Letting Schedule for June, 2004 (FY 2004)

 
 
Last Update: Tuesday, August 17, 2004
June, 2004 (FY 2004) (see Links)
SEP 2003 | OCT 2003 | NOV 2003 | DEC 2003 | JAN 2004 | FEB 2004 | MAR 2004 | APR 2004 | MAY 2004 | JUN 2004 | JUL 2004 | AUG 2004
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0228-05-057 Andrews/
Odessa
US 385 Actual $59,460 8 TEXTURIZE SHOULDERS
0548-05-040 Andrews/
Odessa
SH 176 Actual $122,889 8 EXTEND DRAINAGE STRUCTURES TO CLEAR ZONE & CONSTRUCT SAFETY
0200-01-058 Angelina/
Lufkin
US 69 Actual $3,407,739 1 OVERLAY EXISTING ROADWAY AND CONSTRUCT CONTINUOUS TWO - WAY
0911-00-046 Angelina/
Lufkin
VA Actual $94,000 9 CONSTRUCT APPROACHES TO EXISTING BRIDGE
0016-07-118 Bexar/
San Antonio
IH 35 Actual $2,335,690 1 2" ACP OVERLAY & PAVEMENT MARKINGS ON MAINLANES
0915-00-096 Bexar/
San Antonio
VA Actual $1,900,000 1 DISTRICTWIDE TRAFFIC MANAGEMENT (FY2004) (CAT 10B)
0111-08-113 Brazoria/
Houston
SH 288 Actual $253,737 1 REHABILITATE LIGHTING CONDUIT, CONDUCTORS AND ELECTRICAL
0598-02-019 Brazoria/
Houston
SH 288 Actual $25,548,569 1 BUILD FOUR OVERPASS STRUCTURES
0912-31-146 Brazoria/
Houston
VA Actual $236,950 1 SPALL REPAIR (NON - SITE SPECIFIC)
0912-31-148 Brazoria/
Houston
VA Actual $299,920 1 CRACK SEAL (NON - SITE SPECIFIC)
1024-01-057 Chambers/
Beaumont
FM 565 Actual $3,752,749 1 REHABILITATE EXISTING ROADWAY
1024-02-036 Chambers/
Beaumont
FM 1405 Actual $306,299 11 CONSTRUCT TURN LANE AT PLANT ENTRANCE
0450-01-010 Cherokee/
Tyler
SH 204 Actual $624,860 1 EDGE TREATMENT
0054-04-093 Coleman/
Brownwood
US 84 Actual $1,449,177 1 WIDEN BRIDGE AND APPROACHES
0091-05-047 Collin/
Dallas
SH 289 Actual $161,000 5 RIGHT OF WAY ACQUISITION
0918-24-106 Collin/
Dallas
CS Actual $170,000 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0070-03-053 Concho/
San Angelo
US 87 Actual $4,190,495 4 UPGRADE TO TEXAS TRUNK SYSTEM STANDARDS
0094-07-036 Dallas/
Dallas
SH 183 Actual $962,195 1 PAVEMENT REPAIR
0353-05-109 Dallas/
Dallas
LP 12 Actual $2,050,644 1 CONCRETE PAVEMENT REPAIR AND OVERLAY
0353-06-044 Dallas/
Dallas
SH 114 Actual $160,000 11 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0353-06-045 Dallas/
Dallas
SH 114 Actual $170,000 11 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-45-697 Dallas/
Dallas
VA Actual $553,886 7 CBD SIGNAGE AND WAYFINDING
1047-03-059 Dallas/
Dallas
FM 1382 Actual $715,498 1 REHABILITATION OF EXISTING ROADWAY
0196-01-094 Denton/
Dallas
IH 35E Actual $1,657,311 1 REPAIR OF PAVEMENT STRUCTURE ON FRONTAGE ROAD
0913-00-066 Dewitt/
Yoakum
VA Actual $380,896 1 TRAFFIC CONTROL DEVICES
1697-02-015 Eastland/
Brownwood
FM 2214 Actual $3,358,211 1 REHAB ROADWAY - NEW ALIGNMENT, WIDENING, STRUCTURES,
3064-01-005 Ector/
Odessa
FM 554 Actual $27,874 8 INSTALL FLASHING BEACON & ADVANCE WARNING SIGNAL / SIGNS
2552-03-033 El Paso/
El Paso
LP 375 Actual $38,688,781 2 CONSTRUCT MAIN LANES & INTERCHANGES
2552-03-041 El Paso/
El Paso
LP 375 Actual $23,778,317 1 CONSTRUCT MAIN LANES & INTERCHANGES
1317-03-020 Ellis/
Dallas
FM 1722 Actual $150,000 11 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0027-12-062 Fort Bend/
Houston
US 59 Actual 152,570,260 12 CONSTRUCT 8 MAINLANES W / 2 - WAY HOV LANES, 2 - 3 LANE FRONTAGE
0192-01-080 Fort Bend/
Houston
SH 6 Actual $1,143,218 5 INSTALL ARTERIAL TRAFFIC MANAGEMENT SYSTEM
0838-02-017 Fort Bend/
Houston
FM 442 Actual $1,313,167 1 ADD SHOULDER AND OVERLAY
0912-34-101 Fort Bend/
Houston
CS Actual $285,166 5 SYNCHRONIZATION AND INTERCONNECTION OF TRAFFIC SIGNALS
1415-03-007 Fort Bend/
Houston
FM 2759 Actual $2,258,928 1 BASE REPAIR, WIDEN SUBGRADE, TRAFFIC SIGNALS, ACP OVERLAY
0367-06-054 Galveston/
Houston
SH 87 Actual $29,839,589 1 CONSTRUCT THIRD FERRY LANDING
0216-02-049 Guadalupe/
San Antonio
SH 46 Actual $879,416 1 TRAFFIC SIGNALS, PLANING, SEAL, STRUCTURES, ACP, PAVEMENT
0097-02-024 Hardeman/
Childress
SH 6 Actual $4,367,768 11 REPLACE RAILROAD UNDERPASS
0500-03-523 Harris/
Houston
IH 45 Actual $373,840 1 FULL DEPTH REPAIR, MILL AND ACP OVERLAY (NASA 1)
0500-03-525 Harris/
Houston
IH 45 Actual $1,435,957 1 MILL, RCRI, ASPHALT OVERLAY AND RESTRIPE
0502-01-184 Harris/
Houston
IH 610 Actual $19,369,036 1 BONDED CONCRETE OVERLAY OF MAINLANES AND RECONSTRUCT
0912-00-273 Harris/
Houston
VA Actual $1,318,326 1 INSTALL TRAFFIC SIGNALS (NON - SITE SPECIFIC)
0912-00-274 Harris/
Houston
VA Actual $100,000 1 MRDC (MOBILE RETROREFLECTIVITY DATA COLLECTION) FOR PAVEMENT
0912-71-532 Harris/
Houston
CS Actual $8,515,040 7 CONSTRUCT GRADE SEPARATION CONSISTING OF 4 LANES
0912-71-860 Harris/
Houston
VA Actual $8,800,000 1 ATM CONVERSION FOR TRANSTAR
0912-71-878 Harris/
Houston
VA Actual $9,383,758 5 FY 2004 NEW BUS SERVICE FOR METRO
0805-01-013 Hays/
Austin
RM 150 Actual $1,266,028 1 CONSTRUCT LEFT TURN LANE
0255-06-051 Hidalgo/
Pharr
US 281 Actual $698,653 10 INSTALL WEIGH IN MOTION STATION
0528-01-077 Hidalgo/
Pharr
SH 107 Actual $4,471,023 8 RECONSTRUCT AND WIDEN TO 6 LANE DIVIDED W / RAISED MEDIAN AND
0089-04-071 Jackson/
Yoakum
US 59 Actual $4,012,062 11 HIGHWAY SAFETY IMPROVEMENTS
0003-04-046 Jeff Davis/
El Paso
IH 10 Actual $22,754,976 1 REHABILITATION OF MAINLANES
0259-04-033 Johnson/
Fort Worth
US 67 Actual $760,145 1 MILL AND OVERLAY
2213-01-011 Johnson/
Fort Worth
FM 2331 Actual $2,275,424 1 REHABILITATE EXISTING BASE AND ADD 2" HMAC SURFACE
0018-02-049 La Salle/
Laredo
IH 35 Actual $8,979,400 10 CONSTRUCTION OF REHABILIATION OF EXISTING ROAD
0045-09-074 Lamar/
Paris
BU 82-H Actual $2,212,467 11 INSTALL CONTINUOUS TURN LANE
0447-01-054 Live Oak/
Corpus Christi
US 59 Actual $4,651,793 1 ADD PASSING LANES
0166-07-053 Madison/
Bryan
SH 75 Actual $398,766 1 PAVEMENT REPAIRS, PLACEMENT OF SURFACE TREATMENT & PAVEMENT
0421-01-037 Medina/
San Antonio
SH 173 Actual $367,686 1 INSTALL INTERSECTION FLASHING BEACON & ADD LEFT TURN LANE
0185-04-033 Milam/
Bryan
SH 36 Actual $26,407,253 6 CONSTRUCT 4 LANE DIVIDED HWY W / NEW BRIDGE ON LITTLE RIVER
0110-04-164 Montgomery/
Houston
IH 45 Actual $28,723,503 2 WIDEN TO 8 MAIN LANES WITH FRONTAGE ROADS, TMS AND PROVISION
1416-03-012 Montgomery/
Houston
FM 1486 Actual $2,885,466 6 BRIDGE REPLACEMENT
2847-01-009 Navarro/
Dallas
FM 2859 Actual $3,832,260 1 REHABILITATE EXISTING ROAD
0617-01-164 Nueces/
Corpus Christi
SH 358 Actual $1,355,333 10 LANDSCAPE ROADWAY
0916-00-050 Nueces/
Corpus Christi
VA Actual $432,778 1 SIGN REPLACEMENT
0866-07-011 Pecos/
Odessa
US 385 Actual $11,596 8 EXTEND DRAINAGE STRUCTURES FO CLEAR ZONE & CONSTRUCT SAFETY
0213-04-039 Polk/
Lufkin
US 190 Actual $99,302 1 INSTALL TRAFFIC SIGNALS
0907-25-003 Real/
San Angelo
VA Actual $2,788,859 10 REPAIR FLOOD DAMAGED CULVERTS, DITCHES AND SLOPES
0138-04-042 Rusk/
Tyler
US 259 Actual $418,749 1 MICRO SURFACING AND PAVEMENT MARKINGS
0304-02-031 Sabine/
Lufkin
SH 87 Actual $1,267,519 6 REPLACE BRIDGE AND APPROACHES
0910-00-063 Smith/
Tyler
VA Actual $327,387 1 FY 2004 THERMOPLASTIC PAVEMENT MARKINGS PROGRAM
0014-16-245 Tarrant/
Fort Worth
IH 35W Actual $243,401 1 INSTALL TRAFFIC SIGNAL
0014-16-247 Tarrant/
Fort Worth
IH 35W Actual $791,778 1 REDECK BRIDGE AND REPAIR SUBSTRUCTURE
0902-48-312 Tarrant/
Fort Worth
VA Actual $46,098 5 ROUTE MAP & SIGNS
0902-48-462 Tarrant/
Fort Worth
CR Actual $432,016 6 REPLACE BRIDGE AND APPROACHES
0908-00-059 Taylor/
Abilene
VA Actual $247,142 1 FLASHING BEACONS
2574-01-038 Tom Green/
San Angelo
RM 584 Actual $1,371,331 1 ASPHALTIC CONCRETE PAVEMENT OVERLAY & CONCRETE INTERSECTIONS
0914-00-194 Travis/
Austin
VA Actual $309,888 1 SIGNING / TRUCK LANE RESTRICTION
1673-02-014 Van Zandt/
Tyler
FM 1861 Actual $864,709 1 REHABILITATE ROADWAY
0420-11-015 Wharton/
Yoakum
FM 1300 Actual $2,092,356 1 RESTORE ROADWAY
0100-03-065 Wilson/
San Antonio
US 181 Actual $107,822 10 LANDSCAPE DEVELOPMENT
0463-06-022 Winkler/
Odessa
SH 302 Actual $247,179 8 EXTENDING STRUCTURES AND SAFETY END TREATMENTS
0037-02-044 Zavala/
Laredo
US 83 Actual $3,022,953 1 REHABILITATION OF AN EXISTING ROADWAY AND REPAIR, CLEANING


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract