Detail Letting Schedule for Howard County (FY 2004)

 
 
Last Update: Tuesday, August 17, 2004
Howard County (FY 2004)

CCSJ: 0005-05-094

District: Abilene Let Date: JUL 2004
Highway: IH 20 Let Status: Actual
Project ID: CPM 5-5-94 CSJ: 0005-05-094
Description: BRIDGE CLEANING AND PAINTING, SPALL REPAIR, AND Handling
Code:
 
Limits From: NEAR FM 818 Fund Cat: 1
Limits To: SCURRY STREET IN BIG SPRING Estimate: $727,964
Length: 12.6 Miles Actual: $589,570
 
Award Status
Bid Tabulations
Back...

Totals for 0005-05-094
Length: 12.6 Miles
Estimate: $727,964
Actual: $589,570

CCSJ: 0005-06-105

District: Abilene Let Date: MAY 2004
Highway: IH 20 Let Status: Actual
Project ID: STP 2004(177)TE CSJ: 0005-06-105
Description: RIGHT OF WAY ACQUISITION AND UTILITIES Handling
Code:
XX
Limits From: @ 1.8 MILES WEST OF HOWARD/MITCHELL Fund Cat: 9
Limits To: NORTH AND SOUTH OF IH 20 Estimate:  
Length: 0.0 Miles Actual: $125,000
 
Back...

Totals for 0005-06-105
Length: 0.0 Miles
Estimate:  
Actual: $125,000

CCSJ: 0558-04-017

District: Abilene Let Date: APR 2004
Highway: FM 669 Let Status: Actual
Project ID: C 558-4-17 CSJ: 0558-04-017
Description: REHABILITATE AND WIDEN Handling
Code:
 
Limits From: BORDEN COUNTY LINE Fund Cat: 11
Limits To: 3 MILES NORTH OF FM 700 Estimate: $3,729,786
Length: 14.6 Miles Actual: $3,934,070
 
Back...

Totals for 0558-04-017
Length: 14.6 Miles
Estimate: $3,729,786
Actual: $3,934,070

CCSJ: 0908-12-015

District: Abilene Let Date: SEP 2003
Highway: CR Let Status: Actual
Project ID: BR 2001(711) CSJ: 0908-12-015
Description: REPLACE BRIDGE AND APPROACHES Handling
Code:
 
Limits From: ON CR 175 Fund Cat: 6
Limits To: AT WILD HORSE CK (PSN 1) Estimate: $160,869
Length: 0.1 Miles Actual: $153,697
 
Back...

Totals for 0908-12-015
Length: 0.1 Miles
Estimate: $160,869
Actual: $153,697

CCSJ: 0908-12-016

District: Abilene Let Date: APR 2004
Highway: CR Let Status: Actual
Project ID: BR 2002(44) CSJ: 0908-12-016
Description: REPLACE BRIDGE AND APPROACHES Handling
Code:
 
Limits From: BIRDWELL LN AT BEALS CK Fund Cat: 6
Limits To: . Estimate: $267,189
Length: 0.1 Miles Actual: $316,958
 
Back...

Totals for 0908-12-016
Length: 0.1 Miles
Estimate: $267,189
Actual: $316,958


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract