Detail Letting Schedule for Van Zandt County (FY 2004)
| Detail Letting Schedule for Van Zandt County (FY 2004) | ||||
| Last Update: Tuesday, August 17, 2004 |
| Van Zandt County (FY 2004) |
CCSJ: 0095-06-058 | |||
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 80 | Let Status: | Actual |
| Project ID: | CPM 95-6-58 | CSJ: | 0095-06-058 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 3.2 MI W OF FM 2965 (KAUFMAN C/L), | Fund Cat: | 1 |
| Limits To: | 0.1 MI E OF FM 2965 (WILLS PT CITY | Estimate: | $594,471 |
| Length: | 2.4 Miles | Actual: | $1,092,472 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 80 | Let Status: | Actual |
| Project ID: | CPM 96-4-61 | CSJ: | 0096-04-061 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.2 MI E OF SH 42 IN WHITE OAK, E | Fund Cat: | 1 |
| Limits To: | 0.1 MI EAST OF LP 281 IN LONGVIEW | Estimate: | $147,686 |
| Length: | 3.1 Miles | Actual: | $148,036 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 80 | Let Status: | Actual |
| Project ID: | CPM 96-6-69 | CSJ: | 0096-06-069 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MI E OF LP 281 IN LONGVIEW, E | Fund Cat: | 1 |
| Limits To: | HARRISON C/L, 0.5 MI E OF US 259 | Estimate: | $244,308 |
| Length: | 5.6 Miles | Actual: | $247,245 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 19 | Let Status: | Actual |
| Project ID: | CPM 108-1-24 | CSJ: | 0108-01-024 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MI S OF US 80, S | Fund Cat: | 1 |
| Limits To: | 0.1 MI N OF IH 20 IN CANTON | Estimate: | $188,422 |
| Length: | 7.2 Miles | Actual: | $194,300 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 19 | Let Status: | Actual |
| Project ID: | CPM 108-3-35 | CSJ: | 0108-03-035 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 2709, S | Fund Cat: | 1 |
| Limits To: | SH 31 IN ATHENS | Estimate: | $177,855 |
| Length: | 7.1 Miles | Actual: | $176,402 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 19 | Let Status: | Actual |
| Project ID: | CPM 108-6-50 | CSJ: | 0108-06-050 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | HENDERSON C/L, 3.6 MI N OF FM 837, S | Fund Cat: | 1 |
| Limits To: | 0.1 MI N OF FM 321 IN MONTALBA | Estimate: | $206,736 |
| Length: | 11.6 Miles | Actual: | $205,988 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 21 | Let Status: | Actual |
| Project ID: | CPM 118-5-19 | CSJ: | 0118-05-019 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MI E OF US 69 IN ALTO, E | Fund Cat: | 1 |
| Limits To: | NACOGDOCHES C/L, 2.0 MI E OF FM 2708 | Estimate: | $154,206 |
| Length: | 6.9 Miles | Actual: | $156,004 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 287 | Let Status: | Actual |
| Project ID: | CPM 122-5-15 | CSJ: | 0122-05-015 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 321 IN TENNESSEE COLONY, E | Fund Cat: | 1 |
| Limits To: | SH 19 NW OF PALESTINE | Estimate: | $189,152 |
| Length: | 9.5 Miles | Actual: | $191,226 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 84 | Let Status: | Actual |
| Project ID: | CPM 123-6-26 | CSJ: | 0123-06-026 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MI E OF US 259 IN MT ENTERPRISE, E | Fund Cat: | 1 |
| Limits To: | SHELBY C/L, 1.0 MI E OF FM 1971 | Estimate: | $242,288 |
| Length: | 9.9 Miles | Actual: | $246,311 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 259 | Let Status: | Actual |
| Project ID: | CPM 138-5-48 | CSJ: | 0138-05-048 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.5 MI S OF FM 1798, S | Fund Cat: | 1 |
| Limits To: | 0.2 MI S OF US 84, IN MT. ENTERPRISE | Estimate: | $235,994 |
| Length: | 6.1 Miles | Actual: | $242,414 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 31 | Let Status: | Actual |
| Project ID: | CPM 163-4-51 | CSJ: | 0163-04-051 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.4 MI W OF SH 198, E | Fund Cat: | 1 |
| Limits To: | 0.6 MI E OF SH 198 IN MALAKOFF | Estimate: | $41,711 |
| Length: | 1.0 Miles | Actual: | $42,035 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 31 | Let Status: | Actual |
| Project ID: | CPM 163-4-52 | CSJ: | 0163-04-052 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.6 MI E OF FM 317, E | Fund Cat: | 1 |
| Limits To: | FM 2494 IN ATHENS | Estimate: | $96,880 |
| Length: | 2.4 Miles | Actual: | $99,093 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 31 | Let Status: | Actual |
| Project ID: | CPM 164-1-65 | CSJ: | 0164-01-065 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 19 IN ATHENS, E | Fund Cat: | 1 |
| Limits To: | 0.1 MI W OF FM 317 (ATHENS LOOP) | Estimate: | $137,145 |
| Length: | 3.0 Miles | Actual: | $139,651 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 31 | Let Status: | Actual |
| Project ID: | CPM 164-1-66 | CSJ: | 0164-01-066 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.5 MI E OF FM 773, E | Fund Cat: | 1 |
| Limits To: | 1.1 MI W OF FM 1803(S) (WBL) | Estimate: | $9,932 |
| Length: | 0.6 Miles | Actual: | $10,154 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 31 | Let Status: | Actual |
| Project ID: | CPM 164-2-37 | CSJ: | 0164-02-037 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 1.1 MI E OF FM 773, E | Fund Cat: | 1 |
| Limits To: | FM 314 (WBL) | Estimate: | $153,269 |
| Length: | 7.3 Miles | Actual: | $157,439 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 271 | Let Status: | Actual |
| Project ID: | CPM 165-1-96 | CSJ: | 0165-01-096 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.7 MI S OF IH 20 IN E TEXAS CENTER,SW | Fund Cat: | 1 |
| Limits To: | 0.6 MI N OF FM 2015 IN TYLER (SBL) | Estimate: | $147,023 |
| Length: | 6.0 Miles | Actual: | $152,531 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 271 | Let Status: | Actual |
| Project ID: | CPM 165-2-55 | CSJ: | 0165-02-055 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.2 MI S OF IH 20, SW | Fund Cat: | 1 |
| Limits To: | 0.7 MI S OF IH 20 IN E TEXAS CENTER(SBL) | Estimate: | $17,002 |
| Length: | 0.7 Miles | Actual: | $17,674 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 69 | Let Status: | Actual |
| Project ID: | CPM 190-5-54 | CSJ: | 0190-05-054 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | LP 323 IN TYLER, SE | Fund Cat: | 1 |
| Limits To: | SP 147 (GENTRY PARKWAY) | Estimate: | $119,884 |
| Length: | 1.7 Miles | Actual: | $121,390 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 69 | Let Status: | Actual |
| Project ID: | CPM 190-6-10 | CSJ: | 0190-06-010 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SP 147 (GENTRY PARKWAY), S | Fund Cat: | 1 |
| Limits To: | SH 64 (WEST ERWIN) IN TYLER | Estimate: | $32,570 |
| Length: | 0.8 Miles | Actual: | $32,730 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 2493 | Let Status: | Actual |
| Project ID: | CPM 191-3-18 | CSJ: | 0191-03-018 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 2813 IN GRESHAM, S | Fund Cat: | 1 |
| Limits To: | CHEROKEE C/L (O.3 MI S OF FM 344) | Estimate: | $187,431 |
| Length: | 7.4 Miles | Actual: | $188,774 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 2493 | Let Status: | Actual |
| Project ID: | CPM 191-4-6 | CSJ: | 0191-04-006 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SMITH C/L(.3MI S OF FM 344 IN BULLARD)SE | Fund Cat: | 1 |
| Limits To: | US 69 | Estimate: | $37,781 |
| Length: | 1.3 Miles | Actual: | $36,715 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 69 | Let Status: | Actual |
| Project ID: | CPM 199-3-38 | CSJ: | 0199-03-038 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.4 MI S OF SH 21 IN ALTO, (END C&G), S | Fund Cat: | 1 |
| Limits To: | 1.5 MI S OF FM 1911 (WELLS N CITY LIM) | Estimate: | $818,205 |
| Length: | 14.2 Miles | Actual: | $830,738 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 79 | Let Status: | Actual |
| Project ID: | CPM 205-7-64 | CSJ: | 0205-07-064 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | JACKSON ST (.6 S OF SH155)IN P'STINE,SW | Fund Cat: | 1 |
| Limits To: | TILE FACTORY RD (1.4 MI S OF FM 1990) | Estimate: | $151,144 |
| Length: | 3.7 Miles | Actual: | $154,754 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 79 | Let Status: | Actual |
| Project ID: | CPM 206-1-42 | CSJ: | 0206-01-042 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 2.0 MI N. OF FM 2574, SOUTH | Fund Cat: | 1 |
| Limits To: | 0.6 MI S. OF SH 155 (JACKSON ST.) | Estimate: | $312,049 |
| Length: | 10.9 Miles | Actual: | $319,272 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 79 | Let Status: | Actual |
| Project ID: | CPM 206-3-57 | CSJ: | 0206-03-057 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 347 IN JACKSONVILLE, W | Fund Cat: | 1 |
| Limits To: | 1.1 MI E OF FM 747 (W CITY LIM) | Estimate: | $38,672 |
| Length: | 0.9 Miles | Actual: | $39,779 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 79 | Let Status: | Actual |
| Project ID: | CPM 206-4-35 | CSJ: | 0206-04-035 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 2.6 MI W OF SH 110, W | Fund Cat: | 1 |
| Limits To: | DOGWOOD ST IN P'STINE, 0.3 E OF SH 204 | Estimate: | $133,262 |
| Length: | 4.8 Miles | Actual: | $137,332 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 79 | Let Status: | Actual |
| Project ID: | CPM 206-4-36 | CSJ: | 0206-04-036 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 1.2 MI W SH 204 IN JACKSONVILLE, W | Fund Cat: | 1 |
| Limits To: | NECHES ST (0.1 MI E OF US 69) | Estimate: | $52,537 |
| Length: | 1.2 Miles | Actual: | $53,126 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 79 | Let Status: | Actual |
| Project ID: | CPM 206-5-26 | CSJ: | 0206-05-026 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MI W OF SH 110 IN NEW SUMMERFIELD,W | Fund Cat: | 1 |
| Limits To: | 2.6 MI W OF SH 110 | Estimate: | $74,612 |
| Length: | 2.6 Miles | Actual: | $77,080 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 79 | Let Status: | Actual |
| Project ID: | CPM 206-6-23 | CSJ: | 0206-06-023 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 2.7 MI SW OF FM 839, SOUTH | Fund Cat: | 1 |
| Limits To: | 0.8 MI NORTH OF SH 42 | Estimate: | $21,658 |
| Length: | 0.7 Miles | Actual: | $22,123 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 79 | Let Status: | Actual |
| Project ID: | CPM 206-7-53 | CSJ: | 0206-07-053 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.3 MI SW OF LP 571, SW | Fund Cat: | 1 |
| Limits To: | 2.7 MI SW OF FM 839 | Estimate: | $156,439 |
| Length: | 5.6 Miles | Actual: | $161,340 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | BU 79-F | Let Status: | Actual |
| Project ID: | CPM 206-8-9 | CSJ: | 0206-08-009 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 13 IN HENDERSON, S | Fund Cat: | 1 |
| Limits To: | US 79 | Estimate: | $72,209 |
| Length: | 1.8 Miles | Actual: | $68,833 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | BS 64-E | Let Status: | Actual |
| Project ID: | CPM 206-8-10 | CSJ: | 0206-08-010 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 13 IN HENDERSON, N | Fund Cat: | 1 |
| Limits To: | SH 64 | Estimate: | $36,349 |
| Length: | 1.1 Miles | Actual: | $35,163 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | US 69 | Let Status: | Actual |
| Project ID: | CPM 245-6-71 | CSJ: | 0245-06-071 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 64 (WEST ERWIN) IN TYLER, S&E | Fund Cat: | 1 |
| Limits To: | SH 64 & SH 155 (4TH & 5TH) | Estimate: | $95,187 |
| Length: | 2.0 Miles | Actual: | $95,320 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 64 | Let Status: | Actual |
| Project ID: | CPM 245-6-72 | CSJ: | 0245-06-072 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | US 69 (BROADWAY), EAST | Fund Cat: | 1 |
| Limits To: | 0.1 MI E OF LP 323 IN TYLER | Estimate: | $87,374 |
| Length: | 2.0 Miles | Actual: | $89,183 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | BU 79-F | Let Status: | Actual |
| Project ID: | CPM 245-18-9 | CSJ: | 0245-18-009 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | US 79 IN HENDERSON, W | Fund Cat: | 1 |
| Limits To: | FM 13 | Estimate: | $24,662 |
| Length: | 0.9 Miles | Actual: | $24,877 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | BS 64-E | Let Status: | Actual |
| Project ID: | CPM 245-18-10 | CSJ: | 0245-18-010 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 64 IN HENDERSON, SE | Fund Cat: | 1 |
| Limits To: | FM 13 | Estimate: | $32,947 |
| Length: | 1.1 Miles | Actual: | $33,033 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 110 | Let Status: | Actual |
| Project ID: | CPM 345-2-42 | CSJ: | 0345-02-042 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.9 MI W OF FM 346 IN TROUP, E & S | Fund Cat: | 1 |
| Limits To: | FM 1089 (CHEROKEE C/L) | Estimate: | $67,208 |
| Length: | 1.2 Miles | Actual: | $66,978 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 149 | Let Status: | Actual |
| Project ID: | CPM 393-1-80 | CSJ: | 0393-01-080 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | O.2 MI S OF SH 322 (ESTES PKWY), SE | Fund Cat: | 1 |
| Limits To: | RUSK C/L (0.3 MI NW OF FM 782) | Estimate: | $325,032 |
| Length: | 9.2 Miles | Actual: | $329,462 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 154 | Let Status: | Actual |
| Project ID: | CPM 401-2-28 | CSJ: | 0401-02-028 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | HOPKINS C/L (2.O MI N OF FM 17), SE | Fund Cat: | 1 |
| Limits To: | 1.0 MI NE OF FM 288 (N END LAKE FORK BR) | Estimate: | $272,944 |
| Length: | 7.8 Miles | Actual: | $277,871 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 17 | Let Status: | Actual |
| Project ID: | CPM 443-3-14 | CSJ: | 0443-03-014 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | IH 20, SW | Fund Cat: | 1 |
| Limits To: | SH 64 IN CANTON | Estimate: | $32,746 |
| Length: | 1.5 Miles | Actual: | $32,604 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 14 | Let Status: | Actual |
| Project ID: | CPM 492-3-29 | CSJ: | 0492-03-029 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 154, SE | Fund Cat: | 1 |
| Limits To: | FM 2869 | Estimate: | $237,718 |
| Length: | 12.2 Miles | Actual: | $238,996 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | IH 20 | Let Status: | Actual |
| Project ID: | CPM 495-4-56 | CSJ: | 0495-04-056 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MI W OF SH 110, E | Fund Cat: | 1 |
| Limits To: | O.3 MI E OF SH 110 (RAMPS & FRS) | Estimate: | $14,915 |
| Length: | 0.7 Miles | Actual: | $14,366 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 155 | Let Status: | Actual |
| Project ID: | CPM 520-7-17 | CSJ: | 0520-07-017 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | S END NECHES RV BR IN COFFEE CITY, S | Fund Cat: | 1 |
| Limits To: | 0.5 MI S OF FM 2215 IN BERRYVILLE | Estimate: | $225,434 |
| Length: | 4.1 Miles | Actual: | $230,074 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 155 | Let Status: | Actual |
| Project ID: | CPM 520-8-60 | CSJ: | 0520-08-060 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.487 MI S OF FM 2267 | Fund Cat: | 1 |
| Limits To: | 0.145 MI N OF FM 315 | Estimate: | $117,460 |
| Length: | 9.6 Miles | Actual: | |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 16 | Let Status: | Actual |
| Project ID: | CPM 522-3-21 | CSJ: | 0522-03-021 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 64, E | Fund Cat: | 1 |
| Limits To: | IH 20 | Estimate: | $84,478 |
| Length: | 6.2 Miles | Actual: | $86,567 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 274 | Let Status: | Actual |
| Project ID: | CPM 561-2-30 | CSJ: | 0561-02-030 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | KAUFMAN C/L, 2.8 MI N OF SH 334, S | Fund Cat: | 1 |
| Limits To: | SH 334 IN SEVEN POINTS | Estimate: | $51,239 |
| Length: | 2.8 Miles | Actual: | $52,035 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 322 | Let Status: | Actual |
| Project ID: | CPM 594-1-13 | CSJ: | 0594-01-013 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MI S OF SH 149 IN LAKEPORT, S | Fund Cat: | 1 |
| Limits To: | FM 2011 IN ELDERVILLE | Estimate: | $229,866 |
| Length: | 3.3 Miles | Actual: | $231,412 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 322 | Let Status: | Actual |
| Project ID: | CPM 594-2-22 | CSJ: | 0594-02-022 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 2011 IN ELDERVILLE, S | Fund Cat: | 1 |
| Limits To: | 0.1 MI N OF FM 1249 | Estimate: | $60,922 |
| Length: | 1.9 Miles | Actual: | $62,241 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 47 | Let Status: | Actual |
| Project ID: | CPM 646-2-21 | CSJ: | 0646-02-021 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MI S OF US 80 IN WILLS POINT, S | Fund Cat: | 1 |
| Limits To: | 0.1 MI N OF IH 20 | Estimate: | $97,726 |
| Length: | 5.6 Miles | Actual: | $100,780 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 198 | Let Status: | Actual |
| Project ID: | CPM 646-5-25 | CSJ: | 0646-05-025 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 1.9 MI S OF FM 316 IN PAYNE SPRINGS, S | Fund Cat: | 1 |
| Limits To: | SH 31 IN MALAKOFF | Estimate: | $149,543 |
| Length: | 7.2 Miles | Actual: | $149,533 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 49 | Let Status: | Actual |
| Project ID: | CPM 647-1-21 | CSJ: | 0647-01-021 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | US 69 IN MINEOLA, NE | Fund Cat: | 1 |
| Limits To: | FM 14 IN PINE MILLS | Estimate: | $227,352 |
| Length: | 13.7 Miles | Actual: | $231,047 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 515 | Let Status: | Actual |
| Project ID: | CPM 657-1-15 | CSJ: | 0657-01-015 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 69 IN COKE, E | Fund Cat: | 1 |
| Limits To: | 0.1 MI WEST OF SH 37 IN WINNSBORO | Estimate: | $183,476 |
| Length: | 8.2 Miles | Actual: | $185,288 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 515 | Let Status: | Actual |
| Project ID: | CPM 657-3-12 | CSJ: | 0657-03-012 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 154, E | Fund Cat: | 1 |
| Limits To: | FM 1483 | Estimate: | $20,539 |
| Length: | 1.1 Miles | Actual: | $20,789 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 515 | Let Status: | Actual |
| Project ID: | CPM 657-4-7 | CSJ: | 0657-04-007 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 1483, E | Fund Cat: | 1 |
| Limits To: | FM 69 IN COKE | Estimate: | $131,266 |
| Length: | 6.8 Miles | Actual: | $131,724 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 3441 | Let Status: | Actual |
| Project ID: | CPM 701-1-20 | CSJ: | 0701-01-020 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 31 IN MALAKOFF, S | Fund Cat: | 1 |
| Limits To: | FM 59 IN CROSSROADS | Estimate: | $204,795 |
| Length: | 9.1 Miles | Actual: | $206,428 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 69 | Let Status: | Actual |
| Project ID: | CPM 766-5-4 | CSJ: | 0766-05-004 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | HOPKINS C/L, 2.6 MI N OF FM 515, S | Fund Cat: | 1 |
| Limits To: | FM 515 IN COKE | Estimate: | $46,553 |
| Length: | 2.6 Miles | Actual: | $48,361 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 855 | Let Status: | Actual |
| Project ID: | CPM 1161-2-8 | CSJ: | 1161-02-008 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MI N OF US 175 IN CUNEY, N & E | Fund Cat: | 1 |
| Limits To: | 1.1 MI WEST OF US 69 IN MOUNT SELMAN | Estimate: | $165,526 |
| Length: | 11.4 Miles | Actual: | $167,043 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 177 | Let Status: | Actual |
| Project ID: | CPM 1161-3-5 | CSJ: | 1161-03-005 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MI EAST OF US 69 IN MOUNT SELMAN, E | Fund Cat: | 1 |
| Limits To: | 0.1 MI WEST OF SH 135 IN MIXON | Estimate: | $73,204 |
| Length: | 4.7 Miles | Actual: | $73,666 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 859 | Let Status: | Actual |
| Project ID: | CPM 1171-2-12 | CSJ: | 1171-02-012 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MI SOUTH OF IH 20, S | Fund Cat: | 1 |
| Limits To: | SH 64 NEAR CANTON | Estimate: | $24,765 |
| Length: | 1.5 Miles | Actual: | $25,214 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 14 | Let Status: | Actual |
| Project ID: | CPM 1390-1-9 | CSJ: | 1390-01-009 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 37, S | Fund Cat: | 1 |
| Limits To: | SH 154 | Estimate: | $91,809 |
| Length: | 5.4 Miles | Actual: | $93,335 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | LP 323 | Let Status: | Actual |
| Project ID: | CPM 1790-2-34 | CSJ: | 1790-02-034 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.6 MI S OF US 271 (AMERICAN LEGION RD)S | Fund Cat: | 1 |
| Limits To: | 0.6 MI N OF SH 31 (COMMERCE ST) IN TYLER | Estimate: | $107,805 |
| Length: | 2.2 Miles | Actual: | $111,317 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | LP 323 | Let Status: | Actual |
| Project ID: | CPM 2075-1-44 | CSJ: | 2075-01-044 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 0.1 MI W OF US 69(N) IN TYLER, E | Fund Cat: | 1 |
| Limits To: | 0.5 MI EAST OF US 271 (AMERICAN LEGION) | Estimate: | $247,754 |
| Length: | 4.1 Miles | Actual: | $251,604 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 2661 | Let Status: | Actual |
| Project ID: | CPM 2654-1-15 | CSJ: | 2654-01-015 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | 5.5 MI S OF SH 31, S | Fund Cat: | 1 |
| Limits To: | SH 155 | Estimate: | $118,972 |
| Length: | 4.4 Miles | Actual: | $117,521 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | FM 2661 | Let Status: | Actual |
| Project ID: | CPM 2654-1-16 | CSJ: | 2654-01-016 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 64, SOUTH | Fund Cat: | 1 |
| Limits To: | SH 31 | Estimate: | $53,256 |
| Length: | 3.2 Miles | Actual: | $54,187 |
| District: | Tyler | Let Date: | NOV 2003 |
| Highway: | SH 57 | Let Status: | Actual |
| Project ID: | CPM 3618-1-3 | CSJ: | 3618-01-003 |
| Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SH 155, E | Fund Cat: | 1 |
| Limits To: | FM 2493 IN TYLER | Estimate: | $77,783 |
| Length: | 1.5 Miles | Actual: | $78,906 |
|
Back... |
Totals for 0095-06-058 | ||
|---|---|---|---|
| Length: | 308.3 Miles | ||
| Estimate: | $9,211,138 | ||
| Actual: | $9,709,886 | ||
CCSJ: 1673-02-014 | |||
| District: | Tyler | Let Date: | JUN 2004 |
| Highway: | FM 1861 | Let Status: | Actual |
| Project ID: | C 1673-2-14 | CSJ: | 1673-02-014 |
| Description: | REHABILITATE ROADWAY | Handling Code: |
|
| Limits From: | 1.7 MI E OF FM 316(HENDERSON C/L) E | Fund Cat: | 1 |
| Limits To: | SH 19 | Estimate: | $793,528 |
| Length: | 6.0 Miles | Actual: | $702,593 |
| District: | Tyler | Let Date: | JUN 2004 |
| Highway: | FM 1861 | Let Status: | Actual |
| Project ID: | C 1673-3-7 | CSJ: | 1673-03-007 |
| Description: | REHABILITATE ROADWAY | Handling Code: |
|
| Limits From: | FM 316, E | Fund Cat: | 1 |
| Limits To: | 1.7 MI E OF FM 316,(VAN ZANDT C/L) | Estimate: | $184,348 |
| Length: | 1.7 Miles | Actual: | $162,116 |
|
Bid Tabulations Back... |
Totals for 1673-02-014 | ||
| Length: | 7.7 Miles | ||
| Estimate: | $977,876 | ||
| Actual: | $864,709 | ||
CCSJ: 2477-01-007 | |||
| District: | Tyler | Let Date: | DEC 2003 |
| Highway: | FM 1395 | Let Status: | Actual |
| Project ID: | STP 2004(73) | CSJ: | 2477-01-007 |
| Description: | REHABILITATE ROADWAY | Handling Code: |
|
| Limits From: | FM 47, SE | Fund Cat: | 1 |
| Limits To: | FM 859 | Estimate: | $2,019,546 |
| Length: | 6.9 Miles | Actual: | $1,484,434 |
|
Back... |
Totals for 2477-01-007 | ||
| Length: | 6.9 Miles | ||
| Estimate: | $2,019,546 | ||
| Actual: | $1,484,434 | ||
|
| |