Detail Letting Schedule for Hunt County (FY 2009)

 
 
Last Update: Monday, November 9, 2009
Hunt County (FY 2009)

CCSJ: 0009-13-149

District: Paris Let Date: MAY 2009
Highway: IH 30 Let Status: Actual
Project ID: IM 0302(096) CSJ: 0009-13-149
Description: MILL & HEAVY OVERLAY WITH HOT MIX & TBPFC Handling
Code:
 
Limits From: ROCKWALL COUNTY LINE Fund Cat: 1
Limits To: 1.51 MI W OF SH 34 Estimate: $8,549,741
Length: 12.4 Miles Actual: $7,339,942
 
Back...

Totals for 0009-13-149
Length: 12.4 Miles
Estimate: $8,549,741
Actual: $7,339,942

CCSJ: 0135-07-039

District: Paris Let Date: MAY 2009
Highway: US 380 Let Status: Actual
Project ID: NH 2009(450) CSJ: 0135-07-039
Description: RECONST TO 4 LANE DIVIDED RURAL AND REPLACE BRIDGES Handling
Code:
 
Limits From: 0.395 MILES EAST OF FM 903 Fund Cat: 4
Limits To: US 69 Estimate: $19,130,044
Length: 4.2 Miles Actual: $17,631,267
 
Back...

Totals for 0135-07-039
Length: 4.2 Miles
Estimate: $19,130,044
Actual: $17,631,267

CCSJ: 0173-07-048

District: Paris Let Date: MAR 2009
Highway: SH 34 Let Status: Actual
Project ID: STP 2009(372) CSJ: 0173-07-048
Description: MILL AND OVERLAY Handling
Code:
 
Limits From: JOHNSON STREET Fund Cat: 1
Limits To: US 69 / US 380 Estimate: $369,531
Length: 0.9 Miles Actual: $308,820
 
Back...

Totals for 0173-07-048
Length: 0.9 Miles
Estimate: $369,531
Actual: $308,820

CCSJ: 2035-01-015

District: Paris Let Date: MAR 2009
Highway: FM 2101 Let Status: Actual
Project ID: STP 2009(414) CSJ: 2035-01-015
Description: REHAB EXIST ROAD Handling
Code:
 
Limits From: FM 1570 Fund Cat: 1
Limits To: FM 1564 Estimate: $2,367,980
Length: 4.9 Miles Actual: $1,582,859
 
Back...

Totals for 2035-01-015
Length: 4.9 Miles
Estimate: $2,367,980
Actual: $1,582,859


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract