Letting Schedule for El Paso District (FY 2005)

 
 
Last Update: Monday, August 15, 2005
El Paso District (FY 2005)
Culberson | El Paso

Culberson County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0233-04-013 SH 54 Actual JUL 2005 $6,272,222 11 REHABILITATE EXISTING ROAD

El Paso County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0002-02-049 SH 20 Actual JAN 2005 $10,782,838 1 OVERLAY
0002-12-019 US 62 Actual FEB 2005 $362,335 11 IMPROVE TRAFFIC SIGNAL
0167-01-082 IH 110 Actual DEC 2004 $2,377,891 2 RECONSTRUCTION OF RAMPS & OUTSIDE LANES BETWEEN IH 10 AND
0167-01-092 US 54 Actual JUN 2005 $2,165,363 5 REPLACING EXISTING LOOP DETECTORS WITH MORE ACCURATE
0167-02-043 BU 54-A Actual AUG 2005 $777,167 10 LANDSCAPING WORK
0665-01-007 FM 3255 Actual JUN 2005 $2,129,061 11 CONSTRUCTION OF DRAINAGE STRUCTURES AND ASPHALTIC PAVEMENT
0924-00-032 VA Actual AUG 2005 $15,802,507 10 ZARAGOZA PORT OF ENTRY BORDER SAFETY INSPECTION FACILITY
0924-00-055 VA Actual JAN 2005 $786,985 1 DISTRICTWIDE STRIPING PROGRAM 2005 FOR HUDSPETH, CULBERSON,
0924-00-057 VA Actual APR 2005 $5,457,430 10 INFRASTRUCTURE REHABILITATION - SOUTH ORIENT ECONOMIC
0924-06-163 CS Actual JUN 2005 $1,361,876 7 RECONSTRUCT MAGOFFIN AVE.
0924-06-220 CS Actual NOV 2004 $654,750 5 TRANS MGMT CONTROL CENTER - OPERATING COST
0924-06-223 CS Actual JAN 2005 $2,187,564 5 TRAFFIC LIGHT SYNCHRONIZATION PHASE V
0924-06-245 VA Actual DEC 2004 $375,760 1 REMOVE AND REPLACE CCTV CAMERAS
0924-06-250 VA Actual DEC 2004 $1,104,423 5 HIGHWAY ADVISORY RADIO SYSTEM
0924-06-256 CS Actual SEP 2004 $31,250 10 BORDER WIZARD SOFTWARE AS PART OF A DEMONSTRATION PROJECT
0924-06-259 VA Actual JUN 2005 $39,180 5 PHOTOGRAMMETRY EQUIPMENT FOR CRIME SCENE AND COLLISION
0924-06-262 CS Actual JUN 2005 $4,700,000 5 SMART UTEP EXTENSION WITH TRANSIT TERMINAL AND PARKING AND
1046-01-019 FM 659 Actual JUL 2005 $3,289,052 1 MILL AND INLAY_ (ACP)
1281-01-015 FM 1110 Actual NOV 2004 $3,420,992 1 REPLACE & REWORK BASE, NEW SURFACING
2121-01-069 IH 10 Actual JUL 2005 $793,064 1 INSTALL MEDIAN BARRIER
2121-03-127 IH 10 Actual JUN 2005 $6,260,926 1 REPLACE & REWORK BASE, NEW SURFACING
2121-04-072 IH 10 Actual MAR 2005 $238,445 5 TMC EMERGENCY & BACKUP POWER PROJECT