Detail Letting Schedule for Bexar County (FY 2005)
Detail Letting Schedule for Bexar County (FY 2005) | ||||
Last Update: Monday, August 15, 2005 |
Bexar County (FY 2005) |
CCSJ: 0017-10-216 | |||
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(309) | CSJ: | 0017-10-216 |
Description: | LANDSCAPE, UPDATE TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | DOLOROSA/LA TRINIDAD | Fund Cat: | 1 |
Limits To: | DURANGO/LA TRINIDAD | Estimate: | $299,374 |
Length: | 0.2 Miles | Actual: | $343,948 |
Award Status Bid Tabulations Back... |
Totals for 0017-10-216 | ||
---|---|---|---|
Length: | 0.2 Miles | ||
Estimate: | $299,374 | ||
Actual: | $343,948 | ||
CCSJ: 0024-08-121 | |||
District: | San Antonio | Let Date: | AUG 2005 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | C 24-8-121 | CSJ: | 0024-08-121 |
Description: | LANDSCAPING AND IRRIGATION SYSTEM | Handling Code: |
|
Limits From: | AT VAR LOC FROM MISSOURI-PACIFIC RR | Fund Cat: | 10 |
Limits To: | NOGALITOS | Estimate: | $360,204 |
Length: | 0.0 Miles | Actual: | $386,154 |
District: | San Antonio | Let Date: | AUG 2005 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | C 73-8-153 | CSJ: | 0073-08-153 |
Description: | LANDSCAPING AND IRRIGATION SYSTEM | Handling Code: |
|
Limits From: | AT VARIOUS LOCATIONS | Fund Cat: | 10 |
Limits To: | FROM IH 35 TO BASSE ROAD | Estimate: | $400,751 |
Length: | 0.0 Miles | Actual: | $362,681 |
List Showing Order Proposal Req Form Bidders List Bid Tabulations Back... |
Totals for 0024-08-121 | ||
Length: | 0.0 Miles | ||
Estimate: | $760,955 | ||
Actual: | $748,835 | ||
CCSJ: 0025-02-167 | |||
District: | San Antonio | Let Date: | DEC 2004 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 10-4(340) | CSJ: | 0025-02-167 |
Description: | MILL, BASE REPAIR, SEALCOAT, OV & PAV MRK | Handling Code: |
NC |
Limits From: | S. FLORES | Fund Cat: | 1 |
Limits To: | PRESA | Estimate: | $1,672,300 |
Length: | 1.4 Miles | Actual: | $1,575,990 |
Back... |
Totals for 0025-02-167 | ||
Length: | 1.4 Miles | ||
Estimate: | $1,672,300 | ||
Actual: | $1,575,990 | ||
CCSJ: 0025-02-168 | |||
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0017-02-066 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.5 MI W OF MEDINA RIVER | Fund Cat: | 1 |
Limits To: | 0.1 MI N OF IH 410 | Estimate: | $463,377 |
Length: | 3.3 Miles | Actual: | $350,967 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0017-03-059 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | SH 132 | Fund Cat: | 1 |
Limits To: | BENTON CITY ROAD | Estimate: | $1,683,185 |
Length: | 8.5 Miles | Actual: | $1,278,037 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0017-05-087 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | .6 MILE S OF SH 132 | Fund Cat: | 1 |
Limits To: | .5 MILE N OF SH 132 | Estimate: | $191,639 |
Length: | 1.1 Miles | Actual: | $144,778 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0017-06-077 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.2 MI N OF FM 3352 | Fund Cat: | 1 |
Limits To: | 0.2 MI S OF US 57 | Estimate: | $416,037 |
Length: | 2.4 Miles | Actual: | $294,300 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0017-09-088 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.4 MI W OF LP 353 | Fund Cat: | 1 |
Limits To: | 0.1 MI E OF LP 353 | Estimate: | $41,240 |
Length: | 0.5 Miles | Actual: | $38,307 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0024-05-087 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.8 MI E OF HONDO CREEK | Fund Cat: | 1 |
Limits To: | 3.8 MI E OF HONDO CREEK | Estimate: | $526,152 |
Length: | 3.0 Miles | Actual: | $425,350 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0024-07-051 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | MONTGOMERY ROAD | Fund Cat: | 1 |
Limits To: | 0.3 MI E OF MEDIO CREEK | Estimate: | $804,244 |
Length: | 4.8 Miles | Actual: | $593,015 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0024-08-120 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | HUNT LANE | Fund Cat: | 1 |
Limits To: | IH 410 | Estimate: | $108,581 |
Length: | 0.7 Miles | Actual: | $83,001 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0025-02-168 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.3 MI W OF IH 410 | Fund Cat: | 1 |
Limits To: | 0.2 MI E OF FM 2538 | Estimate: | $1,987,507 |
Length: | 13.0 Miles | Actual: | $1,637,132 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0025-03-084 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | SCHWAB | Fund Cat: | 1 |
Limits To: | 0.4 MI E OF FM 775 | Estimate: | $200,680 |
Length: | 1.3 Miles | Actual: | $150,313 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0072-06-067 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | CIBOLO CREEK | Fund Cat: | 1 |
Limits To: | BEXAR COUNTY LINE | Estimate: | $1,144,100 |
Length: | 6.9 Miles | Actual: | $843,920 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0072-07-053 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | KENDALL COUNTY LINE | Fund Cat: | 1 |
Limits To: | 1.3 MI S OF BOERNE STAGE ROAD | Estimate: | $1,161,188 |
Length: | 7.4 Miles | Actual: | $836,744 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0072-08-116 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 1.3 MI S OF BOERNE STAGE ROAD | Fund Cat: | 1 |
Limits To: | 3.1 MI S OF BOERNE STAGE ROAD | Estimate: | $281,408 |
Length: | 1.8 Miles | Actual: | $201,591 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0072-08-117 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | COUNTY ROAD 127 | Fund Cat: | 1 |
Limits To: | 1.0 MI S OF COUNTY ROAD 127 | Estimate: | $127,169 |
Length: | 1.0 Miles | Actual: | $101,700 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0073-03-056 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.6 MI S OF FM 1470 | Fund Cat: | 1 |
Limits To: | 0.9 MI S OF FM 1470 | Estimate: | $41,855 |
Length: | 0.3 Miles | Actual: | $40,240 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0073-05-063 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 3.0 MI S OF US 281 | Fund Cat: | 1 |
Limits To: | 5.0 MI S OF US 281 | Estimate: | $307,108 |
Length: | 2.0 Miles | Actual: | $222,160 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0073-09-028 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 1.2 MI S OF PRIEST-MATHIS | Fund Cat: | 1 |
Limits To: | SOUTHTON ROAD | Estimate: | $961,347 |
Length: | 8.6 Miles | Actual: | $706,864 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0142-15-022 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | KERR COUNTY LINE | Fund Cat: | 1 |
Limits To: | 0.8 MI E OF US 87 | Estimate: | $305,553 |
Length: | 1.9 Miles | Actual: | $234,279 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0253-04-133 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | COMAL COUNTY LINE | Fund Cat: | 1 |
Limits To: | MARSHALL ROAD | Estimate: | $667,799 |
Length: | 4.1 Miles | Actual: | $536,172 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0291-09-126 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.7 MI N OF RANCH PKWY | Fund Cat: | 1 |
Limits To: | 0.3 MI S OF RANCH PKWY | Estimate: | $175,130 |
Length: | 1.0 Miles | Actual: | $136,901 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0521-05-130 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | IH 35 | Fund Cat: | 1 |
Limits To: | VALLEY HI DRIVE | Estimate: | $649,007 |
Length: | 5.0 Miles | Actual: | $489,663 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0521-05-131 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.9 MI E OF CHAVANEAUX RD | Fund Cat: | 1 |
Limits To: | SH 16 | Estimate: | $590,423 |
Length: | 4.4 Miles | Actual: | $442,316 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0535-01-056 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.2 MI W OF BS 123 | Fund Cat: | 1 |
Limits To: | 0.2 MI E OF SH 123 | Estimate: | $130,805 |
Length: | 1.2 Miles | Actual: | $96,279 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 10-4(341) | CSJ: | 0535-02-037 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | FM 2438 | Fund Cat: | 1 |
Limits To: | GREGORY FORD ROAD | Estimate: | $73,845 |
Length: | 1.3 Miles | Actual: | $56,676 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0535-02-038 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 1.0 MILES W OF FM 2438 | Fund Cat: | 1 |
Limits To: | FM 2438 | Estimate: | $115,320 |
Length: | 1.0 Miles | Actual: | $82,589 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0535-02-039 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | GREGORY FORD RD | Fund Cat: | 1 |
Limits To: | FM 1104 | Estimate: | $364,026 |
Length: | 1.5 Miles | Actual: | $266,821 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0535-02-040 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.7 MI W OF SH 80 | Fund Cat: | 1 |
Limits To: | SAN MARCOS RIVER | Estimate: | $276,443 |
Length: | 2.1 Miles | Actual: | $205,292 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0613-01-054 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.1 MI N OF LP 1604 | Fund Cat: | 1 |
Limits To: | 0.1 MI N OF SMITH ROAD | Estimate: | $317,032 |
Length: | 1.7 Miles | Actual: | $264,106 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 0613-02-052 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | TIMBER CREEK RD | Fund Cat: | 1 |
Limits To: | WAXWING RD | Estimate: | $75,385 |
Length: | 0.4 Miles | Actual: | $67,846 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | STP 2005(375)SFT | CSJ: | 2452-02-075 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | BABCOCK ROAD | Fund Cat: | 1 |
Limits To: | REGENCY BLVD | Estimate: | $103,072 |
Length: | 1.4 Miles | Actual: | $94,762 |
Bid Tabulations Back... |
Totals for 0025-02-168 | ||
Length: | 93.6 Miles | ||
Estimate: | $14,290,657 | ||
Actual: | $10,922,121 | ||
CCSJ: 0073-08-147 | |||
District: | San Antonio | Let Date: | DEC 2004 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 37-2(80) | CSJ: | 0017-02-065 |
Description: | SC, BASE, OV & PAV MARK ON COLLECTOR DISTRIB'S & CONNECTORS | Handling Code: |
NC |
Limits From: | 0.27 MI SOUTH OF LP 410 | Fund Cat: | 1 |
Limits To: | 0.27 MI NORTH OF LP 410 | Estimate: | $772,687 |
Length: | 0.5 Miles | Actual: | $759,509 |
District: | San Antonio | Let Date: | DEC 2004 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | IM 37-2(80) | CSJ: | 0073-08-147 |
Description: | SEALCOAT, BASE REPAIR, OVERLAY, & PAVEMENT MARKINGS | Handling Code: |
NC |
Limits From: | SALADO CREEK BRIDGE | Fund Cat: | 1 |
Limits To: | 0.4 MI SOUTH OF LP 1604 | Estimate: | $2,421,359 |
Length: | 7.3 Miles | Actual: | $2,280,296 |
Back... |
Totals for 0073-08-147 | ||
Length: | 7.8 Miles | ||
Estimate: | $3,194,046 | ||
Actual: | $3,039,805 | ||
CCSJ: 0073-08-150 | |||
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2005(287)SFT | CSJ: | 0073-08-142 |
Description: | CONVERT MEDIAN BARRIER, MILL, SEAL COAT, PFC OV AND PAV'T | Handling Code: |
|
Limits From: | JOSEPHINE STREET | Fund Cat: | 1 |
Limits To: | PEARL PARKWAY | Estimate: | $635,263 |
Length: | 0.4 Miles | Actual: | $906,109 |
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2005(413) | CSJ: | 0073-08-150 |
Description: | MILL, SEAL COAT, PFC OV, & PAV'T MARKINGS | Handling Code: |
|
Limits From: | 0.4 MI N OF HILDEBRAND | Fund Cat: | 1 |
Limits To: | JOSEPHINE STREET | Estimate: | $1,606,740 |
Length: | 2.1 Miles | Actual: | $2,093,622 |
Bid Tabulations Back... |
Totals for 0073-08-150 | ||
Length: | 2.5 Miles | ||
Estimate: | $2,242,003 | ||
Actual: | $2,999,731 | ||
CCSJ: 0291-12-002 | |||
District: | San Antonio | Let Date: | JAN 2005 |
Highway: | SP 66 | Let Status: | Actual |
Project ID: | C 291-12-2 | CSJ: | 0291-12-002 |
Description: | LANDSCAPING | Handling Code: |
|
Limits From: | SH 16 | Fund Cat: | 10 |
Limits To: | APPLEWHITE ROAD | Estimate: | $219,300 |
Length: | 1.5 Miles | Actual: | $221,108 |
Back... |
Totals for 0291-12-002 | ||
Length: | 1.5 Miles | ||
Estimate: | $219,300 | ||
Actual: | $221,108 | ||
CCSJ: 0521-02-036 | |||
District: | San Antonio | Let Date: | FEB 2005 |
Highway: | LP 13 | Let Status: | Actual |
Project ID: | CPM 521-2-36 | CSJ: | 0521-02-036 |
Description: | PLANING, SEAL, OVERLAY, AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | LP 353 | Fund Cat: | 1 |
Limits To: | IH 35 | Estimate: | $1,169,578 |
Length: | 2.0 Miles | Actual: | $1,014,586 |
District: | San Antonio | Let Date: | FEB 2005 |
Highway: | FM 3487 | Let Status: | Actual |
Project ID: | C 2344-1-6 | CSJ: | 2344-01-006 |
Description: | PLANING, ONE - COURSE SURFACE TREATMENT, ACP OVERLAY, & | Handling Code: |
|
Limits From: | @ THE FM 1957 INTERSECTION | Fund Cat: | 1 |
Limits To: | . | Estimate: | $57,641 |
Length: | 0.1 Miles | Actual: | $52,981 |
Back... |
Totals for 0521-02-036 | ||
Length: | 2.1 Miles | ||
Estimate: | $1,227,219 | ||
Actual: | $1,067,567 | ||
CCSJ: 0521-04-190 | |||
District: | San Antonio | Let Date: | JAN 2005 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | NH 2005(136) | CSJ: | 0521-04-190 |
Description: | EXPAND TO 10 LN FRWY & TMS | Handling Code: |
|
Limits From: | IN SAN ANTONIO FROM E OF INGRAM RD | Fund Cat: | 2 |
Limits To: | CALLAGHAN RD | Estimate: | $55,401,561 |
Length: | 2.4 Miles | Actual: | $73,529,779 |
District: | San Antonio | Let Date: | JAN 2005 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | NH 2005(161) | CSJ: | 0521-04-258 |
Description: | REIMBURSABLE UTILITY ADJUSTMENT - SAWS | Handling Code: |
|
Limits From: | IN SAN ANTONIO FROM E OF INGRAM RD | Fund Cat: | ROW |
Limits To: | CALLAGHAN RD | Estimate: | $948,964 |
Length: | 0.0 Miles | Actual: | $1,478,842 |
District: | San Antonio | Let Date: | JAN 2005 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | NH 2005(275) | CSJ: | 0521-04-266 |
Description: | REIMBURSEABLE UTILITY ADJUSTMENTS - CITY OF LEON VALLEY | Handling Code: |
|
Limits From: | IN SAN ANTONIO FROM E OF INGRAM RD | Fund Cat: | 2 |
Limits To: | CALLAGHAN RD | Estimate: | $62,471 |
Length: | 0.0 Miles | Actual: | $81,463 |
Back... |
Totals for 0521-04-190 | ||
Length: | 2.4 Miles | ||
Estimate: | $56,412,996 | ||
Actual: | $75,090,084 | ||
CCSJ: 0521-04-223 | |||
District: | San Antonio | Let Date: | OCT 2004 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | NH 2002(683) | CSJ: | 0521-04-223 |
Description: | CONSTR CONNECTORS & TMS | Handling Code: |
|
Limits From: | INTERCHANGE AT US 281 (PHASE 2) | Fund Cat: | 2 |
Limits To: | FROM MCCULLOUGH TO NACOGDOCHES | Estimate: | 151,803,189 |
Length: | 2.7 Miles | Actual: | 147,076,332 |
District: | San Antonio | Let Date: | OCT 2004 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | NH 2004(764) | CSJ: | 0521-04-262 |
Description: | DRAINAGE IMPROVEMENTS W / CITY OF SAN ANTONIO AT NACOGDOCHES | Handling Code: |
|
Limits From: | INTERCHANGE AT US 281 | Fund Cat: | 1 |
Limits To: | FROM US 281 TO NACOGDOCHES | Estimate: | $2,183,090 |
Length: | 2.1 Miles | Actual: | $4,877,296 |
District: | San Antonio | Let Date: | OCT 2004 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | NH 2002(683) | CSJ: | 0521-04-263 |
Description: | ADJUSTMENT OF UTILITY IN CONSTRUCTION CONTRACT | Handling Code: |
|
Limits From: | IH 410 INTERCHANGE | Fund Cat: | ROW |
Limits To: | AT US 281 | Estimate: | $2,143,497 |
Length: | 2.1 Miles | Actual: | $2,764,034 |
Back... |
Totals for 0521-04-223 | ||
Length: | 6.9 Miles | ||
Estimate: | 156,129,776 | ||
Actual: | 154,717,662 | ||
CCSJ: 0613-01-053 | |||
District: | San Antonio | Let Date: | DEC 2004 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | CPM 613-1-53 | CSJ: | 0613-01-053 |
Description: | BASE REPAIR, OVERLAY & PAVEMENT MARKINGS | Handling Code: |
NC |
Limits From: | LP 1604 | Fund Cat: | 1 |
Limits To: | ATASCOSA COUNTY LINE | Estimate: | $1,787,596 |
Length: | 4.0 Miles | Actual: | $1,993,107 |
Back... |
Totals for 0613-01-053 | ||
Length: | 4.0 Miles | ||
Estimate: | $1,787,596 | ||
Actual: | $1,993,107 | ||
CCSJ: 0915-00-120 | |||
District: | San Antonio | Let Date: | APR 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 915-00-120 | CSJ: | 0915-00-120 |
Description: | CONSTRUCT LEFT TURN LANES | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $800,000 |
Length: | 0.0 Miles | Actual: | $800,000 |
Back... |
Totals for 0915-00-120 | ||
Length: | 0.0 Miles | ||
Estimate: | $800,000 | ||
Actual: | $800,000 | ||
CCSJ: 0915-12-247 | |||
District: | San Antonio | Let Date: | JAN 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 98(289)MM | CSJ: | 0915-12-247 |
Description: | WIDEN BRIDGE FOR LEFT TURN LANE TO MISSION PARKWAY | Handling Code: |
|
Limits From: | IN SAN ANTONIO ON MISSION RD | Fund Cat: | 7 |
Limits To: | AT SAN ANTONIO RIVER & MISSION PARK | Estimate: | $410,951 |
Length: | 0.1 Miles | Actual: | $607,405 |
Back... |
Totals for 0915-12-247 | ||
Length: | 0.1 Miles | ||
Estimate: | $410,951 | ||
Actual: | $607,405 | ||
CCSJ: 0915-12-275 | |||
District: | San Antonio | Let Date: | JAN 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2005(137)MM | CSJ: | 0915-12-275 |
Description: | CONSTRUCT TURN LNS AT 5 INTERSECT (US 281 / JONES - MALTSBERGER) | Handling Code: |
|
Limits From: | ON THOUSAND OAKS AT FIVE INTERSECTI | Fund Cat: | 7 |
Limits To: | BETWEEN US 281 & JONES-MALTSBERGER | Estimate: | $1,249,656 |
Length: | 0.9 Miles | Actual: | $1,510,986 |
Back... |
Totals for 0915-12-275 | ||
Length: | 0.9 Miles | ||
Estimate: | $1,249,656 | ||
Actual: | $1,510,986 | ||
CCSJ: 0915-12-299 | |||
District: | San Antonio | Let Date: | JAN 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2003(419)MM | CSJ: | 0915-12-299 |
Description: | REHAB & WIDEN FOR CLTL (CURB, SDWK, DRAINAGE, BIKE LANE) | Handling Code: |
|
Limits From: | ON TEZEL RD FROM RIDGE PATH | Fund Cat: | 7 |
Limits To: | OLD TEZEL | Estimate: | $6,467,302 |
Length: | 1.2 Miles | Actual: | $7,742,055 |
District: | San Antonio | Let Date: | JAN 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2003(419)MM | CSJ: | 0915-12-300 |
Description: | REHAB & WIDEN FOR CLTL (CURB, SDWLK, DRAINAGE) | Handling Code: |
|
Limits From: | ON TEZEL RD FROM TIMBER PATH | Fund Cat: | 7 |
Limits To: | RIDGE PATH | Estimate: | $4,015,524 |
Length: | 0.7 Miles | Actual: | $4,647,353 |
Back... |
Totals for 0915-12-299 | ||
Length: | 1.9 Miles | ||
Estimate: | $10,482,826 | ||
Actual: | $12,389,408 | ||
CCSJ: 0915-12-327 | |||
District: | San Antonio | Let Date: | JAN 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(146)MM | CSJ: | 0915-12-327 |
Description: | REHAB & WIDEN NARROW PAVEMENT (SIDEWALKS) | Handling Code: |
|
Limits From: | ON S FLORES FROM 0.06 MI N OF MALON | Fund Cat: | 7 |
Limits To: | OCTAVIA | Estimate: | $3,855,173 |
Length: | 0.5 Miles | Actual: | $4,533,598 |
Back... |
Totals for 0915-12-327 | ||
Length: | 0.5 Miles | ||
Estimate: | $3,855,173 | ||
Actual: | $4,533,598 | ||
CCSJ: 0915-12-356 | |||
District: | San Antonio | Let Date: | FEB 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2005(177)MM | CSJ: | 0915-12-356 |
Description: | CONSTRUCT TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | ON FOSTER RD AT CANDLEMEADOW | Fund Cat: | 7 |
Limits To: | . | Estimate: | $140,268 |
Length: | 0.2 Miles | Actual: | $118,046 |
District: | San Antonio | Let Date: | FEB 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2005(177)MM | CSJ: | 0915-12-357 |
Description: | CONSTRUCT TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | ON FOSTER RD AT SUMMER FEST | Fund Cat: | 7 |
Limits To: | . | Estimate: | $148,084 |
Length: | 0.2 Miles | Actual: | $127,795 |
Back... |
Totals for 0915-12-356 | ||
Length: | 0.4 Miles | ||
Estimate: | $288,352 | ||
Actual: | $245,841 | ||
CCSJ: 0915-12-364 | |||
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 99(798)MM | CSJ: | 0915-12-364 |
Description: | REHAB & WIDEN NARROW PAVEMENT W / TURN LN (CURB, SDWK, DRAINAGE, | Handling Code: |
NC |
Limits From: | ON MCCULLOUGH FROM UNION PACIFIC | Fund Cat: | 7 |
Limits To: | TO BASSE ROAD | Estimate: | $2,601,129 |
Length: | 0.7 Miles | Actual: | $2,654,213 |
Bid Tabulations Back... |
Totals for 0915-12-364 | ||
Length: | 0.7 Miles | ||
Estimate: | $2,601,129 | ||
Actual: | $2,654,213 | ||
CCSJ: 0915-12-413 | |||
District: | San Antonio | Let Date: | JUN 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2005(800)MM | CSJ: | 0915-12-413 |
Description: | ALAMO AREA COMMUTE SOLUTION PGM - FY 2005 | Handling Code: |
XX |
Limits From: | IN SAN ANTONIO/BEXAR CO AREA | Fund Cat: | 7 |
Limits To: | . | Estimate: | $231,000 |
Length: | 0.0 Miles | Actual: | $231,000 |
Back... |
Totals for 0915-12-413 | ||
Length: | 0.0 Miles | ||
Estimate: | $231,000 | ||
Actual: | $231,000 | ||
CCSJ: 1437-01-032 | |||
District: | San Antonio | Let Date: | SEP 2004 |
Highway: | FM 1346 | Let Status: | Actual |
Project ID: | STP 2004(702) | CSJ: | 1437-01-032 |
Description: | WIDEN ROADWAY & ADD SHOULDERS | Handling Code: |
|
Limits From: | LP 1604 | Fund Cat: | 1 |
Limits To: | WILSON C/L | Estimate: | $7,145,865 |
Length: | 7.0 Miles | Actual: | $7,359,954 |
Back... |
Totals for 1437-01-032 | ||
Length: | 7.0 Miles | ||
Estimate: | $7,145,865 | ||
Actual: | $7,359,954 | ||
CCSJ: 1477-01-032 | |||
District: | San Antonio | Let Date: | OCT 2004 |
Highway: | FM 1516 | Let Status: | Actual |
Project ID: | CPM 1477-1-32 | CSJ: | 1477-01-032 |
Description: | BASE REPAIR, SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 3502 | Fund Cat: | 1 |
Limits To: | FM 1346 | Estimate: | $1,348,541 |
Length: | 6.6 Miles | Actual: | $1,281,096 |
Back... |
Totals for 1477-01-032 | ||
Length: | 6.6 Miles | ||
Estimate: | $1,348,541 | ||
Actual: | $1,281,096 | ||
CCSJ: 3544-04-005 | |||
District: | San Antonio | Let Date: | SEP 2004 |
Highway: | SH 211 | Let Status: | Actual |
Project ID: | C 3544-4-5 | CSJ: | 3544-04-005 |
Description: | OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 90 | Fund Cat: | 1 |
Limits To: | FM 1957 | Estimate: | $2,285,887 |
Length: | 3.7 Miles | Actual: | $2,345,411 |
Back... |
Totals for 3544-04-005 | ||
Length: | 3.7 Miles | ||
Estimate: | $2,285,887 | ||
Actual: | $2,345,411 |
|
|