Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | HIDALGO |
Highway | FM 676 |
From | TAYLOR RD. |
To | FM 2220 |
CSJ | 1064-01-043 |
Proj ID | STP 2024(158)MM |
Work Type | WIDEN NON-FREEWAY |
|
| | 10832564.50 | | 712564.43 | 6.5 |
County | HIDALGO |
Highway | FM 676 |
From | @ EDINBURG MAIN CANAL STR#: K00011001 |
To | . |
CSJ | 1064-01-046 |
Proj ID | BR 2024(076) |
Work Type | BRIDGE REPLACEMENT |
|
| 0.100 | 979047.00 | | 748390.25 | 76.4 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 04-18-24 |
Work Began | 07-11-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 472 |
Addl Days Granted | 21 |
Working Days Charged | 79 |
Percent Time Used | 16 |
Contractor(s) |
TEXAS CORDIA CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1064-01-043 HIGHWAY BARRICADES AND SERVICES, LLC (1.11) D&G ENERGY CORPORATION (6.57) RIO GRANDE REBAR RODBUSTERS, LLC. (0.15) DUSTROL, INC. (0.32) SOIL TECH ADVANCE INC. (0.61) CERTIFIED PLACERS LLC (0.11)
|
Contract # | 03243205 |
| Totals | 11811611.50 | 389377.01 | 1460954.68 | 12.3 |
|
County | CAMERON |
Highway | FM 1846 |
From | SAN JOSE RANCH ROAD |
To | BUS 77 |
CSJ | 1065-02-039 |
Proj ID | F 2022(108) |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| | 3889216.02 | | 3983765.17 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 12-16-21 |
Work Began | 02-18-22 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 206 |
Addl Days Granted | 25 |
Working Days Charged | 235 |
Percent Time Used | 101 |
Contractor(s) |
TEXAS CORDIA CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1065-02-039 HIGHWAY BARRICADES AND SERVICES, LLC (2.42) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (3.83) SOIL TECH ADVANCE INC. (0.72) DUSTROL, INC. (1.70) GUERRA CONSTRUCTION COMPANY (0.61)
|
Contract # | 11213211 |
| Totals | 3889216.02 | 1205.00 | 3983765.17 | 99.9 |
|
County | STARR |
Highway | FM 755 |
From | FM 1017 |
To | FM 2294 |
CSJ | 1103-04-039 |
Proj ID | C 1103-4-39 |
Work Type | SUPER-2 HIGHWAY |
|
| | 24639662.30 | | 1906200.00 | 7.7 |
Work Order | 08-22-24 |
Work Began | 10-03-24 |
Work Completed | |
Time Computed | 10-03-24 |
Contract Working Days | 520 |
Addl Days Granted | 0 |
Working Days Charged | 18 |
Percent Time Used | 3 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1103-04-039 DEPENDABLE FENCE (5.76) HIGHWAY BARRICADES AND SERVICES, LLC (3.01) SOIL TECH ADVANCE INC. (1.09) TEXAS HIGHWAY SYSTEMS, INC. (0.67)
|
Contract # | 07243203 |
| Totals | 24639662.30 | 1906200.00 | 1906200.00 | 7.7 |
|
County | CAMERON ETC |
Highway | FM 801 ETC |
From | IH 69E |
To | FM 800 |
CSJ | 1137-01-031 |
Proj ID | C 1137-1-31 |
Work Type | SEAL COAT |
|
| 11.381 | 6481370.35 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 10-28-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 100 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
CK NEWBERRY, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1137-01-031 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09243217 |
| Totals | 6481370.35 | 0.00 | 0.00 | 0.0 |
|
County | CAMERON |
Highway | FM 802 |
From | FM 1847 |
To | OLD PORT ISABEL RD. |
CSJ | 1140-02-038 |
Proj ID | NH 2B20(157) |
Work Type | WIDEN NON-FREEWAY |
|
| | 6262978.18 | | 7031757.57 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-18-20 |
Work Began | 01-04-21 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 230 |
Addl Days Granted | 91 |
Working Days Charged | 334 |
Percent Time Used | 104 |
Contractor(s) |
TEXAS CORDIA CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1140-02-038 HIGHWAY BARRICADES AND SERVICES, LLC (1.58) GREGORY PILE DRIVING, INC. (0.89) DUSTROL, INC. (0.70) TRAF-TEX, INC. (4.77) EXTERIOR DESIGNS (1.30) PURLITO, INC. (0.35) G & E ESCOBEDO CONSTRUCTION, INC. (0.00) MUNOZ FOUNDATION DRILLING, INC. (0.25) HOUSTON SAWING & DRILLING (0.05) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (0.82)
|
Contract # | 08203218 |
| Totals | 6262978.18 | 1637.54 | 7031757.57 | 99.9 |
|
County | HIDALGO |
Highway | FM 1015 |
From | MILE 9 |
To | IH-2 |
CSJ | 1228-03-050 |
Proj ID | C 1228-3-50 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| | 8435308.85 | | 2931874.12 | 34.7 |
Work Order | 10-23-23 |
Work Began | 01-08-24 |
Work Completed | |
Time Computed | 12-01-23 |
Contract Working Days | 294 |
Addl Days Granted | 0 |
Working Days Charged | 160 |
Percent Time Used | 54 |
Contractor(s) |
REIM CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1228-03-050 HIGHWAY BARRICADES AND SERVICES, LLC (2.62) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (4.99) TEXAS ICON CONSTRUCTION, LLC (0.15) G & E ESCOBEDO CONSTRUCTION, INC. (0.00)
|
Contract # | 09233005 |
| Totals | 8435308.85 | 467934.32 | 2931874.12 | 34.7 |
|
County | HIDALGO |
Highway | FM 1015 |
From | IH-2 |
To | 2.584 MILES SOUTH OF IH-2 |
CSJ | 1228-03-051 |
Proj ID | C 1228-3-51 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| | 11217266.06 | | 4677879.47 | 41.7 |
Work Order | 11-01-23 |
Work Began | 01-10-24 |
Work Completed | |
Time Computed | 12-01-23 |
Contract Working Days | 410 |
Addl Days Granted | 0 |
Working Days Charged | 199 |
Percent Time Used | 48 |
Contractor(s) |
TEXAS CORDIA CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1228-03-051 SOIL TECH ADVANCE INC. (0.15) HIGHWAY BARRICADES AND SERVICES, LLC (2.28) EXTERIOR DESIGNS (0.46) TOP NOTCH CONSTRUCTION (0.00) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (4.47) DUSTROL, INC. (2.96) DEPENDABLE FENCE (0.56) G & E ESCOBEDO CONSTRUCTION, INC. (0.00)
|
Contract # | 09233211 |
| Totals | 11217266.06 | 375736.10 | 4677879.47 | 41.7 |
|
County | HIDALGO |
Highway | FM 1015 |
From | US 281 |
To | PROGRESO BRIDGE |
CSJ | 1228-04-015 |
Proj ID | C 1228-4-15 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| | 20273402.95 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 10-23-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 410 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
IOC COMPANY LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1228-04-015 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09243007 |
| Totals | 20273402.95 | 0.00 | 0.00 | 0.0 |
|
County | WILLACY |
Highway | FM 1018 |
From | IH-69E NB FRONTAGE RD. |
To | FM 1420 |
CSJ | 1236-01-015 |
Proj ID | F 2021(843) |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 12.375 | 12441758.70 | | 12090239.27 | 97.1 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-16-21 |
Work Began | 11-08-21 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 379 |
Addl Days Granted | 55 |
Working Days Charged | 434 |
Percent Time Used | 100 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1236-01-015 GP7 CONSTRUCTION INC. (6.65) HIGHWAY BARRICADES AND SERVICES, LLC (3.08) SOIL TECH ADVANCE INC. (4.30)
|
Contract # | 08213009 |
| Totals | 12441758.70 | 14740.00 | 12090239.27 | 97.1 |
|
County | HIDALGO |
Highway | FM 1425 |
From | MILE 12 N. RD. |
To | IH-2 |
CSJ | 1428-01-027 |
Proj ID | F 2B23(005) |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 7.500 | 8656176.69 | | 2116569.10 | 24.4 |
County | HIDALGO |
Highway | FM 1425 |
From | IH-2 |
To | BUS 83 |
CSJ | 1428-01-028 |
Proj ID | F 2B23(005) |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| | 683724.68 | | 0.00 | 0.0 |
County | HIDALGO |
Highway | FM 1425 |
From | SH 107 |
To | MILE 12 N. RD. |
CSJ | 1428-01-033 |
Proj ID | STP 2B23(002)VRU |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 3917294.76 | | 3489834.84 | 89.0 |
Work Order | 08-07-23 |
Work Began | 09-12-23 |
Work Completed | |
Time Computed | 09-11-23 |
Contract Working Days | 487 |
Addl Days Granted | 14 |
Working Days Charged | 239 |
Percent Time Used | 47 |
Contractor(s) |
ASAGO, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1428-01-027 TEXAS ICON CONSTRUCTION, LLC (2.44) HIGHWAY BARRICADES AND SERVICES, LLC (3.33)
|
Contract # | 06233413 |
| Totals | 13257196.13 | 212904.92 | 5606403.94 | 42.2 |
|
County | WILLACY |
Highway | FM 490 |
From | 0.74 MI E OF FM 1015 |
To | @ WILLACY CO. MAIN CANAL |
CSJ | 1430-01-025 |
Proj ID | BR 2B23(009) |
Work Type | BRIDGE REPLACEMENT |
|
| | 929232.95 | | 957772.06 | 99.9 |
County | WILLACY |
Highway | FM 490 |
From | 0.70 MI E OF FM 1015 |
To | @ DELTA LAKE DRAIN |
CSJ | 1430-01-026 |
Proj ID | BR 2B23(009) |
Work Type | BRIDGE REPLACEMENT |
|
| | 1044061.45 | | 1000733.78 | 95.8 |
County | WILLACY |
Highway | FM 490 |
From | FM 1015 |
To | FM 1425 |
CSJ | 1430-01-031 |
Proj ID | STP 2B23(003)VRU |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 3.223 | 3970779.90 | | 3750237.31 | 95.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 07-26-23 |
Work Began | 10-31-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 136 |
Addl Days Granted | 0 |
Working Days Charged | 154 |
Percent Time Used | 113 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1430-01-025 TEXAS ICON CONSTRUCTION, LLC (0.86) TEXAS HIGHWAY SYSTEMS, INC. (0.59) SOIL TECH ADVANCE INC. (4.64) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (0.01) HIGHWAY BARRICADES AND SERVICES, LLC (1.31) DEPENDABLE FENCE (3.33) RIO GRANDE REBAR RODBUSTERS, LLC. (0.22) HOUSTON SAWING & DRILLING (0.10)
|
Contract # | 06233611 |
| Totals | 5944074.30 | 105344.05 | 5708743.15 | 96.4 |
|
County | CAMERON |
Highway | SH 4 |
From | IH-69E |
To | SH 48 |
CSJ | 1504-01-037 |
Proj ID | F 2B23(010) |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 1.573 | 20955780.74 | | 6841532.33 | 32.6 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 08-07-23 |
Work Began | 01-08-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 445 |
Addl Days Granted | 11 |
Working Days Charged | 173 |
Percent Time Used | 37 |
Contractor(s) |
POSILLICO CIVIL, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1504-01-037 DUSTROL, INC. (1.82) HIGHWAY BARRICADES AND SERVICES, LLC (1.88) TRAF-TEX, INC. (3.03) CERTIFIED PLACERS LLC (1.54) AMERICAN FENCE (0.04) SOIL TECH ADVANCE INC. (0.03) TEXAS CORDIA CONSTRUCTION, LLC (0.05)
|
Contract # | 06233410 |
| Totals | 20955780.74 | 606362.49 | 6841532.33 | 32.6 |
|
County | HIDALGO ETC |
Highway | FM 907 ETC |
From | 0.1 MILES NORTH OF MILE 17 1/2 N. RD. |
To | 0.1 MILES SOUTH OF MILE 17 1/2 N RD. |
CSJ | 1586-01-089 |
Proj ID | F 2022(934) |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 1313573.10 | | 1235281.12 | 96.6 |
Work Order | 09-20-22 |
Work Began | 03-13-23 |
Work Completed | |
Time Computed | 03-13-23 |
Contract Working Days | 140 |
Addl Days Granted | 50 |
Working Days Charged | 190 |
Percent Time Used | 100 |
Contractor(s) |
D&G ENERGY CORPORATION |
SUBCONTRACTOR(S) FOR CCSJ: 1586-01-089 VALLEY STRIPING CORP. (10.70) R&T CONSTRUCTION (0.80)
|
Contract # | 08223031 |
| Totals | 1313573.10 | 0.00 | 1235281.12 | 96.6 |
|
County | HIDALGO |
Highway | FM 1925 |
From | FM 907 (ALAMO RD) |
To | SHARP RD. |
CSJ | 1803-02-035 |
Proj ID | F 2024(623) |
Work Type | WIDEN NON-FREEWAY |
|
| 1.621 | 8283398.47 | | 2897858.29 | 34.9 |
Work Order | 02-05-24 |
Work Began | 03-06-24 |
Work Completed | |
Time Computed | 03-06-24 |
Contract Working Days | 334 |
Addl Days Granted | 0 |
Working Days Charged | 104 |
Percent Time Used | 31 |
Contractor(s) |
ASAGO, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1803-02-035 HIGHWAY BARRICADES AND SERVICES, LLC (1.79) D&G ENERGY CORPORATION (2.80) IZAGUIRRE CONSTRUCTION LLC (3.49) TEXAS ICON CONSTRUCTION, LLC (0.46)
|
Contract # | 01243209 |
| Totals | 8283398.47 | 237216.67 | 2897858.29 | 34.9 |
|
County | HIDALGO |
Highway | FM 1925 |
From | M RD/GWIN RD |
To | . |
CSJ | 1803-02-049 |
Proj ID | STP 2B23(011)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 0.200 | 346821.94 | | 326543.86 | 94.3 |
Work Order | 08-17-23 |
Work Began | 02-23-24 |
Work Completed | |
Time Computed | 12-15-23 |
Contract Working Days | 143 |
Addl Days Granted | 0 |
Working Days Charged | 144 |
Percent Time Used | 100 |
Contractor(s) |
THE LEVY COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1803-02-049 TEXAS HIGHWAY SYSTEMS, INC. (0.56) HIGHWAY BARRICADES AND SERVICES, LLC (3.11) TEXAS ICON CONSTRUCTION, LLC (3.47)
|
Contract # | 06233644 |
| Totals | 346821.94 | 593.10 | 326543.86 | 94.3 |
|
County | CAMERON |
Highway | FM 2556 |
From | 0.36 MILES NORTH OF ARROYO COLORADO |
To | 0.35 MILES SOUTH OF ARROYO COLORADO |
CSJ | 2529-02-010 |
Proj ID | STP 2B24(212)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 7945428.50 | | 693237.00 | 8.7 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 08-22-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 225 |
Addl Days Granted | 0 |
Working Days Charged | 16 |
Percent Time Used | 7 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 2529-02-010 RIO GRANDE REBAR RODBUSTERS, LLC. (4.12) HIGHWAY BARRICADES AND SERVICES, LLC (0.43) SOIL TECH ADVANCE INC. (1.26) DEPENDABLE FENCE (0.77) TEXAS HIGHWAY SYSTEMS, INC. (0.28)
|
Contract # | 07243006 |
| Totals | 7945428.50 | 693237.00 | 693237.00 | 8.7 |
|
County | CAMERON |
Highway | FM 3069 |
From | FM 510 |
To | FM 2480 |
CSJ | 3093-01-002 |
Proj ID | STP 2022(729)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 3.000 | 5289300.97 | | 5576409.32 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-20-22 |
Work Began | 11-07-22 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 224 |
Addl Days Granted | 26 |
Working Days Charged | 206 |
Percent Time Used | 82 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 3093-01-002 TEXAS ICON CONSTRUCTION, LLC (1.97) HIGHWAY BARRICADES AND SERVICES, LLC (3.58)
|
Contract # | 08223215 |
| Totals | 5289300.97 | 0.00 | 5576409.32 | 99.9 |
|
County | WILLACY |
Highway | FM 1425 |
From | SH 186 |
To | FM 490 |
CSJ | 3343-02-016 |
Proj ID | C 3343-2-16 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| | 3015724.30 | | 987550.40 | 32.7 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 04-18-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 184 |
Addl Days Granted | 0 |
Working Days Charged | 27 |
Percent Time Used | 14 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 3343-02-016 TEXAS ICON CONSTRUCTION, LLC (3.37) TEXAS HIGHWAY SYSTEMS, INC. (0.92) PAVEMENT MARKINGS INC. (1.98) SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. (3.06)
|
Contract # | 03243022 |
| Totals | 3015724.30 | 517059.32 | 987550.40 | 32.7 |
|