Detail Letting Schedule for Hartley County (FY 2006)
| Detail Letting Schedule for Hartley County (FY 2006) | ||||
| Last Update: Monday, August 28, 2006 | 
| Hartley County (FY 2006) | 
| CCSJ: 0041-01-039 | |||
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 83 | Let Status: | Actual | 
| Project ID: | C 30-6-47 | CSJ: | 0030-06-047 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | N OF US 60/83 I/C, NORTH | Fund Cat: | 1 | 
| Limits To: | CANADIAN CITY LIMITS | Estimate: | $105,000 | 
| Length: | 0.1 Miles | Actual: | $73,914 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 87 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0041-01-039 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | FM 807 (HARTLEY) | Fund Cat: | 1 | 
| Limits To: | WEST SIDE OF INTERCHANGE | Estimate: | $1,065,184 | 
| Length: | 1.1 Miles | Actual: | $792,664 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 87 | Let Status: | Actual | 
| Project ID: | CPM 41-7-92 | CSJ: | 0041-07-092 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | JCT OF LP 335, NORTH | Fund Cat: | 1 | 
| Limits To: | 1 MI NORTH OF FM 2176 | Estimate: | $200,000 | 
| Length: | 5.1 Miles | Actual: | $137,268 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 287 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0066-03-036 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | END OF CURB & GUTTER (SOUTH) | Fund Cat: | 1 | 
| Limits To: | US 54 | Estimate: | $50,304 | 
| Length: | 1.0 Miles | Actual: | $58,441 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 287 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0066-04-065 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | MCCLARY ROAD (END OF C & G) | Fund Cat: | 1 | 
| Limits To: | SH 152 | Estimate: | $87,009 | 
| Length: | 1.9 Miles | Actual: | $100,731 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 287 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0066-04-066 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | FM 281 | Fund Cat: | 1 | 
| Limits To: | SHERMAN COUNTY LINE | Estimate: | $183,296 | 
| Length: | 2.4 Miles | Actual: | $213,687 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 60 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0170-01-027 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | LIPSCOMB COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | 0.5 MILES NORTH OF US 83 INTER | Estimate: | $444,647 | 
| Length: | 13.3 Miles | Actual: | $511,047 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 60 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0170-02-018 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | OKLAHOMA STATE LINE | Fund Cat: | 1 | 
| Limits To: | HEMPHILL COUNTY LINE | Estimate: | $363,193 | 
| Length: | 11.2 Miles | Actual: | $421,337 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 385 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0226-03-049 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | 7 MILES NORTH OF VEGA CITY LIMITS | Fund Cat: | 1 | 
| Limits To: | FM 1061 | Estimate: | $464,998 | 
| Length: | 14.0 Miles | Actual: | $535,399 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 385 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0226-05-055 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | US 60 | Fund Cat: | 1 | 
| Limits To: | CASTRO COUNTY LINE | Estimate: | $211,437 | 
| Length: | 5.4 Miles | Actual: | $245,833 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 54 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0238-02-032 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | DALLAM COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | MIDDLEWATER | Estimate: | $642,525 | 
| Length: | 20.0 Miles | Actual: | $747,683 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 54 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0238-05-035 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | DALLAM COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | US 287 | Estimate: | $199,544 | 
| Length: | 6.1 Miles | Actual: | $231,282 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | IH 40 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0275-02-064 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | 3 MILES EAST OF POTTER C/L | Fund Cat: | 1 | 
| Limits To: | 3.7 MILES WEST OF CONWAY | Estimate: | $208,774 | 
| Length: | 7.3 Miles | Actual: | $1 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | IH 40 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0275-03-056 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | 3.7 MILES WEST OF CONWAY | Fund Cat: | 1 | 
| Limits To: | 1.6 MILES EAST OF CONWAY | Estimate: | $155,321 | 
| Length: | 5.4 Miles | Actual: | $1 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 759 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0308-05-010 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | HANSFORD COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | SH 70 | Estimate: | $262,214 | 
| Length: | 15.4 Miles | Actual: | $310,037 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 273 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0310-04-023 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | US 60 | Fund Cat: | 1 | 
| Limits To: | LP 171/FM 749 | Estimate: | $73,327 | 
| Length: | 2.0 Miles | Actual: | $85,551 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 15 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0355-05-036 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | SH 207 | Fund Cat: | 1 | 
| Limits To: | SPEARMAN CITY LIMITS | Estimate: | $30,767 | 
| Length: | 0.7 Miles | Actual: | $35,675 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 207 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0355-05-037 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | HUTCHINSON COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | SH 15 | Estimate: | $377,446 | 
| Length: | 11.6 Miles | Actual: | $440,813 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 207 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0355-06-033 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | SH 136 | Fund Cat: | 1 | 
| Limits To: | B 152 (6TH ST IN STINNETT) | Estimate: | $194,339 | 
| Length: | 6.0 Miles | Actual: | $224,979 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 207 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0356-01-093 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | SH 152 | Fund Cat: | 1 | 
| Limits To: | B 152 (6TH STREET IN STINNETT) | Estimate: | $35,605 | 
| Length: | 0.8 Miles | Actual: | $41,209 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 87 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0425-01-016 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | WEST OF US 385 INTERCHANGE | Fund Cat: | 1 | 
| Limits To: | MOORE COUNTY LINE | Estimate: | $378,022 | 
| Length: | 12.5 Miles | Actual: | $440,361 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | US 87 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0425-02-031 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | SH 152 | Fund Cat: | 1 | 
| Limits To: | HARTLEY COUNTY LINE | Estimate: | $349,577 | 
| Length: | 10.6 Miles | Actual: | $406,940 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 70 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0490-04-039 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | 15.0 MILES NORTH OF GRAY C/L | Fund Cat: | 1 | 
| Limits To: | CANADIAN RIVER BRIDGE | Estimate: | $555,452 | 
| Length: | 10.9 Miles | Actual: | $655,493 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 70 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0490-05-015 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | GRAY COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | 7.53 MILES NORTH OF GRAY C/L | Estimate: | $99,765 | 
| Length: | 7.5 Miles | Actual: | $119,430 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 70 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0490-05-016 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | 7.53 MILES NORTH OF GRAY C/L | Fund Cat: | 1 | 
| Limits To: | 15.0 MILES NORTH OF GRAY C/L | Estimate: | $246,248 | 
| Length: | 7.5 Miles | Actual: | $284,374 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | LP 171 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0560-01-025 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | SH 70 SOUTH | Fund Cat: | 1 | 
| Limits To: | SH 273/FM 749 | Estimate: | $45,242 | 
| Length: | 1.0 Miles | Actual: | $52,213 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 273 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0560-01-026 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | LP 171/FM 749 | Fund Cat: | 1 | 
| Limits To: | 0.3 MILES EAST OF LP 171 (NORTH) | Estimate: | $93,885 | 
| Length: | 2.4 Miles | Actual: | $108,670 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 305 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0582-02-015 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | LIPSCOMB COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | HEMPHILL COUNTY LINE | Estimate: | $184,418 | 
| Length: | 12.3 Miles | Actual: | $218,787 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 305 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0582-03-011 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | LIPSCOMB COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | US 60 | Estimate: | $50,687 | 
| Length: | 3.2 Miles | Actual: | $59,392 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 119 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0727-01-030 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | FM 281 SOUTH | Fund Cat: | 1 | 
| Limits To: | SHERMAN COUNTY LINE | Estimate: | $107,617 | 
| Length: | 3.3 Miles | Actual: | $124,619 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 119 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0727-03-012 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | MOORE COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | FM 1573 | Estimate: | $154,304 | 
| Length: | 5.8 Miles | Actual: | $178,667 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 1261 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0790-06-017 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | SH 207 | Fund Cat: | 1 | 
| Limits To: | OKLAHOMA STATE LINE | Estimate: | $321,513 | 
| Length: | 22.7 Miles | Actual: | $377,076 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | RM 687 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0791-04-008 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | SH 136 | Fund Cat: | 1 | 
| Limits To: | FM 1319 | Estimate: | $133,868 | 
| Length: | 5.4 Miles | Actual: | $152,741 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 136 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0791-05-018 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | HUTCHINSON COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | SH 15 | Estimate: | $452,675 | 
| Length: | 16.1 Miles | Actual: | $521,736 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 1268 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0798-02-012 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | FM 748 | Fund Cat: | 1 | 
| Limits To: | HEMPHILL COUNTY LINE | Estimate: | $104,978 | 
| Length: | 5.3 Miles | Actual: | $125,041 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 1268 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0798-03-012 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | ROBERTS COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | US 83 | Estimate: | $244,474 | 
| Length: | 11.6 Miles | Actual: | $284,861 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 277 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0798-04-020 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | US 83 | Fund Cat: | 1 | 
| Limits To: | FM 2654 | Estimate: | $355,070 | 
| Length: | 15.5 Miles | Actual: | $415,023 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 809 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0801-01-011 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | IH 40 SFR | Fund Cat: | 1 | 
| Limits To: | DEAF SMITH COUNTY LINE | Estimate: | $64,680 | 
| Length: | 1.8 Miles | Actual: | $75,419 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 809 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 0801-02-018 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | OLDHAM COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | US 60 | Estimate: | $477,261 | 
| Length: | 19.0 Miles | Actual: | $550,634 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SH 102 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 1141-02-018 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | US 87 | Fund Cat: | 1 | 
| Limits To: | NEW MEXICO STATE LINE | Estimate: | $560,851 | 
| Length: | 22.7 Miles | Actual: | $648,036 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 807 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 1142-01-017 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | US 54 | Fund Cat: | 1 | 
| Limits To: | US 287 | Estimate: | $365,591 | 
| Length: | 18.2 Miles | Actual: | $432,980 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 807 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 1622-01-030 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | FM 281 | Fund Cat: | 1 | 
| Limits To: | US 87 | Estimate: | $179,283 | 
| Length: | 11.7 Miles | Actual: | $211,252 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 998 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 1622-02-019 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | US 54 | Fund Cat: | 1 | 
| Limits To: | US 87 | Estimate: | $380,056 | 
| Length: | 18.1 Miles | Actual: | $440,649 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 1920 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 1819-01-012 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | SH 305 | Fund Cat: | 1 | 
| Limits To: | HEMPHILL COUNTY LINE | Estimate: | $331,666 | 
| Length: | 15.1 Miles | Actual: | $391,535 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 1920 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 1819-02-009 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | LIPSCOMB COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | US 60 | Estimate: | $135,151 | 
| Length: | 6.4 Miles | Actual: | $158,207 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 2375 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 1861-01-011 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | FM 749 | Fund Cat: | 1 | 
| Limits To: | SPUR 398 | Estimate: | $155,745 | 
| Length: | 6.8 Miles | Actual: | $182,320 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 1342 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 1884-01-008 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | FM 293 | Fund Cat: | 1 | 
| Limits To: | POTTER COUNTY LINE | Estimate: | $255,015 | 
| Length: | 12.4 Miles | Actual: | $302,423 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 2203 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 2000-01-014 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | SH 152 | Fund Cat: | 1 | 
| Limits To: | FM 119 | Estimate: | $154,310 | 
| Length: | 4.0 Miles | Actual: | $179,909 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 2219 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 2002-02-013 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | CITY LAKE ROAD | Fund Cat: | 1 | 
| Limits To: | FM 168 | Estimate: | $101,502 | 
| Length: | 5.9 Miles | Actual: | $116,425 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 2300 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 2126-02-018 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | US 60 | Fund Cat: | 1 | 
| Limits To: | CARSON COUNTY LINE | Estimate: | $430,983 | 
| Length: | 21.0 Miles | Actual: | $493,023 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 2300 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 2126-03-007 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | B IH 40 | Fund Cat: | 1 | 
| Limits To: | GRAY COUNTY LINE | Estimate: | $77,879 | 
| Length: | 2.4 Miles | Actual: | $90,362 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 3395 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 2129-02-005 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | FM 1913 | Fund Cat: | 1 | 
| Limits To: | HUTCHINSON COUNTY LINE | Estimate: | $31,290 | 
| Length: | 1.3 Miles | Actual: | $36,898 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 3395 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 2129-03-005 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | MOORE COUNTY LINE | Fund Cat: | 1 | 
| Limits To: | RM 1319 | Estimate: | $79,761 | 
| Length: | 4.1 Miles | Actual: | $91,512 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 2373 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 2218-01-029 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | US 60 | Fund Cat: | 1 | 
| Limits To: | FM 293 | Estimate: | $143,717 | 
| Length: | 4.6 Miles | Actual: | $165,175 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 2387 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 2335-01-011 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | SH 15 | Fund Cat: | 1 | 
| Limits To: | FM 1261 | Estimate: | $141,150 | 
| Length: | 9.6 Miles | Actual: | $162,601 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | LP 171 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 2403-01-010 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | SH 273 | Fund Cat: | 1 | 
| Limits To: | SH 70 NORTH | Estimate: | $321,111 | 
| Length: | 6.2 Miles | Actual: | $367,606 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | LP 143 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 2613-01-018 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | US 83 NORTH | Fund Cat: | 1 | 
| Limits To: | FM 1267 | Estimate: | $327,483 | 
| Length: | 9.8 Miles | Actual: | $379,624 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | SP 192 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 2620-01-009 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | LOOP 143 | Fund Cat: | 1 | 
| Limits To: | SH 15 | Estimate: | $42,929 | 
| Length: | 1.3 Miles | Actual: | $49,992 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 3045 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 2726-02-006 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | SH 70 | Fund Cat: | 1 | 
| Limits To: | FM 376 | Estimate: | $185,677 | 
| Length: | 8.5 Miles | Actual: | $221,414 | 
| District: | Amarillo | Let Date: | OCT 2005 | 
| Highway: | FM 2943 | Let Status: | Actual | 
| Project ID: | STP 2005(968) | CSJ: | 3164-01-009 | 
| Description: | SEAL COAT | Handling Code: | |
| Limits From: | US 60 | Fund Cat: | 1 | 
| Limits To: | FM 1062 | Estimate: | $221,609 | 
| Length: | 10.2 Miles | Actual: | $262,913 | 
| Back... | Totals for 0041-01-039 | ||
|---|---|---|---|
| Length: | 505.5 Miles | ||
| Estimate: | $14,397,425 | ||
| Actual: | $15,743,885 | ||
| CCSJ: 0238-01-028 | |||
| District: | Amarillo | Let Date: | DEC 2005 | 
| Highway: | US 54 | Let Status: | Actual | 
| Project ID: | C 238-1-28 | CSJ: | 0238-01-028 | 
| Description: | OVERLAY | Handling Code: | |
| Limits From: | MIDDLEWATER | Fund Cat: | 1 | 
| Limits To: | NEW MEXICO STATE LINE | Estimate: | $3,866,317 | 
| Length: | 19.8 Miles | Actual: | $3,848,276 | 
| Back... | Totals for 0238-01-028 | ||
| Length: | 19.8 Miles | ||
| Estimate: | $3,866,317 | ||
| Actual: | $3,848,276 | ||
| 
 
 | 
|  |