Detail Letting Schedule for Maverick County (FY 2009)

 
 
Last Update: Monday, November 9, 2009
Maverick County (FY 2009)

CCSJ: 0299-03-047

District: Laredo Let Date: APR 2009
Highway: US 277 Let Status: Actual
Project ID: STP 2009(499)ES CSJ: 0299-03-047
Description: REHABILITATION OF AN EXISTING ROADWAY Handling
Code:
 
Limits From: 2.899 MI NORTH OF FM 1664 Fund Cat: 11
Limits To: 0.222 MI S OF FM 1666 Estimate: $3,654,796
Length: 5.9 Miles Actual: $2,829,392
 
Back...

Totals for 0299-03-047
Length: 5.9 Miles
Estimate: $3,654,796
Actual: $2,829,392

CCSJ: 0299-14-006

District: Laredo Let Date: APR 2009
Highway: SL 480 Let Status: Actual
Project ID: STP 2006(716) CSJ: 0299-14-006
Description: EAGLE PASS INTERNATIONAL BRIDGE ROADWAY AND CONSTRUCT A 2 Handling
Code:
 
Limits From: 0.556 MI NORTH OF FM 1021 Fund Cat: 4
Limits To: 0.417 MI SOUTH OF US 277 Estimate: $16,542,995
Length: 2.0 Miles Actual: $10,664,023
 
District: Laredo Let Date: APR 2009
Highway: SL 480 Let Status: Actual
Project ID: STP 2006(716) CSJ: 0299-14-007
Description: FOR THE CONSTRUCTION OF A 2 LANE UNDIVIDED FACILITY Handling
Code:
 
Limits From: 0.492 MI NORTH OF US 277 Fund Cat: 4
Limits To: 0.320 MI SOUTH OF US 57 Estimate: $10,671,369
Length: 1.8 Miles Actual: $6,656,978
 
District: Laredo Let Date: APR 2009
Highway: SL 480 Let Status: Actual
Project ID: STP 2006(716) CSJ: 0299-14-015
Description: FOR THE CONSTRUCTION OF AN INTERCHANGE Handling
Code:
 
Limits From: 0.417 MI SOUTH OF US 277 Fund Cat: 4
Limits To: 0.492 MI NORTH OF US 277 Estimate: $13,100,278
Length: 0.9 Miles Actual: $8,785,650
 
Back...

Totals for 0299-14-006
Length: 4.7 Miles
Estimate: $40,314,642
Actual: $26,106,651

CCSJ: 2636-01-007

District: Laredo Let Date: APR 2009
Highway: FM 2644 Let Status: Actual
Project ID: STP 2009(500)ES CSJ: 2636-01-007
Description: RESTORATION OF AN EXISTING HIGHWAY Handling
Code:
 
Limits From: DIMMIT COUNTY LINE Fund Cat: 11
Limits To: FM 1021 Estimate: $4,610,817
Length: 12.3 Miles Actual: $2,325,707
 
Back...

Totals for 2636-01-007
Length: 12.3 Miles
Estimate: $4,610,817
Actual: $2,325,707


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract