Detail Letting Schedule for Atascosa County (FY 2004)
| Detail Letting Schedule for Atascosa County (FY 2004) | ||||
| Last Update: Tuesday, August 17, 2004 |
| Atascosa County (FY 2004) |
CCSJ: 0073-04-045 | |||
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | IH 35 | Let Status: | Actual |
| Project ID: | CPM 17-6-72 | CSJ: | 0017-06-072 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | ON NBFR FROM SH 57 | Fund Cat: | 1 |
| Limits To: | FM 462 | Estimate: | $74,816 |
| Length: | 3.5 Miles | Actual: | $57,257 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | US 90 | Let Status: | Actual |
| Project ID: | CPM 24-1-91 | CSJ: | 0024-01-091 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | DRY FRIO RIVER | Fund Cat: | 1 |
| Limits To: | FRIO RIVER | Estimate: | $15,896 |
| Length: | 0.4 Miles | Actual: | $10,822 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | US 90 | Let Status: | Actual |
| Project ID: | CPM 24-2-67 | CSJ: | 0024-02-067 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FRIO RIVER | Fund Cat: | 1 |
| Limits To: | 7.3 MILES EAST OF THE FRIO RIVER | Estimate: | $254,075 |
| Length: | 7.3 Miles | Actual: | $176,963 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | US 87 | Let Status: | Actual |
| Project ID: | CPM 72-2-17 | CSJ: | 0072-02-017 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | KENDALL/KERR COUNTY LINE | Fund Cat: | 1 |
| Limits To: | KENDALL/GILLESPIE COUNTY LINE | Estimate: | $92,869 |
| Length: | 2.9 Miles | Actual: | $66,235 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | US 87 | Let Status: | Actual |
| Project ID: | CPM 72-3-14 | CSJ: | 0072-03-014 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | KENDALL/KERR COUNTY LINE | Fund Cat: | 1 |
| Limits To: | KERR/KENDALL COUNTY LINE | Estimate: | $39,687 |
| Length: | 1.3 Miles | Actual: | $28,705 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | US 87 | Let Status: | Actual |
| Project ID: | CPM 72-4-31 | CSJ: | 0072-04-031 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | KERR/KENDALL COUNTY LINE | Fund Cat: | 1 |
| Limits To: | IH 10 SOUTH CROSSOVER | Estimate: | $249,166 |
| Length: | 7.3 Miles | Actual: | $174,234 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | US 87 | Let Status: | Actual |
| Project ID: | CPM 72-14-21 | CSJ: | 0072-14-021 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | IH 10/US 87 | Fund Cat: | 1 |
| Limits To: | WEST OF FM 1376 | Estimate: | $16,761 |
| Length: | 0.8 Miles | Actual: | $11,769 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | US 281 | Let Status: | Actual |
| Project ID: | CPM 73-4-45 | CSJ: | 0073-04-045 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 97 (W) | Fund Cat: | 1 |
| Limits To: | IH 37 | Estimate: | $750,269 |
| Length: | 4.9 Miles | Actual: | $400,069 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | US 181 | Let Status: | Actual |
| Project ID: | CPM 100-3-63 | CSJ: | 0100-03-063 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MILES OF NORTH LOOP 181 & US 181 | Fund Cat: | 1 |
| Limits To: | NORTH CITY LIMITS OF FLORESVILLE | Estimate: | $140,476 |
| Length: | 2.7 Miles | Actual: | $112,831 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | LP 181 | Let Status: | Actual |
| Project ID: | C 100-9-16 | CSJ: | 0100-09-016 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | LP 181 | Fund Cat: | 1 |
| Limits To: | NORTH CITY LIMITS OF FLORESVILLE | Estimate: | $88,939 |
| Length: | 3.6 Miles | Actual: | $68,861 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | SH 27 | Let Status: | Actual |
| Project ID: | CPM 142-6-24 | CSJ: | 0142-06-024 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | KERR/KENDALL COUNTY LINE | Fund Cat: | 1 |
| Limits To: | US 87/SH 27 INTERSECTION | Estimate: | $69,124 |
| Length: | 1.7 Miles | Actual: | $48,457 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | US 87 | Let Status: | Actual |
| Project ID: | CPM 143-4-57 | CSJ: | 0143-04-057 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 538 | Fund Cat: | 1 |
| Limits To: | 0.50 MI NE OF FM 538 | Estimate: | $14,255 |
| Length: | 0.5 Miles | Actual: | $10,979 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | US 87 | Let Status: | Actual |
| Project ID: | CPM 143-5-28 | CSJ: | 0143-05-028 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.50 MI NE OF FM 538 | Fund Cat: | 1 |
| Limits To: | GONZALES COUNTY LINE | Estimate: | $220,881 |
| Length: | 9.0 Miles | Actual: | $173,280 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | SH 46 | Let Status: | Actual |
| Project ID: | CPM 216-2-48 | CSJ: | 0216-02-048 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.4 MI S OF US 90A | Fund Cat: | 1 |
| Limits To: | SH 123 | Estimate: | $120,075 |
| Length: | 3.9 Miles | Actual: | $92,179 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | FM 117 | Let Status: | Actual |
| Project ID: | CPM 236-5-4 | CSJ: | 0236-05-004 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 85 | Fund Cat: | 1 |
| Limits To: | LA SALLE COUNTY LINE | Estimate: | $34,247 |
| Length: | 1.7 Miles | Actual: | $25,293 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | SH 80 | Let Status: | Actual |
| Project ID: | CPM 287-2-13 | CSJ: | 0287-02-013 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | GONZALES COUNTY LINE | Fund Cat: | 1 |
| Limits To: | CALWELL COUNTY LINE (SAN MARCOS RIVER) | Estimate: | $116,582 |
| Length: | 4.2 Miles | Actual: | $91,960 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | SH 85 | Let Status: | Actual |
| Project ID: | CPM 301-3-22 | CSJ: | 0301-03-022 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | DIMMIT COUNTY LINE | Fund Cat: | 1 |
| Limits To: | DILLEY CITY LIMITS | Estimate: | $364,025 |
| Length: | 14.7 Miles | Actual: | $274,538 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | SH 85 | Let Status: | Actual |
| Project ID: | CPM 301-7-10 | CSJ: | 0301-07-010 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 1582 | Fund Cat: | 1 |
| Limits To: | ATASCOSA COUNTY LINE | Estimate: | $290,333 |
| Length: | 12.6 Miles | Actual: | $221,592 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | SH 85 | Let Status: | Actual |
| Project ID: | CPM 301-8-9 | CSJ: | 0301-08-009 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FRIO COUNTY LINE | Fund Cat: | 1 |
| Limits To: | FM 140 | Estimate: | $22,405 |
| Length: | 0.9 Miles | Actual: | $16,759 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | SH 97 | Let Status: | Actual |
| Project ID: | CPM 328-2-40 | CSJ: | 0328-02-040 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | ATOSCOSA COUNTY LINE | Fund Cat: | 1 |
| Limits To: | US 181 | Estimate: | $326,566 |
| Length: | 13.3 Miles | Actual: | $254,052 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | SH 97 | Let Status: | Actual |
| Project ID: | CPM 328-6-25 | CSJ: | 0328-06-025 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | MC MULLEN COUNTY LINE | Fund Cat: | 1 |
| Limits To: | CHARLOTTE CITY LIMITS | Estimate: | $329,250 |
| Length: | 15.2 Miles | Actual: | $254,216 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | SP 242 | Let Status: | Actual |
| Project ID: | CPM 328-10-18 | CSJ: | 0328-10-018 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 476 | Fund Cat: | 1 |
| Limits To: | SH 97 | Estimate: | $41,446 |
| Length: | 1.1 Miles | Actual: | $30,871 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | SH 123 | Let Status: | Actual |
| Project ID: | CPM 366-5-40 | CSJ: | 0366-05-040 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | US 87 | Fund Cat: | 1 |
| Limits To: | KARNES COUNTY LINE | Estimate: | $293,363 |
| Length: | 10.8 Miles | Actual: | $231,962 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | SH 173 | Let Status: | Actual |
| Project ID: | CPM 421-8-28 | CSJ: | 0421-08-028 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | BANDERA COUNTY LINE | Fund Cat: | 1 |
| Limits To: | US 90 | Estimate: | $479,810 |
| Length: | 20.0 Miles | Actual: | $370,318 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | RM 32 | Let Status: | Actual |
| Project ID: | CPM 51-2-47 | CSJ: | 0511-02-017 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 3424 | Fund Cat: | 1 |
| Limits To: | HAYS COUNTY LINE | Estimate: | $112,025 |
| Length: | 3.7 Miles | Actual: | $87,032 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | SH 16 | Let Status: | Actual |
| Project ID: | CPM 517-3-26 | CSJ: | 0517-03-026 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | TILDEN (FOWLER RD) | Fund Cat: | 1 |
| Limits To: | 1 MILE N OF FM 624 | Estimate: | $529,159 |
| Length: | 21.3 Miles | Actual: | $412,586 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | RM 187 | Let Status: | Actual |
| Project ID: | CPM 678-1-26 | CSJ: | 0678-01-026 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 1.8 MILES NORTH OF FM 1796 | Fund Cat: | 1 |
| Limits To: | SH 127 | Estimate: | $202,352 |
| Length: | 10.4 Miles | Actual: | $140,537 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | RM 187 | Let Status: | Actual |
| Project ID: | CPM 678-2-26 | CSJ: | 0678-02-026 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | KERR/BANDERA COUNTY LINE | Fund Cat: | 1 |
| Limits To: | FM 337 | Estimate: | $315,593 |
| Length: | 15.0 Miles | Actual: | $218,699 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | FM 140 | Let Status: | Actual |
| Project ID: | CPM 748-3-1 | CSJ: | 0748-03-001 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 85 | Fund Cat: | 1 |
| Limits To: | CHARLOTTE CITY LIMITS | Estimate: | $9,031 |
| Length: | 0.5 Miles | Actual: | $6,724 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | FM 472 | Let Status: | Actual |
| Project ID: | CPM 849-4-32 | CSJ: | 0849-04-032 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 173 | Fund Cat: | 1 |
| Limits To: | FM 462 | Estimate: | $58,553 |
| Length: | 3.0 Miles | Actual: | $42,973 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | FM 758 | Let Status: | Actual |
| Project ID: | CPM 987-2-11 | CSJ: | 0987-02-011 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 46 (FM 25) | Fund Cat: | 1 |
| Limits To: | FM 123 | Estimate: | $122,940 |
| Length: | 6.6 Miles | Actual: | $91,669 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | FM 1516 | Let Status: | Actual |
| Project ID: | CPM 1477-1-33 | CSJ: | 1477-01-033 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 1976 | Fund Cat: | 1 |
| Limits To: | FM 1346 | Estimate: | $203,803 |
| Length: | 7.3 Miles | Actual: | $145,370 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | FM 306 | Let Status: | Actual |
| Project ID: | CPM 1728-2-47 | CSJ: | 1728-02-047 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | OLD MKT RAILROAD CROSSING | Fund Cat: | 1 |
| Limits To: | IH 35 WFR | Estimate: | $52,978 |
| Length: | 1.8 Miles | Actual: | $40,565 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | FM 2107 | Let Status: | Actual |
| Project ID: | CPM 2019-1-12 | CSJ: | 2019-01-012 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | END OF MAINTENANCE | Fund Cat: | 1 |
| Limits To: | SH 16 | Estimate: | $159,981 |
| Length: | 8.3 Miles | Actual: | $107,424 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | FM 539 | Let Status: | Actual |
| Project ID: | CPM 2233-1-12 | CSJ: | 2233-01-012 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | "C" STREET | Fund Cat: | 1 |
| Limits To: | US 87 | Estimate: | $39,907 |
| Length: | 1.6 Miles | Actual: | $31,209 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | LP 1604 | Let Status: | Actual |
| Project ID: | C 2255-1-31 | CSJ: | 2255-01-031 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SAN ANTONIO RIVER | Fund Cat: | 1 |
| Limits To: | IH 37 | Estimate: | $81,624 |
| Length: | 3.2 Miles | Actual: | $57,394 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | FM 3009 | Let Status: | Actual |
| Project ID: | CPM 3107-1-30 | CSJ: | 3107-01-030 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 2252 | Fund Cat: | 1 |
| Limits To: | GUADALUPE COUNTY LINE | Estimate: | $40,579 |
| Length: | 1.3 Miles | Actual: | $32,310 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | FM 3009 | Let Status: | Actual |
| Project ID: | CPM 3107-2-28 | CSJ: | 3107-02-028 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | COMAL COUNTY LINE | Fund Cat: | 1 |
| Limits To: | IH 35 WFR | Estimate: | $16,093 |
| Length: | 0.5 Miles | Actual: | $12,395 |
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | RM 1077 | Let Status: | Actual |
| Project ID: | CPM 3143-1-9 | CSJ: | 3143-01-009 |
| Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 173 | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT | Estimate: | $151,648 |
| Length: | 8.0 Miles | Actual: | $104,282 |
|
Back... |
Totals for 0073-04-045 | ||
|---|---|---|---|
| Length: | 236.8 Miles | ||
| Estimate: | $6,541,582 | ||
| Actual: | $4,735,371 | ||
CCSJ: 0073-05-060 | |||
| District: | San Antonio | Let Date: | AUG 2004 |
| Highway: | IH 37 | Let Status: | Approved |
| Project ID: | IM 37-2(78) | CSJ: | 0073-05-060 |
| Description: | REHABILITATE AND WIDEN NARROW PAVEMENT | Handling Code: |
|
| Limits From: | S OF CR 426 ON W FR | Fund Cat: | 1 |
| Limits To: | 3.2 MI SOUTH OF FM 541 | Estimate: | $2,277,563 |
| Length: | 7.9 Miles | Actual: | |
| District: | San Antonio | Let Date: | AUG 2004 |
| Highway: | IH 37 | Let Status: | Approved |
| Project ID: | IM 37-2(79) | CSJ: | 0073-06-041 |
| Description: | REHABILITATE AND WIDEN NARROW PAVEMENT | Handling Code: |
NC |
| Limits From: | 0.93 MI N OF FM 791 | Fund Cat: | 1 |
| Limits To: | 0.60 MI S OF FM 1099 | Estimate: | $7,603,326 |
| Length: | 3.3 Miles | Actual: | |
| District: | San Antonio | Let Date: | AUG 2004 |
| Highway: | IH 37 | Let Status: | Approved |
| Project ID: | IM 37-2(78) | CSJ: | 0073-10-041 |
| Description: | REHAB AND WIDEN NARROW PAVEMENT | Handling Code: |
|
| Limits From: | 0.84 MI N OF CR 426 ON WFR | Fund Cat: | 1 |
| Limits To: | S OF CR 426 | Estimate: | $281,697 |
| Length: | 0.9 Miles | Actual: | |
|
List Showing Order Bidders List Bid Tabulations Proposal Req Form Back... |
Totals for 0073-05-060 | ||
| Length: | 12.1 Miles | ||
| Estimate: | $10,162,586 | ||
| Actual: | |||
CCSJ: 0328-03-030 | |||
| District: | San Antonio | Let Date: | JAN 2004 |
| Highway: | SH 97 | Let Status: | Actual |
| Project ID: | CPM 328-3-30 | CSJ: | 0328-03-030 |
| Description: | OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | GALVAN CREEK | Fund Cat: | 1 |
| Limits To: | IH 37 | Estimate: | $737,848 |
| Length: | 2.0 Miles | Actual: | $651,016 |
| District: | San Antonio | Let Date: | JAN 2004 |
| Highway: | FM 3445 | Let Status: | Actual |
| Project ID: | CPM 3439-1-4 | CSJ: | 3439-01-004 |
| Description: | OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | AT SAN MIGUEL CREEK BRIDGE | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $17,864 |
| Length: | 0.1 Miles | Actual: | $16,274 |
|
Back... |
Totals for 0328-03-030 | ||
| Length: | 2.1 Miles | ||
| Estimate: | $755,712 | ||
| Actual: | $667,290 | ||
CCSJ: 0421-04-028 | |||
| District: | San Antonio | Let Date: | OCT 2003 |
| Highway: | SH 173 | Let Status: | Actual |
| Project ID: | STP 2003(695) | CSJ: | 0421-04-028 |
| Description: | REHABILITATE AND WIDEN NARROW PAVEMENT AND SHOULDER | Handling Code: |
|
| Limits From: | FM 1333 | Fund Cat: | 11 |
| Limits To: | SH 16 | Estimate: | $7,616,342 |
| Length: | 9.9 Miles | Actual: | $4,543,238 |
|
Back... |
Totals for 0421-04-028 | ||
| Length: | 9.9 Miles | ||
| Estimate: | $7,616,342 | ||
| Actual: | $4,543,238 | ||
CCSJ: 0613-02-046 | |||
| District: | San Antonio | Let Date: | FEB 2004 |
| Highway: | SH 16 | Let Status: | Actual |
| Project ID: | STP 2004(93) | CSJ: | 0613-02-046 |
| Description: | REHABILITATE AND WIDEN NARROW PAVEMENT AND SHOULDER | Handling Code: |
|
| Limits From: | 0.1 MI NORTH OF FM 476 | Fund Cat: | 11 |
| Limits To: | 0.6 MI SOUTH OF LOOP 282 | Estimate: | $4,230,221 |
| Length: | 1.9 Miles | Actual: | $3,698,816 |
|
Back... |
Totals for 0613-02-046 | ||
| Length: | 1.9 Miles | ||
| Estimate: | $4,230,221 | ||
| Actual: | $3,698,816 | ||
CCSJ: 2883-03-005 | |||
| District: | San Antonio | Let Date: | JUL 2004 |
| Highway: | FM 3175 | Let Status: | Actual |
| Project ID: | C 2883-3-5 | CSJ: | 2883-03-005 |
| Description: | REHAB & WIDEN NARROW PAVEMENT & SHOULDER | Handling Code: |
|
| Limits From: | 0.31 MI N OF IH 35 | Fund Cat: | 1 |
| Limits To: | FM 476 | Estimate: | $5,805,998 |
| Length: | 8.5 Miles | Actual: | $4,980,707 |
|
Award Status Bid Tabulations Back... |
Totals for 2883-03-005 | ||
| Length: | 8.5 Miles | ||
| Estimate: | $5,805,998 | ||
| Actual: | $4,980,707 | ||
|
| |