AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - SAN ANTONIO DISTRICT

Last Update: Thursday, August 08, 2024
ITEMS 100 6001 TO 193 6009
ItemsItemsBid Code Range
0100 - 0193
0216 - 0276
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0784
3000 - 3014
4021 - 4052
5001 - 5008
6001 - 6186
7023 - 7113
9033 - 9033
100 6001 - 193 6009
Item NoDescriptionUnitsDecember 31, 2016Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
100 6001PREPARING ROWAC  7.27023,961.485562
100 6002PREPARING ROWSTA201.00036,700.000001,967.6906,439.1356811
100 6004PREPARING ROW(TREE)(12" TO 24" DIA)EA  1.0001,000.000001
104 6009REMOVING CONC (RIPRAP)SY172.0006.000009,806.00014.2327511
104 6015REMOVING CONC (SIDEWALKS)SY  657.11013.006505
104 6017REMOVING CONC (DRIVEWAYS)SY  1,475.0009.655322
104 6021REMOVING CONC (CURB)LF  6,795.0007.227796
104 6023REMOVING CONC (CTB)LF  354.00022.000001
104 6025REMOVE CONC (WINGWALL)CY  28.000300.000001
104 6027REMOVING CONC (APPR SLAB)SY  182.000150.000001
104 6037REMOVE CONC (RAIL)LF  1,513.00044.388502
104 6054REMOVING CONCRETE(MOW STRIP)LF250.00020.00000250.00020.000001
104 6064REMOVING CONC (MISC)CY  60.000300.000001
105 6013REMOVING STAB BASE & ASPH PAV (9")SY15,671.0006.0000015,671.0006.000001
105 6014REMOVING STAB BASE & ASPH PAV (7"-12")SY  213,830.0003.750001
105 6016REMOVING STAB BASE & ASPH PAV(16")SY42,538.0009.0000042,538.0009.000001
105 6022REMOVING STAB BASE AND ASPH PAV (13")SY  14,113.0005.430001
105 6034REMOVING STAB BASE AND ASPH PAV(1"-9")SY  189,824.0002.920001
105 6035REMOVING STAB BASE & ASPH PAV (0-2")SY  336.00038.000001
105 6036REMOVING STAB BASE & ASPH PAV(15"-20")SY  71,512.0002.400001
105 6037REMOVING STAB BASE AND ASPH PAV(0"-16"SY9,197.0005.000009,197.0005.000001
110 6001EXCAVATION (ROADWAY)CY68,746.0008.28261929,225.0004.8683615
110 6002EXCAVATION (CHANNEL)CY97.0008.0000013,900.4005.630583
110 6003EXCAVATION (SPECIAL)CY  13,083.00018.558892
112 6001SUBGRADE WIDENING (ORD COMP)STA  19.5001,479.109741
132 6001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY  22,280.00010.317822
132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY114,921.0002.000001,319,319.0008.5398010
132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY  562.00020.000001
132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY  102,911.4006.629093
132 6019EMBANKMENT (VEHICLE)(ORD COMP)(TY B)CY  77.00058.896102
134 6001BACKFILL (TY A)STA  69.330180.000001
150 6001BLADINGSTA  8.500375.000001
150 6002BLADINGHR  17.000106.864712
160 6001FURNISHING AND PLACING TOPSOIL (4")STA  8.500310.000001
160 6003FURNISHING AND PLACING TOPSOIL (4")SY  102,257.0002.149156
161 6012GENERAL USE COMPOSTCY  3,887.00030.000001
161 6017COMPOST MANUF TOPSOIL (4")SY80,504.0001.000001,550,295.2001.272579
162 6002BLOCK SODDINGSY  9,845.0004.787533
164 6001BROADCAST SEED (PERM) (RURAL) (SANDY)SY  709.000.550001
164 6007BROADCAST SEED (PERM) (URBAN) (CLAY)SY  2,084.000.360001
164 6009BROADCAST SEED (TEMP) (WARM)SY  134.0003.000001
164 6011BROADCAST SEED (TEMP) (COOL)SY  9,421.000.220112
164 6023CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)SY  25,945.000.391532
164 6027CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)SY64,392.000.2500064,392.000.250001
164 6029CELL FBR MLCH SEED(TEMP)(WARM)SY  18,467.000.340002
164 6031CELL FBR MLCH SEED(TEMP)(COOL)SY  18,467.000.340002
164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY  96,677.000.142085
164 6039DRILL SEEDING (PERM) (URBAN) (CLAY)SY  1,423,805.200.084924
164 6041DRILL SEEDING (TEMP) (WARM)SY  38,352.000.146753
164 6043DRILL SEEDING (TEMP) (COOL)SY  62,615.000.120104
164 6045STRAW OR HAY MULCHINGSY  1,027,963.000.110001
164 6051DRILL SEED (TEMP)(WARM OR COOL)SY80,504.000.250001,323,184.000.071245
164 6066DRILL SEEDING (PERM)(WARM OR COOL)SY  15,181.000.120001
166 6001FERTILIZERAC  8.140399.877152
166 6002FERTILIZERTON  17.000936.230001
168 6001VEGETATIVE WATERINGMG1,255.30020.0000027,158.09022.3588918
169 6001SOIL RETENTION BLANKETS (CL 1) (TY A)SY4,075.0002.7000071,928.2001.130938
169 6006SOIL RETENTION BLANKETS (CL 2) (TY F)SY  1,515.0001.350001
169 6007SOIL RETENTION BLANKETS (CL 2) (TY G)SY  33,027.0003.580001
169 6008SOIL RETENTION BLANKETS (CL 2) (TY H)SY  47,054.0003.150001
170 6001IRRIGATION SYSTEMLS  1.000100,000.000001
192 6004PLANT MATERIAL (5-GAL)EA  7,686.00030.000001
192 6005PLANT MATERIAL (15-GAL)EA  1,740.000125.000001
192 6013MULCHSY  34,917.0003.000001
192 6016PLANT BED PREPARATIONSY  32,942.0002.000001
192 6049PLANT MATERIAL (MIN 4' TRNK HT) (PALM)EA  60.000350.000001
192 6050PLANT MATERIAL (MIN 6' TRNK HT) (PALM)EA  21.000400.000001
192 6051PLANT MATERIAL (MIN 8' TRNK HT) (PALM)EA  30.000400.000001
193 6001PLANT MAINTENANCEMO  24.0001,500.000001
193 6005PLANT REPLACEMENT (5-GAL)EA  125.00030.000001
193 6007IRRIGATION SYSTEM OPER AND MAINTMO  24.000500.000001
193 6009PLANT REPLACEMENT (15 GAL)EA  35.00030.000001