| Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
| County | WEBB |
| Highway | US0083 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6183-29-001 |
| Proj ID | RMC - 618329001 |
| Work Type | INSTALL TRAFFIC SIGNALS, FLASHING BEACON |
| |
| 0.001 | 245601.35 | | 276457.38 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 09-11-09 |
| Work Began | 09-21-09 |
| Work Completed | |
| Time Computed | 09-21-09 |
| Contract Working Days | 365 |
| Addl Days Granted | 0 |
| Working Days Charged | 365 |
| Percent Time Used | 100 |
| Contractor(s) |
| STAR OPERATIONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6183-29-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 07092201 |
| Totals | 245601.35 | 0.00 | 276457.38 | 99.9 |
|
| County | WEBB |
| Highway | US0083 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6210-68-001 |
| Proj ID | RMC - 621068001 |
| Work Type | INSTALL TRAF SIG, FLASHING BEACONS, PVT. |
| |
| 0.001 | 236431.55 | | 356107.46 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 08-24-10 |
| Work Began | 08-24-10 |
| Work Completed | |
| Time Computed | 08-24-10 |
| Contract Working Days | 365 |
| Addl Days Granted | 99 |
| Working Days Charged | 464 |
| Percent Time Used | 100 |
| Contractor(s) |
| STAR OPERATIONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6210-68-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 07102202 |
| Totals | 236431.55 | 0.00 | 356107.46 | 99.9 |
|
| County | WEBB |
| Highway | IH0035 |
| From | IH 35 |
| To | IH 35 |
| CSJ | 6221-66-001 |
| Proj ID | SUP - 622166001 |
| Work Type | JANITORIAL/LANDSCAPING/LITTER PICKUP |
| |
| 0.001 | 251677.07 | | 235015.95 | 93.3 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 01-03-11 |
| Work Began | 01-03-11 |
| Work Completed | |
| Time Computed | 01-03-11 |
| Contract Working Days | 731 |
| Addl Days Granted | 0 |
| Working Days Charged | 729 |
| Percent Time Used | 99 |
| Contractor(s) |
TIBH INDUSTRIES, INC. E.Q.U.I.P. ENTERPRISES |
SUBCONTRACTOR(S) FOR CCSJ: 6221-66-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 12102231 |
| Totals | 251677.07 | 0.00 | 235015.95 | 93.3 |
|
| County | VAL VERDE |
| Highway | US0277 |
| From | 5.00 MI N OF US 90 |
| To | 5.37 MI N OF US 90 |
| CSJ | 6235-72-001 |
| Proj ID | RMC - 623572001 |
| Work Type | REHABILITATION OF A BRIDGE FACILITY |
| |
| 0.371 | 174640.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 22 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| WESTCHESTER FIRE INSURANCE COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6235-72-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 06122202 |
| Totals | 174640.00 | 0.00 | 0.00 | 0.0 |
|
| County | VAL VERDE |
| Highway | US0090 |
| From | US 90 |
| To | US 90 |
| CSJ | 6256-00-001 |
| Proj ID | SUP - 625600001 |
| Work Type | JANITORIAL/GROUNDS/LANDSCAPING MAINTENAN |
| |
| 0.001 | 56598.48 | | 51018.80 | 90.1 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 04-01-13 |
| Work Began | 04-01-13 |
| Work Completed | |
| Time Computed | 04-01-13 |
| Contract Working Days | 365 |
| Addl Days Granted | 0 |
| Working Days Charged | 365 |
| Percent Time Used | 100 |
| Contractor(s) |
TIBH INDUSTRIES, INC. E.Q.U.I.P. ENTERPRISES |
SUBCONTRACTOR(S) FOR CCSJ: 6256-00-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02132231 |
| Totals | 56598.48 | 0.00 | 51018.80 | 90.1 |
|
| County | WEBB |
| Highway | IH0035 |
| From | VARIOUS |
| To | . |
| CSJ | 6269-76-001 |
| Proj ID | SUP - 626976001 |
| Work Type | JANITORIAL AND GROUNDS MAINTENANCE |
| |
| 0.001 | 80486.56 | | 77762.16 | 96.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 02-01-14 |
| Work Began | 02-01-14 |
| Work Completed | |
| Time Computed | 02-01-14 |
| Contract Working Days | 365 |
| Addl Days Granted | 0 |
| Working Days Charged | 212 |
| Percent Time Used | 58 |
| Contractor(s) |
TIBH INDUSTRIES, INC. E.Q.U.I.P. ENTERPRISES |
SUBCONTRACTOR(S) FOR CCSJ: 6269-76-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 01142231 |
| Totals | 80486.56 | 0.00 | 77762.16 | 96.6 |
|
| County | DIMMIT |
| Highway | US0083 |
| From | US 83 |
| To | VARIOUS |
| CSJ | 6368-63-001 |
| Proj ID | RMC - 636863001 |
| Work Type | MOWING OF HIGHWAYS RIGHT OF WAY |
| |
| 250.000 | 264327.04 | | 528770.07 | 99.9 |
| Work Order | 12-09-20 |
| Work Began | 11-18-20 |
| Work Completed | |
| Time Computed | 12-14-20 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,418 |
| Percent Time Used | 97 |
| Contractor(s) |
| R&M INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6368-63-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 10202204 |
| Totals | 264327.04 | 0.00 | 528770.07 | 99.9 |
|
| County | MAVERICK |
| Highway | US0277 |
| From | US277 |
| To | . |
| CSJ | 6371-48-001 |
| Proj ID | SUP - 637148001 |
| Work Type | JANITORIAL SERVICES EAGLE PASS OFFICE |
| |
| 9.000 | 23397.40 | | 43979.47 | 99.9 |
| Work Order | 01-27-21 |
| Work Began | 02-01-21 |
| Work Completed | |
| Time Computed | 02-01-21 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,369 |
| Percent Time Used | 93 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6371-48-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 11202239 |
| Totals | 23397.40 | 835.82 | 43979.47 | 99.9 |
|
| County | DUVAL |
| Highway | SH0016 |
| From | FREER |
| To | VARIOUS |
| CSJ | 6371-49-001 |
| Proj ID | SUP - 637149001 |
| Work Type | JANITORIAL SERVICES FREER OFFICE |
| |
| 10.000 | 23397.40 | | 41825.69 | 99.9 |
| Work Order | 12-28-20 |
| Work Began | 01-01-21 |
| Work Completed | |
| Time Computed | 01-01-21 |
| Contract Working Days | 730 |
| Addl Days Granted | 762 |
| Working Days Charged | 1,400 |
| Percent Time Used | 93 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6371-49-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 11202235 |
| Totals | 23397.40 | 860.89 | 41825.69 | 99.9 |
|
| County | KINNEY |
| Highway | US0090 |
| From | KINNEY |
| To | VARIOUS |
| CSJ | 6371-51-001 |
| Proj ID | SUP - 637151001 |
| Work Type | PICNIC AREA MAINTENANCE |
| |
| 100.000 | 81641.20 | | 134197.67 | 99.9 |
| Work Order | 02-01-21 |
| Work Began | 02-01-21 |
| Work Completed | |
| Time Computed | 02-01-21 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,365 |
| Percent Time Used | 93 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6371-51-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 11202234 |
| Totals | 81641.20 | 2292.44 | 134197.67 | 99.9 |
|
| County | WEBB |
| Highway | IH0035 |
| From | IH 35 |
| To | VARIOUS |
| CSJ | 6371-52-001 |
| Proj ID | SUP - 637152001 |
| Work Type | PICNIC AREA MAINTENANCE WEBB COUNTY |
| |
| 200.000 | 42077.36 | | 147378.65 | 99.9 |
| Work Order | 10-15-20 |
| Work Began | 10-15-20 |
| Work Completed | |
| Time Computed | 10-15-20 |
| Contract Working Days | 730 |
| Addl Days Granted | 1,095 |
| Working Days Charged | 1,478 |
| Percent Time Used | 80 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6371-52-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 09202231 |
| Totals | 42077.36 | 3868.55 | 147378.65 | 99.9 |
|
| County | VAL VERDE |
| Highway | US0277 |
| From | VAL VERDE |
| To | VARIOUS |
| CSJ | 6371-53-001 |
| Proj ID | SUP - 637153001 |
| Work Type | PICNIC AREA MAINTENANCE |
| |
| 100.000 | 79460.54 | | 136063.96 | 99.9 |
| Work Order | 02-01-21 |
| Work Began | 02-01-21 |
| Work Completed | |
| Time Computed | 02-01-21 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,367 |
| Percent Time Used | 93 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6371-53-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 12202233 |
| Totals | 79460.54 | 2319.68 | 136063.96 | 99.9 |
|
| County | VAL VERDE |
| Highway | US0090 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6378-09-001 |
| Proj ID | SUP - 637809001 |
| Work Type | JANITORIAL MAINTENANCE |
| |
| 0.010 | 57865.96 | | 95762.30 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 03-01-21 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,341 |
| Percent Time Used | 91 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6378-09-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 02212232 |
| Totals | 57865.96 | 2039.19 | 95762.30 | 99.9 |
|
| County | KINNEY |
| Highway | US0090 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6378-10-001 |
| Proj ID | SUP - 637810001 |
| Work Type | JANITORIAL MAINTENANCE |
| |
| 0.010 | 18623.56 | | 30524.46 | 99.9 |
| Work Order | 03-01-21 |
| Work Began | 03-01-21 |
| Work Completed | |
| Time Computed | 03-01-21 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,338 |
| Percent Time Used | 91 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6378-10-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 02212240 |
| Totals | 18623.56 | 669.50 | 30524.46 | 99.9 |
|
| County | LASALLE |
| Highway | IH0035 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6378-12-001 |
| Proj ID | SUP - 637812001 |
| Work Type | JANITORIAL MAINTENANCE |
| |
| 0.010 | 18009.00 | | 30556.90 | 99.9 |
| Work Order | 03-01-21 |
| Work Began | 03-01-21 |
| Work Completed | |
| Time Computed | 03-01-21 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,341 |
| Percent Time Used | 91 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6378-12-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 02212236 |
| Totals | 18009.00 | 1305.01 | 30556.90 | 99.9 |
|
| County | ZAVALA |
| Highway | US0057 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6378-17-001 |
| Proj ID | SUP - 637817001 |
| Work Type | JANITORIAL MAINTENANCE |
| |
| 0.010 | 25867.68 | | 42932.81 | 99.9 |
| Work Order | 03-01-21 |
| Work Began | 03-01-21 |
| Work Completed | |
| Time Computed | 03-01-21 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,343 |
| Percent Time Used | 91 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6378-17-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 02212237 |
| Totals | 25867.68 | 936.43 | 42932.81 | 99.9 |
|
| County | DIMMIT |
| Highway | US0083 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6378-19-001 |
| Proj ID | SUP - 637819001 |
| Work Type | JANITORIAL MAINTENANCE |
| |
| 0.010 | 25034.32 | | 43331.25 | 99.9 |
| Work Order | 04-01-21 |
| Work Began | 04-01-21 |
| Work Completed | |
| Time Computed | 04-01-21 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,310 |
| Percent Time Used | 89 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6378-19-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 03212238 |
| Totals | 25034.32 | 1899.44 | 43331.25 | 99.9 |
|
| County | DUVAL |
| Highway | SH0044 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6381-36-001 |
| Proj ID | MMC - 638136001 |
| Work Type | AGGREGATE |
| |
| 0.010 | 182720.00 | | 209317.64 | 99.9 |
| Work Order | 05-01-23 |
| Work Began | 05-01-23 |
| Work Completed | |
| Time Computed | 05-01-23 |
| Contract Working Days | 182 |
| Addl Days Granted | 364 |
| Working Days Charged | 546 |
| Percent Time Used | 100 |
| Contractor(s) |
| VULCAN CONSTRUCTION MATERIALS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6381-36-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 03232201 |
| Totals | 182720.00 | 82152.74 | 209317.64 | 99.9 |
|
| County | WEBB |
| Highway | SL0020 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6381-62-001 |
| Proj ID | SUP - 638162001 |
| Work Type | JANITORIAL MAINTENANCE |
| |
| 0.010 | 253499.70 | | 273727.05 | 99.9 |
| Work Order | 05-01-21 |
| Work Began | 05-01-21 |
| Work Completed | |
| Time Computed | 05-01-21 |
| Contract Working Days | 1,095 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,280 |
| Percent Time Used | 70 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6381-62-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 04212231 |
| Totals | 253499.70 | 7138.56 | 273727.05 | 99.9 |
|
| County | MAVERICK |
| Highway | BU0277N |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6384-16-001 |
| Proj ID | SUP - 638416001 |
| Work Type | PICNIC AREA MAINTENANCE |
| |
| 0.010 | 67502.20 | | 104203.56 | 99.9 |
| Work Order | 06-25-21 |
| Work Began | 07-01-21 |
| Work Completed | |
| Time Computed | 07-01-21 |
| Contract Working Days | 365 |
| Addl Days Granted | 1,095 |
| Working Days Charged | 1,219 |
| Percent Time Used | 83 |
| Contractor(s) |
WORKQUEST WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6384-16-001 WORLD TECHNICAL SERVICES, INC. (0.00)
|
| Contract # | 06212231 |
| Totals | 67502.20 | 3027.50 | 104203.56 | 99.9 |
|