100 6001 | PREPARING ROW | AC | 5.270 | 5,050.00000 | 1 | ||
100 6002 | PREPARING ROW | STA | 362.000 | 885.00000 | 1,885.900 | 1,476.00350 | 22 |
104 6001 | REMOVING CONC (PAV) | SY | 329.000 | 94.89362 | 3 | ||
104 6009 | REMOVING CONC (RIPRAP) | SY | 4.000 | 18.90000 | 308.000 | 21.11558 | 5 |
104 6017 | REMOVING CONC (DRIVEWAYS) | SY | 2,531.000 | 20.05927 | 3 | ||
104 6028 | REMOVING CONC (MISC) | SY | 298.000 | 90.87248 | 2 | ||
104 6029 | REMOVING CONC (CURB OR CURB & GUTTER) | LF | 46.000 | 96.98000 | 1 | ||
104 6036 | REMOVING CONC (SIDEWALK OR RAMP) | SY | 15.000 | 1,000.00000 | 1 | ||
105 6011 | REMOVING STAB BASE AND ASPH PAV (2"-6" | SY | 339.000 | 5.55000 | 1 | ||
105 6033 | REMOVING STB BASE AND ASPH PAV(10-14") | SY | 18,759.000 | 11.00000 | 1 | ||
105 6037 | REMOVING STAB BASE AND ASPH PAV(0"-16" | SY | 548.000 | 50.00000 | 1 | ||
105 6058 | REMOVING STAB BASE & ASPH PAV (10"-12" | SY | 8,914.000 | 7.00000 | 1 | ||
105 6069 | REMOVING STAB BASE & ASPH PAV (4" - 6" | SY | 365.000 | 11.00000 | 1 | ||
110 6001 | EXCAVATION (ROADWAY) | CY | 54,719.000 | 10.61770 | 17 | ||
110 6003 | EXCAVATION (SPECIAL) | CY | 3,091.000 | 24.16888 | 2 | ||
112 6001 | SUBGRADE WIDENING (ORD COMP) | STA | 362.000 | 195.62000 | 786.190 | 224.11598 | 3 |
132 6003 | EMBANKMENT (FINAL)(ORD COMP)(TY B) | CY | 22,548.000 | 15.22304 | 14 | ||
132 6004 | EMBANKMENT (FINAL)(DENS CONT)(TY B) | CY | 3,810.000 | 9.23000 | 1 | ||
132 6006 | EMBANKMENT (FINAL)(DENS CONT)(TY C) | CY | 40,067.000 | 9.78048 | 2 | ||
132 6019 | EMBANKMENT (VEHICLE)(ORD COMP)(TY B) | CY | 18,975.000 | 11.27000 | 33,129.000 | 16.63519 | 11 |
134 6002 | BACKFILL (TY B) | STA | 1,493.630 | 152.48161 | 6 | ||
150 6001 | BLADING | STA | 362.000 | 45.00000 | 362.000 | 45.00000 | 1 |
150 6002 | BLADING | HR | 60.000 | 65.00000 | 1 | ||
158 6003 | SPEC EXCAV WORK (HYD EXCAVATOR) | HR | 19.000 | 123.92000 | 439.000 | 89.62979 | 11 |
160 6003 | FURNISHING AND PLACING TOPSOIL (4") | SY | 32,570.000 | 3.65086 | 14 | ||
161 6017 | COMPOST MANUF TOPSOIL (4") | SY | 65,901.000 | 2.00000 | 2 | ||
162 6002 | BLOCK SODDING | SY | 3,280.000 | 3.78000 | 70,256.000 | 4.38499 | 12 |
164 6001 | BROADCAST SEED (PERM) (RURAL) (SANDY) | SY | 416.000 | .75000 | 1 | ||
164 6009 | BROADCAST SEED (TEMP) (WARM) | SY | 39,039.000 | .10000 | 314,054.000 | .18561 | 21 |
164 6011 | BROADCAST SEED (TEMP) (COOL) | SY | 39,039.000 | .10000 | 288,657.000 | .15613 | 17 |
164 6021 | CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) | SY | 78,078.000 | .25000 | 553,932.000 | .40812 | 30 |
164 6023 | CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) | SY | 57,402.000 | .39319 | 2 | ||
164 6029 | CELL FBR MLCH SEED(TEMP)(WARM) | SY | 38,540.000 | .41805 | 10 | ||
164 6031 | CELL FBR MLCH SEED(TEMP)(COOL) | SY | 34,983.000 | .35787 | 9 | ||
168 6001 | VEGETATIVE WATERING | MG | 1,596.400 | .01000 | 12,331.540 | 12.19069 | 34 |
169 6002 | SOIL RETENTION BLANKETS (CL 1) (TY B) | SY | 8,848.000 | 1.25000 | 62,107.000 | 1.72807 | 19 |
169 6003 | SOIL RETENTION BLANKETS (CL 1) (TY C) | SY | 12,086.000 | 2.91280 | 2 | ||
169 6004 | SOIL RETENTION BLANKETS (CL 1) (TY D) | SY | 4,371.000 | 3.65710 | 5 | ||
169 6006 | SOIL RETENTION BLANKETS (CL 2) (TY F) | SY | 3,557.000 | 1.50000 | 1 | ||
192 6001 | PLANT MATERIAL (4" CNTR) | EA | 508.000 | 4.00000 | 1 | ||
192 6014 | PLANT SOIL MIX | CY | 5.000 | 100.00000 | 1 |