Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | TARRANT |
Highway | FM 156 |
From | INTERMODAL PARKWAY |
To | DENTON COUNTY LINE |
CSJ | 0718-02-072 |
Proj ID | F 2023(819) |
Work Type | OVERLAY |
|
| 5.338 | 5497888.16 | | 4384973.67 | 79.7 |
Work Order | 10-06-23 |
Work Began | 11-21-23 |
Work Completed | |
Time Computed | 11-06-23 |
Contract Working Days | 150 |
Addl Days Granted | 0 |
Working Days Charged | 82 |
Percent Time Used | 54 |
Contractor(s) |
TEXAS MATERIALS GROUP, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0718-02-072 BARRICADES UNLIMITED (19.28) DUSTROL, INC. (6.72) FORTSON CONTRACTING, INC. (3.14) IBCTX, LLC (5.52) JR WEST TEXAS CONCRETE LLC (6.43) LINEAR TRAFFIC MARKINGS LLC (4.66) SURFACE PREPARATION TECHNOLOGIES, LLC (0.20) SYNERGY SIGNS & SERVICES LLC (1.53) WOLFE CONSTRUCTION GROUP, INCORPORATED (0.11)
|
Contract # | 05233253 |
| Totals | 5497888.16 | 2177010.34 | 4384973.67 | 79.7 |
|
County | TARRANT |
Highway | FM 156 |
From | AT AVONDALE HASLET RD |
To | . |
CSJ | 0718-02-074 |
Proj ID | CM 2B20(200) |
Work Type | INTERSECTION & OPERATIONAL IMPRV |
|
| 0.019 | 3091923.03 | | 89854.66 | 2.9 |
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | . |
CSJ | 0902-90-141 |
Proj ID | CM 2B20(200) |
Work Type | NEW LOCATION NON-FREEWAY |
|
| | 35749886.34 | | 29655706.12 | 82.9 |
Work Order | 02-03-21 |
Work Began | 02-25-21 |
Work Completed | |
Time Computed | 03-06-21 |
Contract Working Days | 1,014 |
Addl Days Granted | 424 |
Working Days Charged | 1,082 |
Percent Time Used | 75 |
Contractor(s) |
ZACHRY CONSTRUCTION CORPORATION |
SUBCONTRACTOR(S) FOR CCSJ: 0718-02-074 T-BAR FENCE, INC. (0.66) VENUS CONSTRUCTION COMPANY (20.73) TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.63) ACT SAW CUTTING & REMOVAL (0.18) DALLAS LITE AND BARRICADE, INC. (0.03) FORTSON CONTRACTING, INC. (1.80) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.01) REYNOLDS ASPHALT & CONSTRUCTION COMPANY (7.76) TEXOP CONSTRUCTION (0.20) WYLIE DRILLING & DRAINAGE, INC. (0.42) TOR TEXAS, LLC (0.07) TORO BRAVO CONSTRUCTION, LLC (0.03) ROYAL REBAR (5.60) MICA CORPORATION (4.03) OSCAR ORDUNO, INC. (0.78) ADCOCK 4 INVESTMENTS, LLC (3.20) WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (0.79) (INACTIVE)C.T. AND S. METALWORKS, INC. (0.00) TRP CONSTRUCTION GROUP, LLC (0.31) CGC LOGISTICS (0.02) DURABLE SPECIALTIES, INC. (2.76) VISTA RIDGE CONCRETE PUMPING, INC. (0.05) ECC TRUCKING LLC (0.06) SOUTHEAST GRINDING AND GROOVING LLC (0.01) HERDEZ TRUCKING, INC. (0.03) WOOD WATERING SERVICE LLC (0.50) BRENDA PRICE TRUCKING (0.25) C T & S METAL FABRICATORS INC. (0.24)
|
Contract # | 10203009 |
| Totals | 38841809.37 | 173474.54 | 29745560.78 | 76.5 |
|
County | TARRANT |
Highway | FM 157 |
From | SH 121 SB FRONTAGE RD/RIO GRANDE BLVD |
To | FM 157/INDUSTRIAL BLVD |
CSJ | 0747-03-082 |
Proj ID | F 2024(056) |
Work Type | INTERSECTION & OPERATIONAL IMPRV |
|
| 0.144 | 2090441.55 | | 2333371.85 | 99.9 |
Work Order | 10-23-23 |
Work Began | 01-29-24 |
Work Completed | |
Time Computed | 11-23-23 |
Contract Working Days | 107 |
Addl Days Granted | 10 |
Working Days Charged | 109 |
Percent Time Used | 93 |
Contractor(s) |
RAGLE CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0747-03-082 KING GEORGE TRAFFIC SOLUTIONS LLC (1.70) DUSTROL, INC. (0.29) FORTSON CONTRACTING, INC. (0.28) REYNOLDS ASPHALT & CONSTRUCTION COMPANY (1.96) DDM MATERIALS, INC. (0.02) ALBATROSS CONSTRUCTION LLC (35.78) A & A CONSTRUCTION COMPANY (0.35) TRAFFIC TECH SOLUTIONS, LLC (14.70) ALLIANCE GEOTECHNICAL GROUP, INC. (0.15) CIVIL TREE SOLUTIONS, LLC (0.06) MILLS UTILITY CONSTRUCTION OF MS, INC. (1.17) USA SWPPP INSPECTIONS, INC.DBA USA EROSION (0.83) STRAIGHT LINE SAWING & SEALING, INC. (0.34)
|
Contract # | 09233221 |
| Totals | 2090441.55 | 183081.87 | 2333371.85 | 99.9 |
|
County | ERATH |
Highway | FM 219 |
From | CR 313 |
To | HAMILTON COUNTY LINE |
CSJ | 0774-01-019 |
Proj ID | C 774-1-19 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| | 8247728.35 | | 10905252.98 | 99.9 |
Work Order | 05-12-22 |
Work Began | 12-01-22 |
Work Completed | |
Time Computed | 06-12-22 |
Contract Working Days | 384 |
Addl Days Granted | 34 |
Working Days Charged | 307 |
Percent Time Used | 73 |
Contractor(s) |
JAY MILLS CONTRACTING, INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 0774-01-019 STRIPE-A-ZONE, LLC (0.00) MARCOM"S MOWING SERVICE, LLC (0.00) WEST TEXAS ROCK RESOURCES, LLC (0.00) TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.00) NORTHEASTERN PAVERS, LLC (0.00)
|
Contract # | 04223203 |
| Totals | 8247728.35 | 32900.65 | 10905252.98 | 99.9 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | DISTRICTWIDE FY 20 |
CSJ | 0902-00-167 |
Proj ID | STP 2020(582) |
Work Type | TRAFFIC CONTROL DEVICES |
|
| 0.100 | 4660000.00 | | 2100881.38 | 45.0 |
Work Order | 03-10-20 |
Work Began | 06-06-22 |
Work Completed | |
Time Computed | 06-09-20 |
Contract Working Days | 600 |
Addl Days Granted | 0 |
Working Days Charged | 433 |
Percent Time Used | 72 |
Contractor(s) |
DURABLE SPECIALTIES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-167 ROAD MASTER STRIPING, LLC (1.84) JR WEST TEXAS CONCRETE LLC (5.85) BUYERS BARRICADES, INC. (0.57)
|
Contract # | 02203205 |
| Totals | 4660000.00 | 198563.40 | 2100881.38 | 45.0 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | DISTRICTWIDE FY 21 |
CSJ | 0902-00-277 |
Proj ID | C 902-00-277 |
Work Type | TRAFFIC CONTROL DEVICES |
|
| 0.100 | 3997191.95 | | 916409.32 | 22.9 |
Work Order | 08-18-21 |
Work Began | 09-20-22 |
Work Completed | |
Time Computed | 11-16-21 |
Contract Working Days | 600 |
Addl Days Granted | 0 |
Working Days Charged | 320 |
Percent Time Used | 53 |
Contractor(s) |
AMERICAN LIGHTING AND SIGNALIZATION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-277 HIGHWAY TRAFFIC CONTROL & SERVICES, LLC (0.12) LINEAR TRAFFIC MARKINGS LLC (0.21) MEDELLIN HDD LLC (0.03)
|
Contract # | 07213213 |
| Totals | 3997191.95 | 0.00 | 916409.32 | 22.9 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | DISTRICTWIDE FY 2022 |
CSJ | 0902-00-288 |
Proj ID | C 902-00-288 |
Work Type | TRAFFIC CONTROL DEVICES |
|
| | 2520015.00 | | 1663764.73 | 66.0 |
Work Order | 07-27-22 |
Work Began | 10-17-22 |
Work Completed | |
Time Computed | 10-17-22 |
Contract Working Days | 400 |
Addl Days Granted | 0 |
Working Days Charged | 261 |
Percent Time Used | 65 |
Contractor(s) |
DURABLE SPECIALTIES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-288 ROAD MASTER STRIPING, LLC (0.78) BUYERS BARRICADES, INC. (0.12)
|
Contract # | 06223624 |
| Totals | 2520015.00 | 15279.00 | 1663764.73 | 66.0 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | DISTRICTWIDE FY 2023 |
CSJ | 0902-00-289 |
Proj ID | C 902-00-289 |
Work Type | TRAFFIC CONTROL DEVICES |
|
| | 2025080.20 | | 598313.87 | 29.5 |
Work Order | 08-09-23 |
Work Began | 05-13-24 |
Work Completed | |
Time Computed | 09-09-23 |
Contract Working Days | 400 |
Addl Days Granted | 0 |
Working Days Charged | 84 |
Percent Time Used | 21 |
Contractor(s) |
YUNEX LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-289 JC DIRECTIONAL DRILLING (1.08) FC TRAFFIC CONTROL, INC. (0.22) FC TRAFFIC CONTROL, INC. (0.15)
|
Contract # | 06233625 |
| Totals | 2025080.20 | 10746.80 | 598313.87 | 29.5 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | DISTRICTWIDE FY 2024 |
CSJ | 0902-00-290 |
Proj ID | C 902-00-290 |
Work Type | TRAFFIC CONTROL DEVICES |
|
| | 2140061.40 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 08-22-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 11-20-24 |
Contract Working Days | 400 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
YUNEX LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-290 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 07243227 |
| Totals | 2140061.40 | 0.00 | 0.00 | 0.0 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | DISTRICT WIDE |
CSJ | 0902-00-291 |
Proj ID | C 902-00-291 |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 1568135.00 | | 1239150.21 | 79.0 |
Work Order | 07-11-22 |
Work Began | 01-03-23 |
Work Completed | |
Time Computed | 10-10-22 |
Contract Working Days | 300 |
Addl Days Granted | 60 |
Working Days Charged | 300 |
Percent Time Used | 83 |
Contractor(s) |
VACA UNDERGROUND UTILITIES INC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-291 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06223231 |
| Totals | 1568135.00 | 0.00 | 1239150.21 | 79.0 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | DISTRICT WIDE |
CSJ | 0902-00-292 |
Proj ID | F 2B23(138) |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 1572975.77 | | 603783.75 | 38.3 |
Work Order | 09-06-23 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 12-06-23 |
Contract Working Days | 300 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-292 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08233035 |
| Totals | 1572975.77 | 0.00 | 603783.75 | 38.3 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | DISTRICT WIDE |
CSJ | 0902-00-293 |
Proj ID | C 902-00-293 |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 1888888.87 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-26-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 10-27-24 |
Contract Working Days | 300 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-293 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08243241 |
| Totals | 1888888.87 | 0.00 | 0.00 | 0.0 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | DISTRICTWIDE |
CSJ | 0902-00-313 |
Proj ID | C 902-00-313 |
Work Type | TRAFFIC CONTROL DEVICES |
|
| | 710744.43 | | 189545.10 | 26.6 |
Work Order | 07-11-22 |
Work Began | 09-05-24 |
Work Completed | |
Time Computed | 10-10-22 |
Contract Working Days | 300 |
Addl Days Granted | 0 |
Working Days Charged | 36 |
Percent Time Used | 12 |
Contractor(s) |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-313 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06223034 |
| Totals | 710744.43 | 134923.88 | 189545.10 | 26.6 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | DISTRICT WIDE |
CSJ | 0902-00-355 |
Proj ID | C 902-00-355 |
Work Type | BRIDGE MAINTENANCE |
|
| | 7867581.55 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 10-02-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 11-02-24 |
Contract Working Days | 320 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
RAGLE CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-355 SOUTHERN CROSS CONTRACTORS, LLC (0.15) STOIC CIVIL CONSTRUCTION, INC. (2.26)
|
Contract # | 05243211 |
| Totals | 7867581.55 | 0.00 | 0.00 | 0.0 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | VARIOUS LOCATIONS |
CSJ | 0902-00-362 |
Proj ID | C 902-00-362 |
Work Type | BRIDGE MAINTENANCE |
|
| | 5157489.52 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 299 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
SCOTT TUCKER CONSTRUCTION COMPANY, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-362 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 11243210 |
| Totals | 5157489.52 | 0.00 | 0.00 | 0.0 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | DISTRICT WIDE |
CSJ | 0902-00-369 |
Proj ID | F 2B24(230) |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 6866259.35 | | 1110925.16 | 16.1 |
Work Order | 08-22-24 |
Work Began | 10-14-24 |
Work Completed | |
Time Computed | 09-22-24 |
Contract Working Days | 139 |
Addl Days Granted | 0 |
Working Days Charged | 10 |
Percent Time Used | 7 |
Contractor(s) |
TRP INFRASTRUCTURE SERVICES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-369 TRAFFIC HIGHWAY MAINTENANCE, LLC (43.65)
|
Contract # | 07243210 |
| Totals | 6866259.35 | 1110925.16 | 1110925.16 | 16.1 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | DISTRICT WIDE |
CSJ | 0902-00-373 |
Proj ID | C 902-00-373 |
Work Type | TRAFFIC CONTROL DEVICES |
|
| | 944350.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 08-14-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 11-12-24 |
Contract Working Days | 300 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
SYNERGY SIGNS & SERVICES LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-373 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 07243022 |
| Totals | 944350.00 | 0.00 | 0.00 | 0.0 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | WITHIN THE FORT WORTH DISTRICT |
CSJ | 0902-00-374 |
Proj ID | F 2B24(275) |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| | 4322950.00 | | 316155.91 | 7.3 |
Work Order | 08-14-24 |
Work Began | 09-08-24 |
Work Completed | |
Time Computed | 09-14-24 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 48 |
Percent Time Used | 13 |
Contractor(s) |
O. TREVINO CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-374 NORTEX CONCRETE LIFT & STABILIZATION, INC. (1.90) ACT SAW CUTTING & REMOVAL (4.99) BRENDA PRICE TRUCKING, INC. (3.78)
|
Contract # | 07243217 |
| Totals | 4322950.00 | 168826.44 | 316155.91 | 7.3 |
|
County | TARRANT |
Highway | VA |
From | NORTH TARRANT COUNTY |
To | . |
CSJ | 0902-00-378 |
Proj ID | C 902-00-378 |
Work Type | BRIDGE MAINTENANCE |
|
| | 3575245.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 11-07-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 277 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-378 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09243222 |
| Totals | 3575245.00 | 0.00 | 0.00 | 0.0 |
|
County | PARKER |
Highway | CS |
From | ON BAILEY RANCH FROM HS |
To | FM 1187 |
CSJ | 0902-38-145 |
Proj ID | STP 2023(142)TAPS |
Work Type | PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
| | 523283.00 | | 43800.00 | 8.3 |
Work Order | 09-06-24 |
Work Began | 10-14-24 |
Work Completed | |
Time Computed | 10-07-24 |
Contract Working Days | 86 |
Addl Days Granted | 0 |
Working Days Charged | 15 |
Percent Time Used | 17 |
Contractor(s) |
GARRET SHIELDS INFRASTRUCTURE |
SUBCONTRACTOR(S) FOR CCSJ: 0902-38-145 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08243037 |
| Totals | 523283.00 | 43800.00 | 43800.00 | 8.3 |
|