Detail Letting Schedule for Cameron County (FY 2005)
Detail Letting Schedule for Cameron County (FY 2005) | ||||
Last Update: Monday, August 15, 2005 |
Cameron County (FY 2005) |
CCSJ: 0039-06-031 | |||
District: | Pharr | Let Date: | SEP 2004 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2005(55) | CSJ: | 0039-06-031 |
Description: | CONSTRUCT 4 LANE DIVIDED URBAN SECTION | Handling Code: |
|
Limits From: | HILDAGO/CAMERON CO LINE | Fund Cat: | 11 |
Limits To: | FM 800 | Estimate: | $9,394,721 |
Length: | 4.9 Miles | Actual: | $11,254,991 |
Back... |
Totals for 0039-06-031 | ||
---|---|---|---|
Length: | 4.9 Miles | ||
Estimate: | $9,394,721 | ||
Actual: | $11,254,991 | ||
CCSJ: 0039-08-086 | |||
District: | Pharr | Let Date: | SEP 2004 |
Highway: | US 77 | Let Status: | Actual |
Project ID: | MG 2003(303) | CSJ: | 0039-08-086 |
Description: | WIDEN TO 6 LANES | Handling Code: |
|
Limits From: | 0.6 MI SOUTH OF SH 100 | Fund Cat: | 4 |
Limits To: | 0.4 MI SOUTH OF BUS 77-X | Estimate: | $17,828,683 |
Length: | 2.8 Miles | Actual: | $21,896,273 |
Back... |
Totals for 0039-08-086 | ||
Length: | 2.8 Miles | ||
Estimate: | $17,828,683 | ||
Actual: | $21,896,273 | ||
CCSJ: 0039-08-087 | |||
District: | Pharr | Let Date: | JUL 2005 |
Highway: | US 77 | Let Status: | Actual |
Project ID: | MG 2005(288) | CSJ: | 0039-08-087 |
Description: | WIDEN TO 6 LANES | Handling Code: |
|
Limits From: | 0.143 MI SOUTH OF FM 511 | Fund Cat: | 3 |
Limits To: | 0.611 MI SOUTH OF SH 100 | Estimate: | $29,467,146 |
Length: | 4.1 Miles | Actual: | $32,978,382 |
Award Status Bid Tabulations Back... |
Totals for 0039-08-087 | ||
Length: | 4.1 Miles | ||
Estimate: | $29,467,146 | ||
Actual: | $32,978,382 | ||
CCSJ: 0039-10-065 | |||
District: | Pharr | Let Date: | JAN 2005 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | CPM 38-2-28 | CSJ: | 0038-02-028 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | ZAPATA/WEBB COUNTY LINE | Fund Cat: | 1 |
Limits To: | 9.9 MI SOUTH | Estimate: | $268,801 |
Length: | 9.9 Miles | Actual: | $244,143 |
District: | Pharr | Let Date: | JAN 2005 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | CPM 38-3-27 | CSJ: | 0038-03-027 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 9.9 MI S OF ZAPATA/WEBB CL | Fund Cat: | 1 |
Limits To: | JUAREZ AVE. IN SAN YGNACIO | Estimate: | $202,268 |
Length: | 7.0 Miles | Actual: | $186,467 |
District: | Pharr | Let Date: | JAN 2005 |
Highway: | BU 83-N | Let Status: | Actual |
Project ID: | CPM 38-8-1 | CSJ: | 0038-08-001 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 83 W | Fund Cat: | 1 |
Limits To: | US 83 | Estimate: | $10,953 |
Length: | 1.0 Miles | Actual: | $9,669 |
District: | Pharr | Let Date: | JAN 2005 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | CPM 39-1-64 | CSJ: | 0039-01-064 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 0.21 MI W OF FM 1430 (W) | Fund Cat: | 1 |
Limits To: | HIDALGO/STARR COUNTY LINE | Estimate: | $790,050 |
Length: | 11.6 Miles | Actual: | $731,570 |
District: | Pharr | Let Date: | JAN 2005 |
Highway: | SH 4 | Let Status: | Actual |
Project ID: | CPM 39-10-65 | CSJ: | 0039-10-065 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 5.11 MI E OF FM 1419 | Fund Cat: | 1 |
Limits To: | 16.54 MI E OF FM 1419 | Estimate: | $391,508 |
Length: | 11.4 Miles | Actual: | $291,714 |
District: | Pharr | Let Date: | JAN 2005 |
Highway: | SH 285 | Let Status: | Actual |
Project ID: | CPM 482-1-28 | CSJ: | 0482-01-028 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | JIM HOGG/BROOKS CL | Fund Cat: | 1 |
Limits To: | OAK AVE IN HEBBRONVILLE | Estimate: | $309,723 |
Length: | 10.1 Miles | Actual: | $279,539 |
District: | Pharr | Let Date: | JAN 2005 |
Highway: | SH 285 | Let Status: | Actual |
Project ID: | CPM 482-2-28 | CSJ: | 0482-02-028 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 800' W OF SH 339 | Fund Cat: | 1 |
Limits To: | JIM HOGG/BROOKS CL | Estimate: | $257,326 |
Length: | 8.3 Miles | Actual: | $230,908 |
District: | Pharr | Let Date: | JAN 2005 |
Highway: | FM 510 | Let Status: | Actual |
Project ID: | CPM 775-1-16 | CSJ: | 0775-01-016 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 100 | Fund Cat: | 1 |
Limits To: | FM 106 | Estimate: | $166,415 |
Length: | 5.4 Miles | Actual: | $150,527 |
District: | Pharr | Let Date: | JAN 2005 |
Highway: | FM 510 | Let Status: | Actual |
Project ID: | CPM 1057-3-31 | CSJ: | 1057-03-031 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 106 | Fund Cat: | 1 |
Limits To: | FM 187 | Estimate: | $223,064 |
Length: | 7.4 Miles | Actual: | $206,684 |
Back... |
Totals for 0039-10-065 | ||
Length: | 72.1 Miles | ||
Estimate: | $2,620,108 | ||
Actual: | $2,331,221 | ||
CCSJ: 0039-19-042 | |||
District: | Pharr | Let Date: | SEP 2004 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | MG 2004(548) | CSJ: | 0039-18-105 |
Description: | WIDEN TO 6 LANES | Handling Code: |
|
Limits From: | 0.5 MILES EAST OF FM 1425 | Fund Cat: | 2 |
Limits To: | HIDALGO-CAMERON COUNTY LINE | Estimate: | $3,309,053 |
Length: | 0.5 Miles | Actual: | $3,268,921 |
District: | Pharr | Let Date: | SEP 2004 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | MG 2004(548) | CSJ: | 0039-19-042 |
Description: | WIDEN TO 6 LANES | Handling Code: |
|
Limits From: | 0.23 MI WEST OF RABB ROAD | Fund Cat: | 10 |
Limits To: | LEWIS LANE | Estimate: | $78,486,559 |
Length: | 7.1 Miles | Actual: | $84,936,064 |
District: | Pharr | Let Date: | SEP 2004 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | MG 2004(548) | CSJ: | 0039-19-057 |
Description: | WIDEN TO 6 LANES | Handling Code: |
|
Limits From: | CAMERON - HIDALGO COUNTY LINE | Fund Cat: | 3 |
Limits To: | 0.23 MILES WEST OF RABB ROAD | Estimate: | $9,352,803 |
Length: | 1.4 Miles | Actual: | $9,115,215 |
Back... |
Totals for 0039-19-042 | ||
Length: | 9.0 Miles | ||
Estimate: | $91,148,415 | ||
Actual: | $97,320,200 | ||
CCSJ: 0220-07-051 | |||
District: | Pharr | Let Date: | JUN 2005 |
Highway: | SH 48 | Let Status: | Actual |
Project ID: | MG 2004(778) | CSJ: | 0220-07-051 |
Description: | WIDEN TO 4 LANE | Handling Code: |
|
Limits From: | SHRIMP BASIN, NE | Fund Cat: | 4 |
Limits To: | SH 100 | Estimate: | $14,300,403 |
Length: | 9.4 Miles | Actual: | $16,827,865 |
Bid Tabulations Back... |
Totals for 0220-07-051 | ||
Length: | 9.4 Miles | ||
Estimate: | $14,300,403 | ||
Actual: | $16,827,865 | ||
CCSJ: 0327-08-077 | |||
District: | Pharr | Let Date: | DEC 2004 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | CPM 220-3-19 | CSJ: | 0220-03-019 |
Description: | MICRO SURFACE | Handling Code: |
|
Limits From: | FM 506 EAST | Fund Cat: | 1 |
Limits To: | 0.7 MI WEST OF FM 732 | Estimate: | $316,971 |
Length: | 9.7 Miles | Actual: | $404,367 |
District: | Pharr | Let Date: | DEC 2004 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | CPM 220-4-34 | CSJ: | 0220-04-034 |
Description: | MICRO SURFACE | Handling Code: |
|
Limits From: | 0.7 MILES WEST OF FM 732, EAST | Fund Cat: | 1 |
Limits To: | FM 1732 | Estimate: | $155,990 |
Length: | 4.6 Miles | Actual: | $198,374 |
District: | Pharr | Let Date: | DEC 2004 |
Highway: | BU 77-X | Let Status: | Actual |
Project ID: | CPM 327-8-77 | CSJ: | 0327-08-077 |
Description: | MICRO SURFACE | Handling Code: |
|
Limits From: | LOOP 499 SOUTH | Fund Cat: | 1 |
Limits To: | FM 507 | Estimate: | $340,885 |
Length: | 3.4 Miles | Actual: | $425,344 |
District: | Pharr | Let Date: | DEC 2004 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | CPM 342-1-71 | CSJ: | 0342-01-071 |
Description: | MICRO SURFACE | Handling Code: |
|
Limits From: | FM 1426 EAST | Fund Cat: | 1 |
Limits To: | FM 88 | Estimate: | $886,494 |
Length: | 9.1 Miles | Actual: | $1,122,898 |
District: | Pharr | Let Date: | DEC 2004 |
Highway: | SH 495 | Let Status: | Actual |
Project ID: | CPM 865-1-94 | CSJ: | 0865-01-094 |
Description: | MICRO SURFACE | Handling Code: |
|
Limits From: | SH 107 EAST | Fund Cat: | 1 |
Limits To: | FM 1926 | Estimate: | $352,472 |
Length: | 5.1 Miles | Actual: | $420,955 |
Back... |
Totals for 0327-08-077 | ||
Length: | 31.9 Miles | ||
Estimate: | $2,052,812 | ||
Actual: | $2,571,938 | ||
CCSJ: 0331-04-056 | |||
District: | Pharr | Let Date: | SEP 2004 |
Highway: | PR 100 | Let Status: | Actual |
Project ID: | C 331-4-56 | CSJ: | 0331-04-056 |
Description: | CATHODIC PROTECTION | Handling Code: |
|
Limits From: | ON QUEEN ISABELLA CAUSEWAY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $2,500,000 |
Length: | 2.4 Miles | Actual: | $1,296,103 |
Back... |
Totals for 0331-04-056 | ||
Length: | 2.4 Miles | ||
Estimate: | $2,500,000 | ||
Actual: | $1,296,103 | ||
CCSJ: 0630-01-044 | |||
District: | Pharr | Let Date: | NOV 2004 |
Highway: | SH 345 | Let Status: | Actual |
Project ID: | C 630-1-44 | CSJ: | 0630-01-044 |
Description: | LANDSCAPE & IRRIGATION IMPROVEMENTS | Handling Code: |
|
Limits From: | US 77/83 | Fund Cat: | 10 |
Limits To: | FM 3462 | Estimate: | $157,796 |
Length: | 2.5 Miles | Actual: | $136,164 |
Back... |
Totals for 0630-01-044 | ||
Length: | 2.5 Miles | ||
Estimate: | $157,796 | ||
Actual: | $136,164 | ||
CCSJ: 0684-01-061 | |||
District: | Pharr | Let Date: | DEC 2004 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | CPM 39-3-91 | CSJ: | 0039-03-091 |
Description: | ASPHALTIC CONCRETE PAVEMENT OVERLAY | Handling Code: |
|
Limits From: | 136' E OF STEWART RD | Fund Cat: | 1 |
Limits To: | US 83 | Estimate: | $1,079,701 |
Length: | 6.1 Miles | Actual: | $1,114,284 |
District: | Pharr | Let Date: | DEC 2004 |
Highway: | US 77 | Let Status: | Actual |
Project ID: | CPM 39-7-222 | CSJ: | 0039-07-222 |
Description: | ASPHALTIC CONCRETE PAVEMENT OVERLAY | Handling Code: |
|
Limits From: | 4.325 MI S OF WILLACY/CAMERON CL | Fund Cat: | 1 |
Limits To: | 0.341 MI S OF FM 2994 | Estimate: | $1,065,800 |
Length: | 5.8 Miles | Actual: | $1,187,261 |
District: | Pharr | Let Date: | DEC 2004 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | CPM 255-9-87 | CSJ: | 0255-09-087 |
Description: | ASPHALTIC CONCRETE PAVEMENT OVERLAY | Handling Code: |
|
Limits From: | BUS 83 SOUTH | Fund Cat: | 1 |
Limits To: | 0.42 MI N OF US 281 | Estimate: | $1,184,573 |
Length: | 6.6 Miles | Actual: | $1,235,955 |
District: | Pharr | Let Date: | DEC 2004 |
Highway: | US 77 | Let Status: | Actual |
Project ID: | CPM 327-8-78 | CSJ: | 0327-08-078 |
Description: | ASPHALTIC CONCRETE PAVEMENT OVERLAY | Handling Code: |
|
Limits From: | WILLACY/CAMERON COUNTY LINE SOUTH | Fund Cat: | 1 |
Limits To: | 4.325 MI SOUTH | Estimate: | $759,636 |
Length: | 4.3 Miles | Actual: | $844,534 |
District: | Pharr | Let Date: | DEC 2004 |
Highway: | SH 100 | Let Status: | Actual |
Project ID: | CPM 331-1-36 | CSJ: | 0331-01-036 |
Description: | ASPHALTIC CONCRETE PAVEMENT OVERLAY | Handling Code: |
|
Limits From: | 0.55 MI E OF FM 1847 | Fund Cat: | 1 |
Limits To: | 6.0 MI E OF FM 1847 | Estimate: | $892,978 |
Length: | 5.5 Miles | Actual: | $1,040,204 |
District: | Pharr | Let Date: | DEC 2004 |
Highway: | SH 336 | Let Status: | Actual |
Project ID: | CPM 621-1-92 | CSJ: | 0621-01-092 |
Description: | ASPHALTIC CONCRETE PAVEMENT OVERLAY | Handling Code: |
|
Limits From: | 155' N OF LA VISTA RD. SOUTH | Fund Cat: | 1 |
Limits To: | US 83 | Estimate: | $374,285 |
Length: | 2.5 Miles | Actual: | $387,815 |
District: | Pharr | Let Date: | DEC 2004 |
Highway: | SH 345 | Let Status: | Actual |
Project ID: | CPM 630-1-45 | CSJ: | 0630-01-045 |
Description: | ASPHALTIC CONCRETE PAVEMENT OVERLAY | Handling Code: |
|
Limits From: | 0.45 MI N OF BUS 77 | Fund Cat: | 1 |
Limits To: | 0.58 MI S OF FM 106 | Estimate: | $556,554 |
Length: | 6.7 Miles | Actual: | $652,385 |
District: | Pharr | Let Date: | DEC 2004 |
Highway: | FM 511 | Let Status: | Actual |
Project ID: | CPM 684-1-61 | CSJ: | 0684-01-061 |
Description: | ASPHALTIC CONCRETE PAVEMENT OVERLAY | Handling Code: |
|
Limits From: | SH 48 | Fund Cat: | 1 |
Limits To: | FM 803 | Estimate: | $1,150,986 |
Length: | 9.2 Miles | Actual: | $1,214,136 |
Back... |
Totals for 0684-01-061 | ||
Length: | 46.7 Miles | ||
Estimate: | $7,064,513 | ||
Actual: | $7,676,574 | ||
CCSJ: 0921-06-127 | |||
District: | Pharr | Let Date: | AUG 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2000(617)TE | CSJ: | 0921-06-127 |
Description: | CONSTRUCT HIKE AND BIKE FACILITY | Handling Code: |
NC |
Limits From: | W.OF FM 1847 FROM FORMER SPRR SWITC | Fund Cat: | 9 |
Limits To: | ENTRANCE TO PALO ALTO BATTLEFIELD | Estimate: | $3,126,685 |
Length: | 8.0 Miles | Actual: | $4,244,881 |
Bidders List Bid Tabulations Back... |
Totals for 0921-06-127 | ||
Length: | 8.0 Miles | ||
Estimate: | $3,126,685 | ||
Actual: | $4,244,881 | ||
CCSJ: 0921-06-171 | |||
District: | Pharr | Let Date: | OCT 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | BOR 2004(201) | CSJ: | 0921-06-171 |
Description: | PKG E & F, RAILROAD YARD EXPANSION AT OLMITO | Handling Code: |
LN |
Limits From: | RAILROAD RELOCATION - AT UNION PACI | Fund Cat: | 10 |
Limits To: | RAILROAD YARD NEAR OLMITO | Estimate: | $2,000,000 |
Length: | 0.0 Miles | Actual: | $2,422,523 |
Back... |
Totals for 0921-06-171 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,000,000 | ||
Actual: | $2,422,523 | ||
CCSJ: 1065-02-028 | |||
District: | Pharr | Let Date: | FEB 2005 |
Highway: | SP 486 | Let Status: | Actual |
Project ID: | STP 2005(175) | CSJ: | 1065-02-028 |
Description: | RECONSTRUCT 4 LANE URBAN SECTION | Handling Code: |
|
Limits From: | US 77/83 EXWY | Fund Cat: | 1 |
Limits To: | BUS 77 | Estimate: | $1,952,160 |
Length: | 0.9 Miles | Actual: | $2,217,902 |
Back... |
Totals for 1065-02-028 | ||
Length: | 0.9 Miles | ||
Estimate: | $1,952,160 | ||
Actual: | $2,217,902 | ||
CCSJ: 1425-03-042 | |||
District: | Pharr | Let Date: | JUN 2005 |
Highway: | FM 106 | Let Status: | Actual |
Project ID: | STP 2004(189) | CSJ: | 1425-03-042 |
Description: | REALIGN ROADWAY AT PORT CURVES | Handling Code: |
NC |
Limits From: | 0.769 MI. S. OF FM 1595 | Fund Cat: | 11 |
Limits To: | 1.195 MI. S. OF FM 1595 | Estimate: | $1,181,535 |
Length: | 1.1 Miles | Actual: | $1,221,622 |
Bid Tabulations Back... |
Totals for 1425-03-042 | ||
Length: | 1.1 Miles | ||
Estimate: | $1,181,535 | ||
Actual: | $1,221,622 | ||
CCSJ: 2369-01-014 | |||
District: | Pharr | Let Date: | OCT 2004 |
Highway: | FM 509 | Let Status: | Actual |
Project ID: | MG 2004(737) | CSJ: | 2369-01-014 |
Description: | WIDEN TO 4 LANE DIVIDED | Handling Code: |
|
Limits From: | US 77/83 | Fund Cat: | 11 |
Limits To: | BUS 77 | Estimate: | $2,848,290 |
Length: | 1.1 Miles | Actual: | $2,871,048 |
Back... |
Totals for 2369-01-014 | ||
Length: | 1.1 Miles | ||
Estimate: | $2,848,290 | ||
Actual: | $2,871,048 | ||
CCSJ: 3477-01-003 | |||
District: | Pharr | Let Date: | MAR 2005 |
Highway: | FM 3462 | Let Status: | Actual |
Project ID: | C 3477-1-3 | CSJ: | 3477-01-003 |
Description: | RECONSTRUCT AND ADD SHOULDERS | Handling Code: |
|
Limits From: | SH 345 | Fund Cat: | 1 |
Limits To: | FM 510 | Estimate: | $1,921,388 |
Length: | 1.5 Miles | Actual: | $1,827,747 |
Back... |
Totals for 3477-01-003 | ||
Length: | 1.5 Miles | ||
Estimate: | $1,921,388 | ||
Actual: | $1,827,747 |
|
|