHTS OF WAY |
| |
| 0.001 | 215727.12 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 85 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| XTW ENTERPRISES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6220-49-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 01114030 |
| Totals | 215727.12 | 0.00 | 0.00 | 0.0 |
|
| County | COLORADO |
| Highway | SH0071 |
| From | WHARTON, MATAGORDA, AUSTIN, AND |
| To | COLORADO COUNTIES |
| CSJ | 6365-11-001 |
| Proj ID | RMC - 636511001 |
| Work Type | ON CALL FLAGGING OPERATIONS |
| |
| 0.001 | 826350.00 | | 3185336.08 | 99.9 |
| Work Order | 00-00-00 |
| Work Began | 09-01-20 |
| Work Completed | |
| Time Computed | 09-01-20 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,460 |
| Percent Time Used | 100 |
| Contractor(s) |
| SHORT-LINE CORPORATION |
SUBCONTRACTOR(S) FOR CCSJ: 6365-11-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 07204207 |
| Totals | 826350.00 | 0.00 | 3185336.08 | 99.9 |
|
| County | VICTORIA |
| Highway | US0059 |
| From | DISTRICT WIDE |
| To | . |
| CSJ | 6369-56-001 |
| Proj ID | RMC - 636956001 |
| Work Type | BRIDGE JOINT REPAIR |
| |
| | 511750.00 | | 1179318.33 | 99.9 |
| Work Order | 00-00-00 |
| Work Began | 06-21-22 |
| Work Completed | |
| Time Computed | 06-24-22 |
| Contract Working Days | 365 |
| Addl Days Granted | 365 |
| Working Days Charged | 730 |
| Percent Time Used | 100 |
| Contractor(s) |
| CRACKSEAL OF TEXAS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6369-56-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 01224022 |
| Totals | 511750.00 | 2001.00 | 1179318.33 | 99.9 |
|
| County | GONZALES |
| Highway | US0090 |
| From | DISTRICT WIDE |
| To | . |
| CSJ | 6369-58-001 |
| Proj ID | RMC - 636958001 |
| Work Type | BASE FAILURE PAVEMENT REPAIR |
| |
| 0.010 | 3203923.55 | | 3074452.67 | 95.9 |
| Work Order | 00-00-00 |
| Work Began | 05-17-21 |
| Work Completed | |
| Time Computed | 05-24-21 |
| Contract Working Days | 365 |
| Addl Days Granted | 0 |
| Working Days Charged | 365 |
| Percent Time Used | 100 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6369-58-001 BATTERSON, LLP (2.16) FLASHER EQUIPMENT COMPANY (0.57) LONE STAR EROSION CONTROL (1.18)
|
| Contract # | 03214020 |
| Totals | 3203923.55 | 0.00 | 3074452.67 | 95.9 |
|
| County | VICTORIA |
| Highway | US0059 |
| From | VICTORIA, WHARTON, AND |
| To | JACKSON COUNTIES |
| CSJ | 6384-57-001 |
| Proj ID | RMC - 638457001 |
| Work Type | LARGE SIGN REPLACEMENT |
| |
| 0.010 | 353146.85 | | 433249.17 | 99.9 |
| Work Order | 00-00-00 |
| Work Began | 05-17-22 |
| Work Completed | |
| Time Computed | 05-24-22 |
| Contract Working Days | 75 |
| Addl Days Granted | 13 |
| Working Days Charged | 151 |
| Percent Time Used | 171 |
| Contractor(s) |
| THIRD COAST SERVICES LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6384-57-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 01224023 |
| Totals | 353146.85 | 11993.72 | 433249.17 | 99.9 |
|
| County | GONZALES |
| Highway | US0183 |
| From | GONZALES, FAYETTE, LAVACA, DEWITT, |
| To | COLORADO, AND AUSTIN COUNTIES |
| CSJ | 6387-79-001 |
| Proj ID | RMC - 638779001 |
| Work Type | THERMOPLASTIC PAVEMENT MARKINGS |
| |
| 0.010 | 500100.00 | | 2021251.78 | 99.9 |
| Work Order | 00-00-00 |
| Work Began | 01-26-22 |
| Work Completed | |
| Time Computed | 02-07-22 |
| Contract Working Days | 365 |
| Addl Days Granted | 365 |
| Working Days Charged | 730 |
| Percent Time Used | 100 |
| Contractor(s) |
| INTERSTATE BARRICADES & MARKINGS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6387-79-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 10214026 |
| Totals | 500100.00 | 0.00 | 2021251.78 | 99.9 |
|
| County | FAYETTE |
| Highway | IH0010 |
| From | FAYETTE, COLORADO, LAVACA, DEWITT, |
| To | AND GONZALES COUNTIES |
| CSJ | 6388-64-001 |
| Proj ID | RMC - 638864001 |
| Work Type | METAL BEAM GUARD FENCE REPAIR |
| |
| 0.010 | 1747594.00 | | 1441447.80 | 82.4 |
| Work Order | 00-00-00 |
| Work Began | 01-26-22 |
| Work Completed | |
| Time Computed | 01-31-22 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 730 |
| Percent Time Used | 100 |
| Contractor(s) |
| ELITE CASTLE RESOURCES LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6388-64-001 RHINO EQUITY, LLC (25.00)
|
| Contract # | 11214029 |
| Totals | 1747594.00 | 0.00 | 1441447.80 | 82.4 |
|
| County | AUSTIN |
| Highway | SH0036 |
| From | AUSTIN, WHARTON, MATAGORDA, AND |
| To | COLORADO COUNTIES |
| CSJ | 6394-33-001 |
| Proj ID | RMC - 639433001 |
| Work Type | ASPHALT PAVEMENT REPAIR |
| |
| 0.010 | 1117948.26 | | 1147274.29 | 100.0 |
| Work Order | 00-00-00 |
| Work Began | 07-27-22 |
| Work Completed | 11-08-24 |
| Time Computed | 08-03-22 |
| Contract Working Days | 30 |
| Addl Days Granted | 0 |
| Working Days Charged | 13 |
| Percent Time Used | 43 |
| Contractor(s) |
| CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. |
SUBCONTRACTOR(S) FOR CCSJ: 6394-33-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 03224022 |
| Totals | 1117948.26 | 0.00 | 1147274.29 | 100.0 |
|
| County | WHARTON |
| Highway | US0059 |
| From | WHARTON, MATAGORDA, AND AUSTIN COUNTIES |
| To | . |
| CSJ | 6394-44-001 |
| Proj ID | RMC - 639444001 |
| Work Type | METAL BEAM GUARD FENCE REPAIR |
| |
| 0.010 | 1041864.40 | | 1487697.20 | 99.9 |
| Work Order | 00-00-00 |
| Work Began | 09-06-22 |
| Work Completed | |
| Time Computed | 09-06-22 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 781 |
| Percent Time Used | 53 |
| Contractor(s) |
| JCW CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6394-44-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 04224019 |
| Totals | 1041864.40 | 0.00 | 1487697.20 | 99.9 |
|
| County | FAYETTE |
| Highway | IH0010 |
| From | DISTRICT WIDE WITH THE EXCEPTION |
| To | OF AUSTIN COUNTY |
| CSJ | 6394-45-001 |
| Proj ID | RMC - 639445001 |
| Work Type | BRIDGE PREVENTATIVE MAINTENANCE |
| |
| 0.010 | 344752.09 | | 1348787.16 | 99.9 |
| Work Order | 00-00-00 |
| Work Began | 06-05-23 |
| Work Completed | |
| Time Computed | 06-12-23 |
| Contract Working Days | 75 |
| Addl Days Granted | 0 |
| Working Days Charged | 69 |
| Percent Time Used | 92 |
| Contractor(s) |
| CRACKSEAL OF TEXAS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6394-45-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 12224202 |
| Totals | 344752.09 | 0.00 | 1348787.16 | 99.9 |
|
| County | FAYETTE |
| Highway | IH0010 |
| From | DISTRICT WIDE |
| To | . |
| CSJ | 6394-51-001 |
| Proj ID | RMC - 639451001 |
| Work Type | METAL BEAM GUARD FENCE REPAIR |
| |
| 0.010 | 959885.15 | | 2226398.28 | 99.9 |
| Work Order | 00-00-00 |
| Work Began | 04-11-22 |
| Work Completed | |
| Time Computed | 04-11-22 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 929 |
| Percent Time Used | 63 |
| Contractor(s) |
| JCW CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6394-51-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02224228 |
| Totals | 959885.15 | 0.00 | 2226398.28 | 99.9 |
|
| County | COLORADO |
| Highway | SS0052 |
| From | WHARTON, MATAGORDA, AUSTIN, AND |
| To | COLORADO COUNTIES |
| CSJ | 6401-54-001 |
| Proj ID | RMC - 640154001 |
| Work Type | ASPHALT PAVEMENT REPAIR |
| |
| 0.010 | 468903.40 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 01-01-25 |
| Contract Working Days | 30 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6401-54-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 05244018 |
| Totals | 468903.40 | 0.00 | 0.00 | 0.0 |
|
| County | COLORADO |
| Highway | SH0071 |
| From | DISTRICTWIDE |
| To | . |
| CSJ | 6402-41-001 |
| Proj ID | RMC - 640241001 |
| Work Type | TRAFFIC CONTROL SERVICES |
| |
| 0.010 | 1307200.00 | | 134119.50 | 10.2 |
| Work Order | 00-00-00 |
| Work Began | 08-30-24 |
| Work Completed | |
| Time Computed | 09-03-24 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 53 |
| Percent Time Used | 7 |
| Contractor(s) |
| SHORT-LINE CORPORATION |
SUBCONTRACTOR(S) FOR CCSJ: 6402-41-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 06244046 |
| Totals | 1307200.00 | 90562.50 | 134119.50 | 10.2 |
|
| County | LAVACA |
| Highway | US0077 |
| From | LAVACA COUNTY |
| To | . |
| CSJ | 6410-80-001 |
| Proj ID | RMC - 641080001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 461076.00 | | 320142.00 | 69.4 |
| Work Order | 00-00-00 |
| Work Began | 07-10-23 |
| Work Completed | |
| Time Computed | 07-17-23 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 471 |
| Percent Time Used | 64 |
| Contractor(s) |
| P-VILLE, INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6410-80-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02234205 |
| Totals | 461076.00 | 130110.00 | 320142.00 | 69.4 |
|
| County | FAYETTE |
| Highway | SH0071 |
| From | FAYETTE COUNTY |
| To | . |
| CSJ | 6410-82-001 |
| Proj ID | RMC - 641082001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 727274.00 | | 518003.00 | 71.2 |
| Work Order | 00-00-00 |
| Work Began | 06-07-23 |
| Work Completed | |
| Time Computed | 06-14-23 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 500 |
| Percent Time Used | 68 |
| Contractor(s) |
| P-VILLE, INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6410-82-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02234008 |
| Totals | 727274.00 | 8334.50 | 518003.00 | 71.2 |
|
| County | GONZALES |
| Highway | US0183 |
| From | GONZALES COUNTY |
| To | . |
| CSJ | 6410-83-001 |
| Proj ID | RMC - 641083001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 551100.00 | | 217800.00 | 39.5 |
| Work Order | 00-00-00 |
| Work Began | 06-07-23 |
| Work Completed | |
| Time Computed | 06-14-23 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 500 |
| Percent Time Used | 68 |
| Contractor(s) |
| P-VILLE, INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6410-83-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02234206 |
| Totals | 551100.00 | 0.00 | 217800.00 | 39.5 |
|
| County | DEWITT |
| Highway | US0087 |
| From | DEWITT COUNTY |
| To | . |
| CSJ | 6410-85-001 |
| Proj ID | RMC - 641085001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 460944.00 | | 269725.00 | 58.5 |
| Work Order | 00-00-00 |
| Work Began | 05-31-23 |
| Work Completed | |
| Time Computed | 06-07-23 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 482 |
| Percent Time Used | 66 |
| Contractor(s) |
| P-VILLE, INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6410-85-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02234207 |
| Totals | 460944.00 | 76807.00 | 269725.00 | 58.5 |
|
| County | GONZALES |
| Highway | IH0010 |
| From | GONZALES, FAYETTE, COLORADO, AND |
| To | AUSTIN COUNTIES |
| CSJ | 6410-87-001 |
| Proj ID | RMC - 641087001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 757723.50 | | 365613.75 | 48.2 |
| Work Order | 00-00-00 |
| Work Began | 05-08-23 |
| Work Completed | |
| Time Computed | 05-15-23 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 530 |
| Percent Time Used | 72 |
| Contractor(s) |
| P-VILLE, INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6410-87-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02234009 |
| Totals | 757723.50 | 0.00 | 365613.75 | 48.2 |
|