Last Update: Thursday, January 5, 2017
|
Text version of this page
|
| County: |
HOOD |
Let Date: |
01/04/17 |
| Type: |
THIN OVERLAY MIXTURE (TOM) |
Seq No: |
3019 |
| Time: |
32 WORKING DAYS |
Project ID: |
NH 2016(147) |
| Highway: |
US 377 |
Contract #: |
01173019 |
| Length: |
21.517 |
CCSJ: |
0080-04-096 |
| Limits: |
|
| From: |
SH 171 |
Check: |
$64,000.00 |
| To: |
FM 167N |
Misc Cost: |
$6,000.00 |
| Estimate |
$3,522,073.49 |
% Over/Under |
Company |
| Bidder 1 |
$3,213,559.48 |
-8.76% |
NORTHEASTERN PAVERS, INC. |
| Bidder 2 |
$3,222,085.62 |
-8.52% |
OLDCASTLE MATERIALS TEXAS, INC. |
| Bidder 3 |
$3,908,410.98 |
+10.97% |
PEACHTREE CONSTRUCTION, LTD. |
|
Text version of this page
|
| County: |
CALHOUN |
Let Date: |
01/04/17 |
| Type: |
REPLACE BRIDGE AND APPROACHES |
Seq No: |
3020 |
| Time: |
60 WORKING DAYS |
Project ID: |
BR 2012(730) |
| Highway: |
CR |
Contract #: |
01173020 |
| Length: |
0.100 |
CCSJ: |
0913-19-028 |
| Limits: |
|
| From: |
AT DRAW CR 206 |
Check: |
$9,000.00 |
| To: |
(GIN ROAD) STR# AA02-06-001 |
Misc Cost: |
$1,500.00 |
| Estimate |
$473,543.00 |
% Over/Under |
Company |
| Bidder 1 |
$416,186.67 |
-12.11% |
REXCO CONSTRUCTION SERVICES, INC. |
| Bidder 2 |
$421,834.00 |
-10.92% |
CONSTAR CONSTRUCTION |
| Bidder 3 |
$474,995.42 |
+0.31% |
LESTER CONTRACTING, INC. |
| Bidder 4 |
$477,816.43 |
+0.90% |
LISKA CONSTRUCTION COMPANY, INC. |
| Bidder 5 |
$496,272.00 |
+4.80% |
3LW MANAGEMENT, LLC |
| Bidder 6 |
$529,878.13 |
+11.90% |
TREVWAY, INC. |
| Bidder 7 |
$694,266.00 |
+46.61% |
SJ&J CONSTRUCTION, LLC |
|
Text version of this page
|
| County: |
JEFFERSON |
Let Date: |
01/04/17 |
| Type: |
MILL AND OVERLAY EXISTING ROADWAY |
Seq No: |
3021 |
| Time: |
180 WORKING DAYS |
Project ID: |
NH 2017(301) |
| Highway: |
SH 73 |
Contract #: |
01173021 |
| Length: |
6.897 |
CCSJ: |
0306-03-126 |
| Limits: |
|
| From: |
SH 87 |
Check: |
$100,000.00 |
| To: |
0.400 MILES EAST OF FM 366 |
Misc Cost: |
$100,000.00 |
|
Text version of this page
|
| County: |
KARNES |
Let Date: |
01/04/17 |
| Type: |
BASE REPAIR, SURFACE AND RESTRIPE ROADWAY |
Seq No: |
3022 |
| Time: |
232 WORKING DAYS |
Project ID: |
STP 2017(305) |
| Highway: |
SH 72 |
Contract #: |
01173022 |
| Length: |
1.860 |
CCSJ: |
0270-03-074 |
| Limits: |
|
| From: |
W. MAIN ST. |
Check: |
$96,000.00 |
| To: |
WILBERN ST. |
Misc Cost: |
$273,000.00 |
| Estimate |
$4,807,490.60 |
% Over/Under |
Company |
| Bidder 1 |
$5,186,387.04 |
+7.88% |
HUNTER INDUSTRIES, LTD. |
| Bidder 2 |
$5,451,747.33 |
+13.40% |
CURRAN CONTRACTING COMPANY |
| Bidder 3 |
$5,520,600.82 |
+14.83% |
DEAN WORD COMPANY, LTD. |
| Bidder 4 |
$5,546,964.30 |
+15.38% |
ANGEL BROTHERS HOLDINGS CORP. |
| Bidder 5 |
$5,887,845.11 |
+22.47% |
AUSTIN MATERIALS, LLC |
| Bidder 6 |
$6,108,187.04 |
+27.06% |
SALINAS CONSTRUCTION TECHNOLOGIES, LTD. |
| Bidder 7 |
$7,047,799.93 |
+46.60% |
RAY FARIS, INC. |
| Bidder 8 |
$7,742,442.38 |
+61.05% |
J. CARROLL WEAVER, INC. |
|
Text version of this page
|
| County: |
LIVE OAK |
Let Date: |
01/04/17 |
| Type: |
INSTALL MEDIAN BARRIER |
Seq No: |
3023 |
| Time: |
81 WORKING DAYS |
Project ID: |
STP 1602(446)HES |
| Highway: |
IH 37 |
Contract #: |
01173023 |
| Length: |
5.220 |
CCSJ: |
0073-07-063 |
| Limits: |
|
| From: |
3.022 MI S OF ATASCOSA CO LINE |
Check: |
$19,000.00 |
| To: |
ATASCOSA CO LINE |
Misc Cost: |
$48,500.00 |
| Estimate |
$951,560.00 |
% Over/Under |
Company |
| Bidder 1 |
$728,162.74 |
-23.48% |
GRATIOT CONSTRUCTION, LTD. |
| Bidder 2 |
$800,190.00 |
-15.91% |
MASSANA CONSTRUCTION INC. |
| Bidder 3 |
$819,388.50 |
-13.89% |
SCR CIVIL CONSTRUCTION, LLC |
| Bidder 4 |
$922,453.00 |
-3.06% |
VANN/ELLI, INC. |
| Bidder 5 |
$946,272.50 |
-0.56% |
DAN WILLIAMS COMPANY |
| Bidder 6 |
$1,364,240.00 |
+43.37% |
CHAMPION INFRASTRUCTURE, LLC |
| Bidder 7 |
$1,506,760.00 |
+58.35% |
FNH CONSTRUCTION, LLC |
|
Text version of this page
|
| County: |
MCLENNAN |
Let Date: |
01/04/17 |
| Type: |
REPLACE BRIDGE AND APPROACHES |
Seq No: |
3024 |
| Time: |
234 WORKING DAYS |
Project ID: |
BR 2015(489) |
| Highway: |
CR |
Contract #: |
01173024 |
| Length: |
0.144 |
CCSJ: |
0909-22-167 |
| Limits: |
|
| From: |
ON CR 174 @ TONK CREEK |
Check: |
$16,000.00 |
| To: |
(MAP #493) |
Misc Cost: |
$7,500.00 |
| Estimate |
$812,168.80 |
% Over/Under |
Company |
| Bidder 1 |
$697,709.55 |
-14.09% |
ELLIS-MCGINNIS CONSTRUCTION CO. |
| Bidder 2 |
$785,625.31 |
-3.27% |
PROJECT ALLIED RESOURCES, LLC |
| Bidder 3 |
$854,856.94 |
+5.26% |
KNIFE RIVER CORPORATION - SOUTH |
| Bidder 4 |
$886,888.88 |
+9.20% |
PIERCE R & B LLC |
| Bidder 5 |
$946,740.10 |
+16.57% |
HODGES AND SON CONSTRUCTION COMPANY, INC. |
| Bidder 6 |
$964,458.85 |
+18.75% |
STATELINE CONSTRUCTION, LLC |
| Bidder 7 |
$1,090,200.70 |
+34.23% |
JAY-REESE CONTRACTORS, INC. |
| Bidder 8 |
$1,099,143.39 |
+35.33% |
A GREATER AUSTIN DEVELOPMENT CONCRETE CONSTRUCTION, L.L.C. |
|
Text version of this page
|
| County: |
BREWSTER |
Let Date: |
01/04/17 |
| Type: |
ROADWAY REHABILITATION |
Seq No: |
3025 |
| Time: |
140 WORKING DAYS |
Project ID: |
NH 2017(324) |
| Highway: |
US 67 |
Contract #: |
01173025 |
| Length: |
9.588 |
CCSJ: |
0021-01-053 |
| Limits: |
|
| From: |
JCT US 90 |
Check: |
$86,000.00 |
| To: |
1.35 MI E OF SH 223 |
Misc Cost: |
$40,000.00 |
| Estimate |
$4,287,971.83 |
% Over/Under |
Company |
| Bidder 1 |
$4,010,557.70 |
-6.47% |
DAN WILLIAMS COMPANY |
| Bidder 2 |
$4,766,686.79 |
+11.16% |
REECE ALBERT, INC. |
| Bidder 3 |
$4,934,981.16 |
+15.09% |
GILVIN-TERRILL, LTD. |
| Bidder 4 |
$5,014,384.52 |
+16.94% |
ALLEN KELLER COMPANY |
| Bidder 5 |
$5,227,376.03 |
+21.91% |
FNF CONSTRUCTION, INC. |
| Bidder 6 |
$5,395,196.79 |
+25.82% |
SALINAS CONSTRUCTION TECHNOLOGIES, LTD. |
|
Text version of this page
|
| County: |
SHELBY |
Let Date: |
01/04/17 |
| Type: |
SAFETY TREAT FIXED OBJECTS, ETC. |
Seq No: |
3026 |
| Time: |
211 WORKING DAYS |
Project ID: |
STP 2017(310)HES |
| Highway: |
US 84 |
Contract #: |
01173026 |
| Length: |
6.476 |
CCSJ: |
0123-07-019 |
| Limits: |
|
| From: |
RUSK COUNTY LINE |
Check: |
$27,000.00 |
| To: |
US 59, ETC. |
Misc Cost: |
$6,000.00 |
| Estimate |
$1,349,785.50 |
% Over/Under |
Company |
| Bidder 1 |
$1,254,729.10 |
-7.04% |
STATELINE CONSTRUCTION, LLC |
| Bidder 2 |
$1,258,706.25 |
-6.75% |
A R BROTHERS CONSTRUCTION SERVICES, INC. |
| Bidder 3 |
$1,339,999.98 |
-0.73% |
PIERCE R & B LLC |
| Bidder 4 |
$1,485,457.00 |
+10.05% |
DREWERY CONSTRUCTION COMPANY, INCORPORATED |
| Bidder 5 |
$1,681,215.00 |
+24.55% |
LONGVIEW BRIDGE AND ROAD, LTD. |
| Bidder 6 |
$1,731,600.50 |
+28.29% |
FNH CONSTRUCTION, LLC |
| Bidder 7 |
$1,755,831.95 |
+30.08% |
CDM HOLDINGS, LLC |
| Bidder 8 |
$1,765,796.10 |
+30.82% |
HODGES AND SON CONSTRUCTION COMPANY, INC. |
| Bidder 9 |
$1,891,358.50 |
+40.12% |
SJ&J CONSTRUCTION, LLC |
| Bidder 10 |
$1,914,843.50 |
+41.86% |
EAST TEXAS BRIDGE, INC. |
| Bidder 11 |
$2,016,672.00 |
+49.41% |
3LW MANAGEMENT, LLC |
|
Text version of this page
|
| County: |
SMITH |
Let Date: |
01/04/17 |
| Type: |
THERMOPLASTIC STRIPING |
Seq No: |
3027 |
| Time: |
26 WORKING DAYS |
Project ID: |
STP 2017(230) |
| Highway: |
VA |
Contract #: |
01173027 |
| Length: |
1.000 |
CCSJ: |
0910-00-100 |
| Limits: |
|
| From: |
VARIOUS LOCATIONS |
Check: |
$6,000.00 |
| To: |
IN TYLER DISTRICT |
Misc Cost: |
$2,000.00 |
| Estimate |
$311,113.40 |
% Over/Under |
Company |
| Bidder 1 |
$209,929.70 |
-32.52% |
STRIPE-A-ZONE, INC. |
| Bidder 2 |
$225,641.05 |
-27.47% |
STRIPING TECHNOLOGY, L.P. |
| Bidder 3 |
$247,338.00 |
-20.50% |
BATTERSON, LLP |
| Bidder 4 |
$271,006.40 |
-12.89% |
TRP CONSTRUCTION GROUP, LLC |
| Bidder 5 |
$292,302.00 |
-6.05% |
TOTAL HIGHWAY MAINTENANCE, LLC |
| Bidder 6 |
$783,489.00 |
+151.83% |
HIGHWAY GRAPHICS, LLC |
|
Text version of this page
|
| County: |
TOM GREEN |
Let Date: |
01/04/17 |
| Type: |
PAVEMENT MARKINGS |
Seq No: |
3029 |
| Time: |
49 WORKING DAYS |
Project ID: |
STP 2017(330) |
| Highway: |
VA |
Contract #: |
01173029 |
| Length: |
0.001 |
CCSJ: |
0907-00-166 |
| Limits: |
|
| From: |
VARIOUS LOCATIONS IN SJT DISTRICT |
Check: |
$13,000.00 |
| To: |
. |
Misc Cost: |
$3,000.00 |
| Estimate |
$646,017.00 |
% Over/Under |
Company |
| Bidder 1 |
$506,110.53 |
-21.66% |
FLAT LINE, INC. |
| Bidder 2 |
$511,692.40 |
-20.79% |
VIZCAINO, L.P. |
| Bidder 3 |
$544,642.33 |
-15.69% |
STRIPE-A-ZONE, INC. |
| Bidder 4 |
$592,334.10 |
-8.31% |
BARRICADES UNLIMITED |
| Bidder 5 |
$595,155.60 |
-7.87% |
D. I. J. CONSTRUCTION, INC. |
| Bidder 6 |
$598,260.95 |
-7.39% |
PAVEMENT MARKINGS INC. |
| Bidder 7 |
$628,681.45 |
-2.68% |
TRP CONSTRUCTION GROUP, LLC |
| Bidder 8 |
$631,943.91 |
-2.18% |
FLASHER EQUIPMENT COMPANY |
| Bidder 9 |
$643,411.88 |
-0.40% |
TOTAL HIGHWAY MAINTENANCE, LLC |
|
Text version of this page
|
| County: |
BEXAR |
Let Date: |
01/04/17 |
| Type: |
CONSTRUCT PEDESTRIAN BRIDGE OVER US 90 |
Seq No: |
3030 |
| Time: |
210 WORKING DAYS |
Project ID: |
STP 2017(331)HES |
| Highway: |
US 90 |
Contract #: |
01173030 |
| Length: |
1.172 |
CCSJ: |
0024-08-128 |
| Limits: |
|
| From: |
IH 410 |
Check: |
$44,000.00 |
| To: |
LP 13 |
Misc Cost: |
$141,000.00 |
| Estimate |
$2,178,952.75 |
% Over/Under |
Company |
| Bidder 1 |
$2,331,043.05 |
+6.98% |
RELMCO, INC. |
| Bidder 2 |
$2,394,958.58 |
+9.91% |
CAPITAL EXCAVATION COMPANY |
| Bidder 3 |
$2,503,646.54 |
+14.90% |
DAN WILLIAMS COMPANY |
| Bidder 4 |
$2,550,417.20 |
+17.05% |
CURRAN CONTRACTING COMPANY |
| Bidder 5 |
$2,895,136.17 |
+32.87% |
ALTUS CONSTRUCTION LLC |
| Bidder 6 |
$2,905,508.19 |
+33.34% |
ACME BRIDGE COMPANY, INC. |
| Bidder 7 |
$2,927,093.65 |
+34.33% |
HUNTER INDUSTRIES, LTD. |
| Bidder 8 |
$3,441,154.45 |
+57.93% |
JORDAN FOSTER CONSTRUCTION, LLC |
|
Text version of this page
|
| County: |
HIDALGO |
Let Date: |
01/04/17 |
| Type: |
RECONSTRUCTION AND WIDENING |
Seq No: |
3031 |
| Time: |
440 WORKING DAYS |
Project ID: |
STP 2008(328)MM |
| Highway: |
CS |
Contract #: |
01173031 |
| Length: |
2.200 |
CCSJ: |
0921-02-140 |
| Limits: |
|
| From: |
ON OWASSA RD, FROM JACKSON RD |
Check: |
$100,000.00 |
| To: |
I 69-C |
Misc Cost: |
$117,250.00 |
| Estimate |
$6,256,193.52 |
% Over/Under |
Company |
| Bidder 1 |
$5,206,108.37 |
-16.78% |
IOC COMPANY LLC |
| Bidder 2 |
$5,361,523.37 |
-14.30% |
REIM CONSTRUCTION, INC. |
| Bidder 3 |
$5,500,273.00 |
-12.08% |
TEXAS CORDIA CONSTRUCTION, LLC |
| Bidder 4 |
$6,100,261.97 |
-2.49% |
TEXAS SAI, INC. |
| Bidder 5 |
$6,359,822.08 |
+1.66% |
FOREMOST PAVING, INC. |
| Bidder 6 |
$8,267,450.57 |
+32.15% |
ANDERSON COLUMBIA CO., INC. |
|
Text version of this page
|
| County: |
HOOD |
Let Date: |
01/04/17 |
| Type: |
OFF SITE DRAINAGE REPLACEMENT |
Seq No: |
3032 |
| Time: |
149 WORKING DAYS |
Project ID: |
ER 1602(591) |
| Highway: |
SH 144 |
Contract #: |
01173032 |
| Length: |
0.002 |
CCSJ: |
0385-04-045 |
| Limits: |
|
| From: |
AT BROOKSHIRES |
Check: |
$58,000.00 |
| To: |
|
Misc Cost: |
$11,000.00 |
| Estimate |
$2,909,365.50 |
% Over/Under |
Company |
| Bidder 1 |
$2,899,083.65 |
-0.35% |
BRETT CONSTRUCTION COMPANY |
| Bidder 2 |
$3,218,191.00 |
+10.61% |
SEMA CONSTRUCTION, INC. |
| Bidder 3 |
$3,549,336.50 |
+22.00% |
ED BELL CONSTRUCTION COMPANY |
| Bidder 4 |
$3,642,426.50 |
+25.20% |
FNH CONSTRUCTION, LLC |
| Bidder 5 |
$3,944,246.70 |
+35.57% |
EARTH BUILDERS, L.P. |
| Bidder 6 |
$4,030,381.15 |
+38.53% |
JAY MILLS CONTRACTING, INCORPORATED |
| Bidder 7 |
$4,215,582.45 |
+44.90% |
RAGLE CONSTRUCTION, INC. |
|
Text version of this page
|
| County: |
HAYS |
Let Date: |
01/04/17 |
| Type: |
REPAIR AND OVERLAY |
Seq No: |
3033 |
| Time: |
40 WORKING DAYS |
Project ID: |
STP 2017(322) |
| Highway: |
FM 1626 |
Contract #: |
01173033 |
| Length: |
2.995 |
CCSJ: |
1539-03-001 |
| Limits: |
|
| From: |
FM 2770 |
Check: |
$28,000.00 |
| To: |
IH 35 |
Misc Cost: |
$25,500.00 |
| Estimate |
$1,398,673.90 |
% Over/Under |
Company |
| Bidder 1 |
$1,037,967.60 |
-25.79% |
LONE STAR PAVING COMPANY |
| Bidder 2 |
$1,069,999.30 |
-23.50% |
AUSTIN MATERIALS, LLC |
| Bidder 3 |
$1,113,697.64 |
-20.37% |
DEAN WORD COMPANY, LTD. |
| Bidder 4 |
$1,297,106.15 |
-7.26% |
ANGEL BROTHERS HOLDINGS CORP. |
| Bidder 5 |
$1,414,154.22 |
+1.11% |
HUNTER INDUSTRIES, LTD. |
| Bidder 6 |
$1,495,906.46 |
+6.95% |
CLARK CONSTRUCTION OF TEXAS, INC. |
| Bidder 7 |
$1,499,774.33 |
+7.23% |
OLDCASTLE MATERIALS TEXAS, INC. |
|
Text version of this page
|
| County: |
BOWIE |
Let Date: |
01/04/17 |
| Type: |
GR,BS,SURF & PAV MRKS |
Seq No: |
3034 |
| Time: |
85 WORKING DAYS |
Project ID: |
STP 1602(316) |
| Highway: |
FM 1297 |
Contract #: |
01173034 |
| Length: |
0.939 |
CCSJ: |
2879-01-010 |
| Limits: |
|
| From: |
FM 2878 |
Check: |
$54,000.00 |
| To: |
FM 559 |
Misc Cost: |
$14,000.00 |
| Estimate |
$2,503,450.00 |
% Over/Under |
Company |
| Bidder 1 |
$2,668,802.19 |
+6.61% |
H. V. CAVER, INC. |
| Bidder 2 |
$2,837,676.30 |
+13.35% |
H. H. HOWARD & SONS, INC. |
| Bidder 3 |
$2,880,625.00 |
+15.07% |
FRITCHER CONSTRUCTION SERVICES |
| Bidder 4 |
$3,016,838.45 |
+20.51% |
LONGVIEW BRIDGE AND ROAD, LTD. |
| Bidder 5 |
$3,252,239.00 |
+29.91% |
FNH CONSTRUCTION, LLC |
| Bidder 6 |
$3,387,596.20 |
+35.32% |
EAST TEXAS BRIDGE, INC. |
|
Text version of this page
|
| County: |
ERATH |
Let Date: |
01/04/17 |
| Type: |
SEAL COAT |
Seq No: |
3035 |
| Time: |
74 WORKING DAYS |
Project ID: |
STP 2017(350) |
| Highway: |
FM 8 |
Contract #: |
01173035 |
| Length: |
18.471 |
CCSJ: |
0550-02-038 |
| Limits: |
|
| From: |
FM 988 |
Check: |
$100,000.00 |
| To: |
EASTLAND COUNTY LINE |
Misc Cost: |
$100,000.00 |