Detail Letting Schedule for Frio County (FY 2005)
Detail Letting Schedule for Frio County (FY 2005) | ||||
Last Update: Monday, August 15, 2005 |
Frio County (FY 2005) |
CCSJ: 0017-06-073 | |||
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CPM 17-6-73 | CSJ: | 0017-06-073 |
Description: | SEAL COAT & PAVEMENT MARKINGS ON FRONTAGE ROADS | Handling Code: |
|
Limits From: | BI 35 E | Fund Cat: | 1 |
Limits To: | US 57 | Estimate: | $557,849 |
Length: | 6.9 Miles | Actual: | $609,546 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CPM 17-7-83 | CSJ: | 0017-07-083 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 1581 | Fund Cat: | 1 |
Limits To: | FM 140 | Estimate: | $22,059 |
Length: | 1.3 Miles | Actual: | $22,319 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CPM 17-7-84 | CSJ: | 0017-07-084 |
Description: | SEAL COAT_ & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 117 | Fund Cat: | 1 |
Limits To: | FM 1581 | Estimate: | $241,473 |
Length: | 14.9 Miles | Actual: | $246,187 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CPM 17-7-85 | CSJ: | 0017-07-085 |
Description: | SEAL COAT_ & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | LASALLE COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 85 | Estimate: | $27,035 |
Length: | 1.7 Miles | Actual: | $27,582 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CPM 25-3-83 | CSJ: | 0025-03-083 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | US 90A | Estimate: | $75,440 |
Length: | 2.7 Miles | Actual: | $80,390 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 78 | Let Status: | Actual |
Project ID: | CPM 25-10-76 | CSJ: | 0025-10-076 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | GUADALUPE RIVER | Fund Cat: | 1 |
Limits To: | US 90 | Estimate: | $129,433 |
Length: | 4.0 Miles | Actual: | $138,658 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CPM 29-1-24 | CSJ: | 0029-01-024 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 90A | Fund Cat: | 1 |
Limits To: | 0.3 MI E OF FM 78 (PREXY STREET) | Estimate: | $36,742 |
Length: | 1.3 Miles | Actual: | $38,064 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | US 181 | Let Status: | Actual |
Project ID: | CPM 100-4-34 | CSJ: | 0100-04-034 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 537 | Fund Cat: | 1 |
Limits To: | 0.5 MI S OF SPRR | Estimate: | $262,187 |
Length: | 5.7 Miles | Actual: | $278,908 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 725 | Let Status: | Actual |
Project ID: | CPM 215-9-20 | CSJ: | 0215-09-020 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | CR 366 (ZIPPE RD.) | Fund Cat: | 1 |
Limits To: | FM 78 | Estimate: | $133,681 |
Length: | 6.0 Miles | Actual: | $136,867 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 466 | Let Status: | Actual |
Project ID: | CPM 216-3-26 | CSJ: | 0216-03-026 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 123 | Fund Cat: | 1 |
Limits To: | FM 477 | Estimate: | $61,240 |
Length: | 3.0 Miles | Actual: | $58,620 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 117 | Let Status: | Actual |
Project ID: | CPM 236-4-20 | CSJ: | 0236-04-020 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | ZAVALA COUNTY LINE | Fund Cat: | 1 |
Limits To: | IH 35 (WFR) | Estimate: | $340,070 |
Length: | 17.9 Miles | Actual: | $284,402 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | US 57 | Let Status: | Actual |
Project ID: | CPM 276-7-26 | CSJ: | 0276-07-026 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | ZAVALA COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 140 | Estimate: | $243,584 |
Length: | 11.1 Miles | Actual: | $261,300 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | SH 80 | Let Status: | Actual |
Project ID: | CPM 348-2-11 | CSJ: | 0348-02-011 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | GONZALES COUNTY LINE | Fund Cat: | 1 |
Limits To: | KARNES COUNTY LINE | Estimate: | $69,068 |
Length: | 2.9 Miles | Actual: | $73,300 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | SH 119 | Let Status: | Actual |
Project ID: | CPM 359-5-7 | CSJ: | 0359-05-007 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 87 | Fund Cat: | 1 |
Limits To: | FM 1347 | Estimate: | $88,263 |
Length: | 4.0 Miles | Actual: | $97,424 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 1347 | Let Status: | Actual |
Project ID: | CPM 366-8-8 | CSJ: | 0366-08-008 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 123 | Fund Cat: | 1 |
Limits To: | SH 119 | Estimate: | $39,451 |
Length: | 2.0 Miles | Actual: | $34,485 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 541 | Let Status: | Actual |
Project ID: | CPM 366-9-24 | CSJ: | 0366-09-024 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | MARCELINAS CREEK | Fund Cat: | 1 |
Limits To: | SH 123 | Estimate: | $114,945 |
Length: | 6.7 Miles | Actual: | $119,040 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | BS 123B | Let Status: | Actual |
Project ID: | CPM 366-12-19 | CSJ: | 0366-12-019 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 2.1 MI NORTH OF SPRR | Fund Cat: | 1 |
Limits To: | SPRR IN SEGUIN | Estimate: | $70,325 |
Length: | 2.1 Miles | Actual: | $70,612 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 464 | Let Status: | Actual |
Project ID: | CPM 436-1-7 | CSJ: | 0436-01-007 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | END OF STATE MAINTENANCE | Fund Cat: | 1 |
Limits To: | US 90 | Estimate: | $30,148 |
Length: | 1.8 Miles | Actual: | $30,095 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 1518 | Let Status: | Actual |
Project ID: | CPM 465-2-20 | CSJ: | 0465-02-020 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 78 | Fund Cat: | 1 |
Limits To: | FM 1346 | Estimate: | $216,745 |
Length: | 10.8 Miles | Actual: | $228,281 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | CPM 517-1-38 | CSJ: | 0517-01-038 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 1332 | Fund Cat: | 1 |
Limits To: | FM 140 | Estimate: | $183,641 |
Length: | 8.2 Miles | Actual: | $195,783 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | CPM 521-6-123 | CSJ: | 0521-06-123 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | S OF RITTIMAN ROAD | Fund Cat: | 1 |
Limits To: | EDDIE ROAD | Estimate: | $37,228 |
Length: | 1.8 Miles | Actual: | $39,876 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | CPM 613-2-51 | CSJ: | 0613-02-051 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | BEXAR COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 476 | Estimate: | $448,180 |
Length: | 8.9 Miles | Actual: | $484,038 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 140 | Let Status: | Actual |
Project ID: | CPM 748-5-34 | CSJ: | 0748-05-034 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 2.6 MI E CHARLOTTE SOUTH CITY LIMIT | Fund Cat: | 1 |
Limits To: | SH 16 | Estimate: | $198,904 |
Length: | 9.9 Miles | Actual: | $166,717 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 775 | Let Status: | Actual |
Project ID: | CPM 850-2-8 | CSJ: | 0850-02-008 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | GUADALUPE COUNTY LINE | Fund Cat: | 1 |
Limits To: | LP 321 | Estimate: | $27,487 |
Length: | 1.6 Miles | Actual: | $26,867 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 775 | Let Status: | Actual |
Project ID: | CPM 850-4-17 | CSJ: | 0850-04-017 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | LP 321 | Fund Cat: | 1 |
Limits To: | FM 3432 | Estimate: | $132,559 |
Length: | 5.3 Miles | Actual: | $132,093 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 478 | Let Status: | Actual |
Project ID: | CPM 854-1-11 | CSJ: | 0854-01-011 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 97 | Fund Cat: | 1 |
Limits To: | ATASCOSA COUNTY LINE | Estimate: | $6,279 |
Length: | 0.4 Miles | Actual: | $5,947 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 478 | Let Status: | Actual |
Project ID: | CPM 854-2-10 | CSJ: | 0854-02-010 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | WILSON COUNTY LINE | Fund Cat: | 1 |
Limits To: | END OF STATE MAINTENANCE | Estimate: | $44,967 |
Length: | 3.1 Miles | Actual: | $43,032 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | PW | Let Status: | Actual |
Project ID: | CPM 915-51-7 | CSJ: | 0915-51-007 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | PW 9129 SECTIONS A-E | Fund Cat: | 1 |
Limits To: | . | Estimate: | $180,569 |
Length: | 3.7 Miles | Actual: | $167,774 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 541 | Let Status: | Actual |
Project ID: | CPM 1011-1-31 | CSJ: | 1011-01-031 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | CR 215 | Fund Cat: | 1 |
Limits To: | US 181 | Estimate: | $206,835 |
Length: | 11.5 Miles | Actual: | $212,403 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 1344 | Let Status: | Actual |
Project ID: | CPM 1122-3-9 | CSJ: | 1122-03-009 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 97 | Fund Cat: | 1 |
Limits To: | FM 541 | Estimate: | $119,432 |
Length: | 5.4 Miles | Actual: | $102,792 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 1344 | Let Status: | Actual |
Project ID: | CPM 1122-4-9 | CSJ: | 1122-04-009 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 541 | Fund Cat: | 1 |
Limits To: | KARNES CO. LINE | Estimate: | $201,100 |
Length: | 9.1 Miles | Actual: | $173,112 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 1150 | Let Status: | Actual |
Project ID: | CPM 1269-1-18 | CSJ: | 1269-01-018 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 90A | Fund Cat: | 1 |
Limits To: | SH 80 | Estimate: | $185,035 |
Length: | 10.8 Miles | Actual: | $183,923 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 1104 | Let Status: | Actual |
Project ID: | CPM 1272-4-10 | CSJ: | 1272-04-010 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 90 | Fund Cat: | 1 |
Limits To: | IH 10 | Estimate: | $45,825 |
Length: | 3.0 Miles | Actual: | $46,182 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 140 | Let Status: | Actual |
Project ID: | CPM 1431-2-13 | CSJ: | 1431-02-013 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | CHARLOTTE SOUTH CITY LIMITS | Fund Cat: | 1 |
Limits To: | 2.6 MI E CHARLOTTE SOUTH CITY LIMIT | Estimate: | $51,068 |
Length: | 2.6 Miles | Actual: | $42,899 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 1620 | Let Status: | Actual |
Project ID: | CPM 1543-1-5 | CSJ: | 1543-01-005 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 78 | Fund Cat: | 1 |
Limits To: | FM 464 | Estimate: | $24,279 |
Length: | 1.4 Miles | Actual: | $24,095 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 2790 | Let Status: | Actual |
Project ID: | CPM 1741-2-28 | CSJ: | 1741-02-028 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 476 | Fund Cat: | 1 |
Limits To: | LP 1604 | Estimate: | $47,660 |
Length: | 2.0 Miles | Actual: | $47,542 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 427 | Let Status: | Actual |
Project ID: | CPM 1826-2-8 | CSJ: | 1826-02-008 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 537 | Fund Cat: | 1 |
Limits To: | US 181 | Estimate: | $94,155 |
Length: | 5.3 Miles | Actual: | $96,731 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 1976 | Let Status: | Actual |
Project ID: | CPM 1890-1-42 | CSJ: | 1890-01-042 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | WALZEM ROAD | Fund Cat: | 1 |
Limits To: | FM 3502 | Estimate: | $80,362 |
Length: | 2.5 Miles | Actual: | $77,371 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 1044 | Let Status: | Actual |
Project ID: | CPM 2021-2-12 | CSJ: | 2021-02-012 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | COMAL COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 78 | Estimate: | $128,538 |
Length: | 6.4 Miles | Actual: | $128,078 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 477 | Let Status: | Actual |
Project ID: | CPM 2231-1-4 | CSJ: | 2231-01-004 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 123 | Fund Cat: | 1 |
Limits To: | FM 466 | Estimate: | $43,415 |
Length: | 2.5 Miles | Actual: | $42,254 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 539 | Let Status: | Actual |
Project ID: | CPM 2233-1-13 | CSJ: | 2233-01-013 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | GUADALUPE CO. LINE | Fund Cat: | 1 |
Limits To: | 1.5 MI NORTH OF US 87 | Estimate: | $154,395 |
Length: | 6.4 Miles | Actual: | $171,901 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 327 | Let Status: | Actual |
Project ID: | CPM 2255-3-4 | CSJ: | 2255-03-004 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | LP 1604 N. OF ELMENDORF | Fund Cat: | 1 |
Limits To: | LP 1604 S. OF ELMENDORF | Estimate: | $45,178 |
Length: | 2.4 Miles | Actual: | $44,213 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | CPM 2452-3-96 | CSJ: | 2452-03-096 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | GREEN MOUNTAIN RD. | Fund Cat: | 1 |
Limits To: | FORUM PKWY / SH 218 | Estimate: | $145,966 |
Length: | 7.0 Miles | Actual: | $156,184 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 3465 | Let Status: | Actual |
Project ID: | CPM 2452-5-3 | CSJ: | 2452-05-003 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.899 MI. N. OF US 87 | Fund Cat: | 1 |
Limits To: | 0.461 MI. S. OF US 87 | Estimate: | $27,328 |
Length: | 1.4 Miles | Actual: | $28,049 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 1470 | Let Status: | Actual |
Project ID: | CPM 2518-1-13 | CSJ: | 2518-01-013 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 476 | Fund Cat: | 1 |
Limits To: | US 281 | Estimate: | $167,463 |
Length: | 6.4 Miles | Actual: | $137,882 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 725 | Let Status: | Actual |
Project ID: | CPM 2710-1-15 | CSJ: | 2710-01-015 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 78 | Fund Cat: | 1 |
Limits To: | FM 467 | Estimate: | $164,110 |
Length: | 7.3 Miles | Actual: | $165,566 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 3445 | Let Status: | Actual |
Project ID: | CPM 3439-1-5 | CSJ: | 3439-01-005 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 16 | Fund Cat: | 1 |
Limits To: | END OF STATE MAINTENANCE | Estimate: | $161,687 |
Length: | 7.2 Miles | Actual: | $142,277 |
District: | San Antonio | Let Date: | NOV 2004 |
Highway: | FM 143 | Let Status: | Actual |
Project ID: | CPM 3615-1-2 | CSJ: | 3615-01-002 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | CAGNON ROAD | Fund Cat: | 1 |
Limits To: | LP 1604 | Estimate: | $19,857 |
Length: | 0.8 Miles | Actual: | $21,978 |
Back... |
Totals for 0017-06-073 | ||
---|---|---|---|
Length: | 251.1 Miles | ||
Estimate: | $6,133,240 | ||
Actual: | $6,143,639 | ||
CCSJ: 0017-06-075 | |||
District: | San Antonio | Let Date: | DEC 2004 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(307) | CSJ: | 0017-06-075 |
Description: | SEALCOAT, PFC, & PAVEMENT MARKINGS | Handling Code: |
NC |
Limits From: | FM 140 | Fund Cat: | 1 |
Limits To: | US 57 | Estimate: | $3,683,353 |
Length: | 9.8 Miles | Actual: | $3,594,685 |
Back... |
Totals for 0017-06-075 | ||
Length: | 9.8 Miles | ||
Estimate: | $3,683,353 | ||
Actual: | $3,594,685 | ||
CCSJ: 0017-07-086 | |||
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | FM 483 | Let Status: | Actual |
Project ID: | C 16-20-5 | CSJ: | 0016-20-005 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ FM 1101 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $11,648 |
Length: | 0.0 Miles | Actual: | $10,209 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-7-86 | CSJ: | 0017-07-086 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ SH 85 AND FM 117 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $65,703 |
Length: | 0.0 Miles | Actual: | $74,991 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-10-227 | CSJ: | 0017-10-227 |
Description: | INSTALL INTERSECTION FLASHING BEACON FOR STOP SIGN | Handling Code: |
|
Limits From: | IH 35 SBFR AT RANDOLPH BLVD | Fund Cat: | 1 |
Limits To: | . | Estimate: | $7,829 |
Length: | 0.0 Miles | Actual: | $7,090 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | SFT 36-7-28 | CSJ: | 0036-07-028 |
Description: | INSTALL FLASHING BEACON | Handling Code: |
|
Limits From: | @ FM 1050 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $14,258 |
Length: | 0.0 Miles | Actual: | $13,201 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | C 72-14-22 | CSJ: | 0072-14-022 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ FM 1376 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $41,053 |
Length: | 0.0 Miles | Actual: | $34,929 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | SFT 73-2-62 | CSJ: | 0073-02-062 |
Description: | REPLACE FLASHING BEACON WITH TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | @ FM 2537 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $64,458 |
Length: | 0.0 Miles | Actual: | $63,786 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | C 143-4-58 | CSJ: | 0143-04-058 |
Description: | INSTALL INTERSECTION FLASHING BEACON FOR STOP SIGN | Handling Code: |
|
Limits From: | @ SH 119 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $10,800 |
Length: | 0.0 Miles | Actual: | $7,995 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | SH 41 | Let Status: | Actual |
Project ID: | C 201-7-14 | CSJ: | 0201-07-014 |
Description: | INSTALL INTERSECTION FLASHING BEACON FOR STOP SIGN | Handling Code: |
|
Limits From: | @ FM 1340 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $9,453 |
Length: | 0.0 Miles | Actual: | $6,699 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | SH 46 | Let Status: | Actual |
Project ID: | C 215-6-25 | CSJ: | 0215-06-025 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | AT FM 3351/FM 3160 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $40,826 |
Length: | 0.0 Miles | Actual: | $35,081 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | FM 117 | Let Status: | Actual |
Project ID: | C 236-1-17 | CSJ: | 0236-01-017 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ FM 140 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $12,443 |
Length: | 0.0 Miles | Actual: | $10,926 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | C 291-5-44 | CSJ: | 0291-05-044 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @FM 2828 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $12,694 |
Length: | 0.0 Miles | Actual: | $11,121 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | SH 123 | Let Status: | Actual |
Project ID: | C 366-2-73 | CSJ: | 0366-02-073 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ FM 758 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $12,778 |
Length: | 0.0 Miles | Actual: | $11,186 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | SH 173 | Let Status: | Actual |
Project ID: | C 421-5-25 | CSJ: | 0421-05-025 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @FM 480 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $13,031 |
Length: | 0.0 Miles | Actual: | $11,432 |
District: | Laredo | Let Date: | JUL 2005 |
Highway: | SH 72 | Let Status: | Actual |
Project ID: | C 483-5-10 | CSJ: | 0483-05-010 |
Description: | INSTALL INTERSECTION FLASHING BEACON FOR STOP SIGN | Handling Code: |
|
Limits From: | @ SH 97 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $11,315 |
Length: | 0.0 Miles | Actual: | $8,433 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | C 517-2-36 | CSJ: | 0517-02-036 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ NORTHERNMOST INT W/SH 72 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $13,316 |
Length: | 0.0 Miles | Actual: | $11,674 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | RM 187 | Let Status: | Actual |
Project ID: | C 678-2-31 | CSJ: | 0678-02-031 |
Description: | INSTALL INTERSECTION FLASHING BEACON FOR STOP SIGN | Handling Code: |
|
Limits From: | @ NORTHERNMOST INT OF FM 337 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $9,659 |
Length: | 0.0 Miles | Actual: | $6,951 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | SH 85 | Let Status: | Actual |
Project ID: | C 748-2-19 | CSJ: | 0748-02-019 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ SH 97 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $11,708 |
Length: | 0.0 Miles | Actual: | $10,318 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | FM 462 | Let Status: | Actual |
Project ID: | C 848-1-32 | CSJ: | 0848-01-032 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ SOUTHERNMOST INTER W/FM 2200 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $12,588 |
Length: | 0.0 Miles | Actual: | $11,006 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | FM 775 | Let Status: | Actual |
Project ID: | C 850-4-20 | CSJ: | 0850-04-020 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ FM 3432 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $21,834 |
Length: | 0.0 Miles | Actual: | $17,559 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | FM 467 | Let Status: | Actual |
Project ID: | C 851-1-21 | CSJ: | 0851-01-021 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ FM 539 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $13,039 |
Length: | 0.0 Miles | Actual: | $11,439 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | FM 476 | Let Status: | Actual |
Project ID: | C 853-1-11 | CSJ: | 0853-01-011 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ FM 2146 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $12,908 |
Length: | 0.0 Miles | Actual: | $11,375 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | RM 1050 | Let Status: | Actual |
Project ID: | C 1169-1-22 | CSJ: | 1169-01-022 |
Description: | INSTALL INTERSECTION FLASHING BEACON FOR STOP SIGN | Handling Code: |
|
Limits From: | @ FM 2748 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $9,558 |
Length: | 0.0 Miles | Actual: | $6,792 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | FM 471 | Let Status: | Actual |
Project ID: | C 1547-1-40 | CSJ: | 1547-01-040 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | AT N AND S INTERSECTIONS OF FM 463 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $24,700 |
Length: | 0.0 Miles | Actual: | $21,825 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | C 2452-4-12 | CSJ: | 2452-04-012 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ FM 1518 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $11,769 |
Length: | 0.0 Miles | Actual: | $10,307 |
District: | San Antonio | Let Date: | JUL 2005 |
Highway: | FM 306 | Let Status: | Actual |
Project ID: | C 3106-1-11 | CSJ: | 3106-01-011 |
Description: | INSTALL INTERSECTION FLASHING BEACON WITH ILLUMINATION | Handling Code: |
|
Limits From: | @ FM 484 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $12,495 |
Length: | 0.0 Miles | Actual: | $10,941 |
Award Status Bid Tabulations Back... |
Totals for 0017-07-086 | ||
Length: | 0.0 Miles | ||
Estimate: | $481,863 | ||
Actual: | $437,266 |
|
|