Detail Letting Schedule for El Paso County (FY 2005)
Detail Letting Schedule for El Paso County (FY 2005) | ||||
Last Update: Monday, August 15, 2005 |
El Paso County (FY 2005) |
CCSJ: 0002-02-049 | |||
District: | El Paso | Let Date: | JAN 2005 |
Highway: | SH 20 | Let Status: | Actual |
Project ID: | CPM 2-2-49 | CSJ: | 0002-02-049 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | INTERSECTION OF FM 258 | Fund Cat: | 1 |
Limits To: | 1.3 MI EAST OF FM 76 | Estimate: | $1,194,110 |
Length: | 0.8 Miles | Actual: | $332,358 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | SH 20 | Let Status: | Actual |
Project ID: | CPM 2-3-18 | CSJ: | 0002-03-018 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | INTERSECTION OF FM 258 | Fund Cat: | 1 |
Limits To: | 1.3 MI EAST OF FM 76 | Estimate: | $185,151 |
Length: | 1.1 Miles | Actual: | $179,819 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | SH 20 | Let Status: | Actual |
Project ID: | CPM 2-4-29 | CSJ: | 0002-04-029 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | EL PASO COUNTY LINE | Fund Cat: | 1 |
Limits To: | MCNARY | Estimate: | $1,291,334 |
Length: | 16.1 Miles | Actual: | $1,519,529 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CPM 2-10-35 | CSJ: | 0002-10-035 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | END OF PH 11 PAVING | Fund Cat: | 1 |
Limits To: | NEAR EXIT 138 | Estimate: | $1,265,459 |
Length: | 5.3 Miles | Actual: | $1,495,421 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CPM 2-11-52 | CSJ: | 0002-11-052 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | END OF PH 11 PAVING | Fund Cat: | 1 |
Limits To: | NEAR EXIT 138 | Estimate: | $608,341 |
Length: | 2.5 Miles | Actual: | $714,255 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CPM 20-7-29 | CSJ: | 0020-07-029 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | 0.789 MI W OF MARFA CITY LIMITS | Fund Cat: | 1 |
Limits To: | EAST CITY LIMITS MARFA | Estimate: | $450,956 |
Length: | 1.8 Miles | Actual: | $458,110 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CPM 20-8-41 | CSJ: | 0020-08-041 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | .789 MI W OF MARFA CITY LIMITS | Fund Cat: | 1 |
Limits To: | EAST CITY LIMITS OF MARFA | Estimate: | $101,276 |
Length: | 0.4 Miles | Actual: | $101,314 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | CPM 20-11-42 | CSJ: | 0020-11-042 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | 1.686 MI WEST OF ALPINE | Fund Cat: | 1 |
Limits To: | 1.532 MILES EAST OF ALPINE | Estimate: | $159,387 |
Length: | 0.9 Miles | Actual: | $155,625 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | CPM 21-1-48 | CSJ: | 0021-01-048 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | 1.686 MI WEST OF ALPINE | Fund Cat: | 1 |
Limits To: | 1,532 MI EAST OF ALPINE | Estimate: | $124,188 |
Length: | 0.6 Miles | Actual: | $120,529 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | SH 17 | Let Status: | Actual |
Project ID: | CPM 104-3-36 | CSJ: | 0104-03-036 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | .5 MI S SH 118/17 SPL | Fund Cat: | 1 |
Limits To: | .04 MI N SH 118/17 SPL | Estimate: | $261,763 |
Length: | 1.3 Miles | Actual: | $256,273 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | US 54 | Let Status: | Actual |
Project ID: | CPM 167-1-93 | CSJ: | 0167-01-093 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | HMAC JT S OF YANDELL | Fund Cat: | 1 |
Limits To: | HMAC JT S OF MONTANA | Estimate: | $113,263 |
Length: | 0.5 Miles | Actual: | $111,368 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | BU 54-A | Let Status: | Actual |
Project ID: | CPM 167-2-42 | CSJ: | 0167-02-042 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | LOOP 375 | Fund Cat: | 1 |
Limits To: | NEW MEXICO STATE LINE | Estimate: | $1,481,324 |
Length: | 8.5 Miles | Actual: | $1,630,382 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | US 54 | Let Status: | Actual |
Project ID: | CPM 167-4-10 | CSJ: | 0167-04-010 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | LOOP 375 | Fund Cat: | 1 |
Limits To: | APPR AT FIRST BRIDGE | Estimate: | $37,888 |
Length: | 0.2 Miles | Actual: | $38,232 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | US 54 | Let Status: | Actual |
Project ID: | CPM 167-4-11 | CSJ: | 0167-04-011 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | US 54 ML | Fund Cat: | 1 |
Limits To: | APPR AT FIRST BRIDGE | Estimate: | $10,579 |
Length: | 0.1 Miles | Actual: | $10,204 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | FM 3255 | Let Status: | Actual |
Project ID: | CPM 665-1-6 | CSJ: | 0665-01-006 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | CPCR JT N OF US 54 | Fund Cat: | 1 |
Limits To: | END OF CONCRETE CURB | Estimate: | $706,758 |
Length: | 2.2 Miles | Actual: | $676,236 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | FM 76 | Let Status: | Actual |
Project ID: | CPM 674-1-60 | CSJ: | 0674-01-060 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | SH 20 | Estimate: | $8,948 |
Length: | 0.0 Miles | Actual: | $12,436 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CPM 2121-2-116 | CSJ: | 2121-02-116 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | PORFIRO DIAZ | Fund Cat: | 1 |
Limits To: | IH 10 | Estimate: | $179,450 |
Length: | 0.9 Miles | Actual: | $175,563 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CPM 2121-4-74 | CSJ: | 2121-04-074 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | OVERLAY JT W OF LP 375 | Fund Cat: | 1 |
Limits To: | HMAC JT W OF EASTLAKE | Estimate: | $279,005 |
Length: | 1.1 Miles | Actual: | $297,284 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | FM 2529 | Let Status: | Actual |
Project ID: | CPM 2326-1-18 | CSJ: | 2326-01-018 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | US 54 | Fund Cat: | 1 |
Limits To: | DYER STREET | Estimate: | $941,900 |
Length: | 2.5 Miles | Actual: | $926,064 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | FM 793 | Let Status: | Actual |
Project ID: | CPM 2489-1-7 | CSJ: | 2489-01-007 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | SH 20 | Estimate: | $375,150 |
Length: | 1.8 Miles | Actual: | $398,049 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | LP 375 | Let Status: | Actual |
Project ID: | CPM 2552-3-42 | CSJ: | 2552-03-042 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | ZARAGOSA PORT OF ENTRY | Estimate: | $1,113,112 |
Length: | 3.5 Miles | Actual: | $1,084,432 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | LP 375 | Let Status: | Actual |
Project ID: | CPM 2552-4-33 | CSJ: | 2552-04-033 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | EAST END OF PLANT ROAD | Fund Cat: | 1 |
Limits To: | WEST END OF PLANT ROAD | Estimate: | $67,549 |
Length: | 0.4 Miles | Actual: | $79,580 |
District: | El Paso | Let Date: | JAN 2005 |
Highway: | LP 375 | Let Status: | Actual |
Project ID: | CPM 2552-4-34 | CSJ: | 2552-04-034 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | END OF DYN. COMP. | Fund Cat: | 1 |
Limits To: | BEGIN US 54 | Estimate: | $8,235 |
Length: | 0.1 Miles | Actual: | $9,775 |
Back... |
Totals for 0002-02-049 | ||
---|---|---|---|
Length: | 52.6 Miles | ||
Estimate: | $10,965,126 | ||
Actual: | $10,782,838 | ||
CCSJ: 0002-12-019 | |||
District: | El Paso | Let Date: | FEB 2005 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | STP 2005(201) | CSJ: | 0001-04-081 |
Description: | MISCELLANEOUS CONSTRUCTION | Handling Code: |
|
Limits From: | RAYNOLDS/VAL VERDE | Fund Cat: | 11 |
Limits To: | BUENA VISTA | Estimate: | $139,273 |
Length: | 1.0 Miles | Actual: | $213,019 |
District: | El Paso | Let Date: | FEB 2005 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | STP 2005(167)HES | CSJ: | 0002-12-019 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT US 62 AND SH 20 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $115,102 |
Length: | 0.1 Miles | Actual: | $149,316 |
Back... |
Totals for 0002-12-019 | ||
Length: | 1.1 Miles | ||
Estimate: | $254,375 | ||
Actual: | $362,335 | ||
CCSJ: 0167-01-082 | |||
District: | El Paso | Let Date: | DEC 2004 |
Highway: | IH 110 | Let Status: | Actual |
Project ID: | HP 421(4) | CSJ: | 0167-01-082 |
Description: | RECONSTRUCTION OF RAMPS & OUTSIDE LANES BETWEEN IH 10 AND | Handling Code: |
|
Limits From: | PAISANO DRIVE | Fund Cat: | 2 |
Limits To: | IH 10 | Estimate: | $2,231,408 |
Length: | 0.4 Miles | Actual: | $2,377,891 |
Back... |
Totals for 0167-01-082 | ||
Length: | 0.4 Miles | ||
Estimate: | $2,231,408 | ||
Actual: | $2,377,891 | ||
CCSJ: 0167-01-092 | |||
District: | El Paso | Let Date: | JUN 2005 |
Highway: | US 54 | Let Status: | Actual |
Project ID: | CM 2005(338) | CSJ: | 0167-01-092 |
Description: | REPLACING EXISTING LOOP DETECTORS WITH MORE ACCURATE | Handling Code: |
|
Limits From: | US 62 (PAISANO DRIVE) | Fund Cat: | 5 |
Limits To: | LOOP 375 (TRANSMOUNTAIN) | Estimate: | $646,705 |
Length: | 9.0 Miles | Actual: | $387,195 |
District: | El Paso | Let Date: | JUN 2005 |
Highway: | BU 54-A | Let Status: | Actual |
Project ID: | STP 2005(337)SFT | CSJ: | 0167-02-040 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | INTERSECTION OF BU 54A & MC COMBS | Fund Cat: | 8 |
Limits To: | . | Estimate: | $165,936 |
Length: | 0.1 Miles | Actual: | $201,939 |
District: | El Paso | Let Date: | JUN 2005 |
Highway: | LP 478 | Let Status: | Actual |
Project ID: | STP 2005(337)SFT | CSJ: | 0167-02-041 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | INTERSECTION L00P 478 & THOMPKINS | Fund Cat: | 8 |
Limits To: | . | Estimate: | $76,698 |
Length: | 0.1 Miles | Actual: | $100,493 |
District: | El Paso | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CM 2005(338) | CSJ: | 2121-01-068 |
Description: | REPLACING EXISTING LOOP DETECTORS WITH MORE ACCURATE VEHICLE | Handling Code: |
|
Limits From: | NEW MEXICO STATE LINE | Fund Cat: | 5 |
Limits To: | MESA (SH 20) | Estimate: | $108,562 |
Length: | 11.2 Miles | Actual: | $95,635 |
District: | El Paso | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CM 2005(338) | CSJ: | 2121-02-115 |
Description: | REPLACING EXISTING LOOP DETECTORS WITH MORE ACCURATE VEHICLE | Handling Code: |
|
Limits From: | MESA (SH 20) | Fund Cat: | 5 |
Limits To: | PAISANO (US 62/180) | Estimate: | $848,429 |
Length: | 13.3 Miles | Actual: | $773,153 |
District: | El Paso | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CM 2005(338) | CSJ: | 2121-03-128 |
Description: | REPLACING EXISTING LOOP DETECTORS WITH MORE ACCURATE VEHICLE | Handling Code: |
|
Limits From: | PAISANO (US 62/180) | Fund Cat: | 5 |
Limits To: | ZARAGOSA (FM 659) | Estimate: | $536,812 |
Length: | 8.4 Miles | Actual: | $475,348 |
District: | El Paso | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CM 2005(338) | CSJ: | 2121-04-073 |
Description: | REPLACING EXISTING LOOP DETECTORS WITH MORE ACCURATE VEHICLE | Handling Code: |
|
Limits From: | ZARAGOSA ROAD (FM 659) | Fund Cat: | 5 |
Limits To: | HORIZON BLVD (FM 1281) | Estimate: | $155,714 |
Length: | 5.7 Miles | Actual: | $131,600 |
Bid Tabulations Back... |
Totals for 0167-01-092 | ||
Length: | 47.8 Miles | ||
Estimate: | $2,538,856 | ||
Actual: | $2,165,363 | ||
CCSJ: 0167-02-043 | |||
District: | El Paso | Let Date: | AUG 2005 |
Highway: | BU 54-A | Let Status: | Actual |
Project ID: | CL 167-2-43 | CSJ: | 0167-02-043 |
Description: | LANDSCAPING WORK | Handling Code: |
|
Limits From: | HONDO PASS | Fund Cat: | 10 |
Limits To: | MC COMBS STREET | Estimate: | $807,215 |
Length: | 2.5 Miles | Actual: | $777,167 |
List Showing Order Proposal Req Form Bidders List Bid Tabulations Back... |
Totals for 0167-02-043 | ||
Length: | 2.5 Miles | ||
Estimate: | $807,215 | ||
Actual: | $777,167 | ||
CCSJ: 0665-01-007 | |||
District: | El Paso | Let Date: | JUN 2005 |
Highway: | FM 3255 | Let Status: | Actual |
Project ID: | STP 2005(752) | CSJ: | 0665-01-007 |
Description: | CONSTRUCTION OF DRAINAGE STRUCTURES AND ASPHALTIC PAVEMENT | Handling Code: |
|
Limits From: | NORTH OF US 54 | Fund Cat: | 11 |
Limits To: | JON CUNNINGHAM BOULEVARD | Estimate: | $1,840,509 |
Length: | 0.4 Miles | Actual: | $2,129,061 |
Bid Tabulations Back... |
Totals for 0665-01-007 | ||
Length: | 0.4 Miles | ||
Estimate: | $1,840,509 | ||
Actual: | $2,129,061 | ||
CCSJ: 0924-00-032 | |||
District: | El Paso | Let Date: | AUG 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | BOR 2002(630) | CSJ: | 0924-00-032 |
Description: | ZARAGOZA PORT OF ENTRY BORDER SAFETY INSPECTION FACILITY | Handling Code: |
NC |
Limits From: | LOCATED IN VICINITY OF GSA FACILITY | Fund Cat: | 10 |
Limits To: | ZARAGOSA/YSELTA | Estimate: | $14,647,446 |
Length: | 1.7 Miles | Actual: | $15,802,507 |
Bidders List Bid Tabulations Back... |
Totals for 0924-00-032 | ||
Length: | 1.7 Miles | ||
Estimate: | $14,647,446 | ||
Actual: | $15,802,507 | ||
CCSJ: 0924-00-055 | |||
District: | El Paso | Let Date: | JAN 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 924-0-55 | CSJ: | 0924-00-055 |
Description: | DISTRICTWIDE STRIPING PROGRAM 2005 FOR HUDSPETH, CULBERSON, | Handling Code: |
|
Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $999,993 |
Length: | 198.0 Miles | Actual: | $786,985 |
Back... |
Totals for 0924-00-055 | ||
Length: | 198.0 Miles | ||
Estimate: | $999,993 | ||
Actual: | $786,985 | ||
CCSJ: 0924-00-057 | |||
District: | El Paso | Let Date: | APR 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | DMO 2005(224) | CSJ: | 0924-00-057 |
Description: | INFRASTRUCTURE REHABILITATION - SOUTH ORIENT ECONOMIC | Handling Code: |
|
Limits From: | EAST OF FORT STOCKTON | Fund Cat: | 10 |
Limits To: | INTERNATIONAL BRIDGE AT PRESIDIO | Estimate: | $4,448,084 |
Length: | 0.0 Miles | Actual: | $5,457,430 |
District: | El Paso | Let Date: | APR 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | DMO 2005(339) | CSJ: | 0924-00-058 |
Description: | INFRASTRUCTURE REHABILITATION - SOUTH ORIENT ECONOMIC | Handling Code: |
|
Limits From: | EAST OF FORT STOCKTON | Fund Cat: | 10 |
Limits To: | INTERNATIONAL BRIDGE AT PRESIDIO | Estimate: | $1,500,000 |
Length: | 0.0 Miles | Actual: | |
Back... |
Totals for 0924-00-057 | ||
Length: | 0.0 Miles | ||
Estimate: | $5,948,084 | ||
Actual: | $5,457,430 | ||
CCSJ: 0924-06-163 | |||
District: | El Paso | Let Date: | JUN 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(277)MM | CSJ: | 0924-06-163 |
Description: | RECONSTRUCT MAGOFFIN AVE. | Handling Code: |
LC |
Limits From: | TRANSIT PLAZA- | Fund Cat: | 7 |
Limits To: | VIRGINIA ST. | Estimate: | $1,229,652 |
Length: | 0.0 Miles | Actual: | $1,361,876 |
Back... |
Totals for 0924-06-163 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,229,652 | ||
Actual: | $1,361,876 | ||
CCSJ: 0924-06-220 | |||
District: | El Paso | Let Date: | NOV 2004 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2004(486) | CSJ: | 0924-06-220 |
Description: | TRANS MGMT CONTROL CENTER - OPERATING COST | Handling Code: |
XX |
Limits From: | CITY OF EL PASO | Fund Cat: | 5 |
Limits To: | . | Estimate: | $272,250 |
Length: | 1.0 Miles | Actual: | $654,750 |
Back... |
Totals for 0924-06-220 | ||
Length: | 1.0 Miles | ||
Estimate: | $272,250 | ||
Actual: | $654,750 | ||
CCSJ: 0924-06-223 | |||
District: | El Paso | Let Date: | JAN 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2005(157) | CSJ: | 0924-06-223 |
Description: | TRAFFIC LIGHT SYNCHRONIZATION PHASE V | Handling Code: |
|
Limits From: | CITYWIDE, | Fund Cat: | 5 |
Limits To: | VARIOUS LOCATIONS | Estimate: | $2,661,709 |
Length: | 10.0 Miles | Actual: | $2,187,564 |
Back... |
Totals for 0924-06-223 | ||
Length: | 10.0 Miles | ||
Estimate: | $2,661,709 | ||
Actual: | $2,187,564 | ||
CCSJ: 0924-06-245 | |||
District: | El Paso | Let Date: | DEC 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 924-0-50 | CSJ: | 0924-00-050 |
Description: | UPGRADE ITS SUPPORT COMMUNICATION INFRASTRUCTURE HARDWARE | Handling Code: |
|
Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $152,992 |
Length: | 1.0 Miles | Actual: | $249,760 |
District: | El Paso | Let Date: | DEC 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 924-6-245 | CSJ: | 0924-06-245 |
Description: | REMOVE AND REPLACE CCTV CAMERAS | Handling Code: |
|
Limits From: | CITYWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $199,500 |
Length: | 1.0 Miles | Actual: | $126,000 |
Back... |
Totals for 0924-06-245 | ||
Length: | 2.0 Miles | ||
Estimate: | $352,492 | ||
Actual: | $375,760 | ||
CCSJ: 0924-06-250 | |||
District: | El Paso | Let Date: | DEC 2004 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2005(82) | CSJ: | 0924-06-250 |
Description: | HIGHWAY ADVISORY RADIO SYSTEM | Handling Code: |
|
Limits From: | IH 10-VARIOUS LOCATIONS | Fund Cat: | 5 |
Limits To: | US 54-VARIOUS LOCATIONS | Estimate: | $817,791 |
Length: | 34.0 Miles | Actual: | $1,104,423 |
Back... |
Totals for 0924-06-250 | ||
Length: | 34.0 Miles | ||
Estimate: | $817,791 | ||
Actual: | $1,104,423 | ||
CCSJ: 0924-06-256 | |||
District: | El Paso | Let Date: | SEP 2004 |
Highway: | CS | Let Status: | Actual |
Project ID: | STR 2005(18) | CSJ: | 0924-06-256 |
Description: | BORDER WIZARD SOFTWARE AS PART OF A DEMONSTRATION PROJECT | Handling Code: |
XX |
Limits From: | CITYWIDE | Fund Cat: | 10 |
Limits To: | . | Estimate: | $31,250 |
Length: | 0.1 Miles | Actual: | $31,250 |
Back... |
Totals for 0924-06-256 | ||
Length: | 0.1 Miles | ||
Estimate: | $31,250 | ||
Actual: | $31,250 | ||
CCSJ: 0924-06-259 | |||
District: | El Paso | Let Date: | JUN 2005 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2005(872) | CSJ: | 0924-06-259 |
Description: | PHOTOGRAMMETRY EQUIPMENT FOR CRIME SCENE AND COLLISION | Handling Code: |
XX |
Limits From: | CITYWIDE | Fund Cat: | 5 |
Limits To: | . | Estimate: | $39,180 |
Length: | 0.1 Miles | Actual: | $39,180 |
Back... |
Totals for 0924-06-259 | ||
Length: | 0.1 Miles | ||
Estimate: | $39,180 | ||
Actual: | $39,180 | ||
CCSJ: 0924-06-262 | |||
District: | El Paso | Let Date: | JUN 2005 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2005(519) | CSJ: | 0924-06-262 |
Description: | SMART UTEP EXTENSION WITH TRANSIT TERMINAL AND PARKING AND | Handling Code: |
XX |
Limits From: | OREGON STREET TRANSIT AND PED MALL | Fund Cat: | 5 |
Limits To: | UTEP (MESA AND CINCINNATI) | Estimate: | $4,700,000 |
Length: | 1.0 Miles | Actual: | $4,700,000 |
Back... |
Totals for 0924-06-262 | ||
Length: | 1.0 Miles | ||
Estimate: | $4,700,000 | ||
Actual: | $4,700,000 | ||
CCSJ: 1046-01-019 | |||
District: | El Paso | Let Date: | JUL 2005 |
Highway: | FM 659 | Let Status: | Actual |
Project ID: | MG 2005(652) | CSJ: | 1046-01-019 |
Description: | MILL AND INLAY_ (ACP) | Handling Code: |
|
Limits From: | FM 76 (NORTH LOOP) | Fund Cat: | 1 |
Limits To: | US 62/180 (MONTANA AVENUE) | Estimate: | $3,477,374 |
Length: | 9.4 Miles | Actual: | $3,289,052 |
Bid Tabulations Back... |
Totals for 1046-01-019 | ||
Length: | 9.4 Miles | ||
Estimate: | $3,477,374 | ||
Actual: | $3,289,052 | ||
CCSJ: 1281-01-015 | |||
District: | El Paso | Let Date: | NOV 2004 |
Highway: | SH 20 | Let Status: | Actual |
Project ID: | STP 2004(795) | CSJ: | 0001-03-052 |
Description: | REHABILITATION OF A NON - FREEWAY FACILITY CONSISTING OF | Handling Code: |
|
Limits From: | CAMPBELL STREET | Fund Cat: | 1 |
Limits To: | ALAMEDA | Estimate: | $460,964 |
Length: | 1.5 Miles | Actual: | $509,256 |
District: | El Paso | Let Date: | NOV 2004 |
Highway: | FM 1110 | Let Status: | Actual |
Project ID: | STP 2004(795) | CSJ: | 1281-01-015 |
Description: | REPLACE & REWORK BASE, NEW SURFACING | Handling Code: |
|
Limits From: | FM 258 | Fund Cat: | 1 |
Limits To: | FM 76 | Estimate: | $2,895,880 |
Length: | 3.7 Miles | Actual: | $2,911,736 |
Back... |
Totals for 1281-01-015 | ||
Length: | 5.2 Miles | ||
Estimate: | $3,356,844 | ||
Actual: | $3,420,992 | ||
CCSJ: 2121-01-069 | |||
District: | El Paso | Let Date: | JUL 2005 |
Highway: | US 54 | Let Status: | Actual |
Project ID: | STP 2005(716)SFT | CSJ: | 0167-01-096 |
Description: | INSTALL MEDIAN BARRIER | Handling Code: |
|
Limits From: | HONDO PASS | Fund Cat: | 1 |
Limits To: | SUN VALLEY | Estimate: | $261,960 |
Length: | 3.1 Miles | Actual: | $154,328 |
District: | El Paso | Let Date: | JUL 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(716)SFT | CSJ: | 2121-01-069 |
Description: | INSTALL MEDIAN BARRIER | Handling Code: |
|
Limits From: | NEW MEXICO STATE LINE | Fund Cat: | 1 |
Limits To: | LOOP 375 | Estimate: | $634,467 |
Length: | 6.4 Miles | Actual: | $369,341 |
District: | El Paso | Let Date: | JUL 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2005(716)SFT | CSJ: | 2121-04-075 |
Description: | INSTALL MEDIAN BARRIER | Handling Code: |
|
Limits From: | FM 659 | Fund Cat: | 1 |
Limits To: | FM 1281 | Estimate: | $469,130 |
Length: | 5.8 Miles | Actual: | $269,395 |
Bid Tabulations Back... |
Totals for 2121-01-069 | ||
Length: | 15.3 Miles | ||
Estimate: | $1,365,557 | ||
Actual: | $793,064 | ||
CCSJ: 2121-03-127 | |||
District: | El Paso | Let Date: | JUN 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 10-1(236) | CSJ: | 2121-03-127 |
Description: | REPLACE & REWORK BASE, NEW SURFACING | Handling Code: |
NC |
Limits From: | MCRAE | Fund Cat: | 1 |
Limits To: | 1.56 MI W OF FM 659 (ZARAGOZA RD) | Estimate: | $6,280,583 |
Length: | 2.5 Miles | Actual: | $6,260,926 |
Bid Tabulations Back... |
Totals for 2121-03-127 | ||
Length: | 2.5 Miles | ||
Estimate: | $6,280,583 | ||
Actual: | $6,260,926 | ||
CCSJ: 2121-04-072 | |||
District: | El Paso | Let Date: | MAR 2005 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CM 2005(270) | CSJ: | 2121-04-072 |
Description: | TMC EMERGENCY & BACKUP POWER PROJECT | Handling Code: |
|
Limits From: | TRANSVISTA TRAFFIC MANAGEMENT CENTE | Fund Cat: | 5 |
Limits To: | . | Estimate: | $324,811 |
Length: | 1.0 Miles | Actual: | $238,445 |
Back... |
Totals for 2121-04-072 | ||
Length: | 1.0 Miles | ||
Estimate: | $324,811 | ||
Actual: | $238,445 |
|
|