Letting Schedule for April, 2009 (FY 2009)
Letting Schedule for April, 2009 (FY 2009) | ||||
Last Update: Monday, November 9, 2009 |
April, 2009 (FY 2009) | (see Links) |
SEP 2008 | OCT 2008 | NOV 2008 | DEC 2008 | JAN 2009 | FEB 2009 | MAR 2009 | APR 2009 | MAY 2009 | JUN 2009 | JUL 2009 | AUG 2009 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0123-01-034 | Anderson/ Tyler |
US 84 | Actual | $4,110,707 | 1 | ADD SHOULDERS & RESURFACE ROADWAY |
0548-01-036 | Andrews/ Odessa |
SH 115 | Actual | $4,077,150 | 1 | ROADWAY REHABILITATION |
0137-05-028 | Archer/ Wichita Falls |
SH 25 | Actual | $3,147,193 | 1 | EXTEND CULVERTS AND ADD SHOULDERS |
0042-03-038 | Armstrong/ Amarillo |
US 287 | Actual | $8,895,225 | 1 | REHAB EXISTING ROADWAY |
1258-01-021 | Austin/ Yoakum |
FM 1093 | Actual | $2,543,608 | 1 | GRADING, BASE, SURFACING |
0100-07-045 | Bee/ Corpus Christi |
US 181 | Actual | $2,643,873 | 1 | UNDERSEAL AND OVERLAY |
0015-05-043 | Bell/ Waco |
SH 317 | Actual | $1,287,408 | 1 | REPAIR AND RESURFACE WITH ASPHALT PAVEMENT |
2304-02-034 | Bell/ Waco |
FM 2410 | Actual | $462,938 | 1 | CONSTRUCT TURN LANES AND RESURFACE PAVEMENT TO IMPROVE |
3534-02-002 | Bell/ Waco |
SH 201 | Actual | $1,220,439 | 3 | ADD TURN LANES, TRAFFIC SIGNAL AND LIGHTING FOR IMPROVED |
0915-12-401 | Bexar/ San Antonio |
CS | Actual | $3,715,900 | 9 | REHABILITATION OF TRUSS SPANS AND APPROACHES FOR |
0253-01-047 | Blanco/ Austin |
US 281 | Actual | $610,453 | 1 | MILL, SEAL & THIN OVERLAY |
0178-03-138 | Brazoria/ Houston |
SH 35 | Actual | $3,249,044 | 1 | ONE - COURSE SURFACE TREATMENT, ASPHALT CONCRETE PAVEMENT |
0587-01-056 | Brazoria/ Houston |
FM 1495 | Actual | $9,785 | 10 | LANDSCAPE DEVELOPMENT |
1004-02-014 | Brazoria/ Houston |
FM 524 | Actual | $1,360,459 | 1 | ASPHALT OVERLAY AND PAVEMENT MARKINGS |
0116-04-096 | Brazos/ Bryan |
SH 21 | Actual | $672,161 | 1 | OVERLAY CONSISTING OF A SURFACE TREATMENT, HMA OVERLAY AND |
0506-01-093 | Brazos/ Bryan |
FM 60 | Actual | $892,020 | 1 | OVERLAY CONSISTING OF SPOT REPAIRS, SURFACE TREATMENT, HMA |
1316-01-053 | Brazos/ Bryan |
FM 1179 | Actual | $298,092 | 1 | OVERLAY CONSISTING OF A SURFACE TREATMENT, HMA OVERLAY AND |
0924-35-017 | Brewster/ El Paso |
VA | Actual | $199,747 | 10 | REPLACE EXISTING CULVERT |
0054-06-090 | Brown/ Brownwood |
US 67 | Actual | $1,562,250 | 1 | MILL AND OVERLAY |
0648-03-046 | Burleson/ Bryan |
FM 60 | Actual | $7,507,830 | 4 | WIDEN TO 4 LANE DIVIDED HIGHWAY |
0277-03-024 | Cass/ Atlanta |
SH 77 | Actual | $2,023,245 | 1 | WIDEN TO ADD SHOULDERS AND RESURFACE 2 - LANE RURAL HIGHWAY |
0569-01-048 | Cass/ Atlanta |
SH 43 | Actual | $886,614 | 1 | WIDEN TO ADD SHOULDERS AND RESURFACE 2 - LANE RURAL HIGHWAY |
1291-01-012 | Castro/ Lubbock |
FM 1055 | Actual | $7,983,726 | 11 | REHABILITATION OF EXISTING ROAD |
0242-03-068 | Chambers/ Beaumont |
SH 61 | Actual | $814,457 | 1 | OVERLAY EXISTING ROADWAY & SEAL COAT |
0508-03-090 | Chambers/ Beaumont |
IH 10 | Actual | $813,244 | 1 | SPOT LEVEL UP & OVERLAY |
0925-08-017 | Childress/ Childress |
CR | Actual | $1,237,606 | 1 | REPLACEMENT OF EXISTING BRIDGE FACILITY |
3106-01-012 | Comal/ San Antonio |
FM 306 | Actual | $5,146,936 | 1 | WIDEN NARROW ROADWAY TO ADD SHOULDERS AND PASSING LANES |
0870-04-037 | Concho/ San Angelo |
FM 765 | Actual | $480,667 | 8 | ADD SHOULDERS |
0194-02-088 | Cooke/ Wichita Falls |
IH 35 | Actual | $2,396,646 | 1 | HEAVY HOT MIX OVERLAY |
0055-03-023 | Coryell/ Waco |
US 84 | Actual | $8,735,023 | 1 | REHABILITATE ROADWAY, ADD PASSING LANES AND SHOULDERS |
0047-07-214 | Dallas/ Dallas |
US 75 | Actual | $8,650 | 10 | LANDSCAPE DEVELOPMENT |
1047-02-044 | Dallas/ Dallas |
FM 1382 | Actual | $1,388,408 | 1 | INTERSECTION APPROACH WIDENING, SIGNAL UPGRADES AND |
1310-01-033 | Denton/ Dallas |
FM 407 | Actual | $690,968 | 8 | REALIGN INTERSECTION |
0913-00-083 | Dewitt/ Yoakum |
VA | Actual | $809,348 | 1 | MILLING, MICRO - SURFACING & PAVEMENT MARKINGS |
0913-00-084 | Dewitt/ Yoakum |
VA | Actual | $2,763,094 | 1 | MILLING, PFC AND PAVEMENT MARKINGS |
0042-07-058 | Donley/ Childress |
US 287 | Actual | $750,868 | 1 | PLANING AND HOT MIX |
0086-10-043 | Duval/ Laredo |
SH 359 | Actual | $733,054 | 11 | REHABILITATION OF AN EXISTING ROADWAY |
0235-02-043 | Edwards/ San Angelo |
SH 55 | Actual | $2,489,937 | 1 | CONSTRUCT BRIDGE AND APPROACHES |
1281-01-016 | El Paso/ El Paso |
FM 1110 | Actual | $299,900 | 1 | OVERLAY |
2326-01-020 | El Paso/ El Paso |
FM 2529 | Actual | $596,778 | 1 | OVERLAY, MILL AND INLAY |
2552-04-039 | El Paso/ El Paso |
LP 375 | Actual | $1,325,045 | 1 | MILL AND INLAY AND BRIDGE DECK REPAIR |
0211-06-053 | Fayette/ Yoakum |
US 77 | Actual | $955,283 | 1 | PAVEMENT REPAIR AND ACP SURFACING |
0027-06-055 | Fort Bend/ Houston |
US 90A | Actual | $1,118,222 | 1 | BASE REPAIR AND OVERLAY |
0111-03-054 | Fort Bend/ Houston |
FM 521 | Actual | $653,888 | 1 | BASE REPAIR AND OVERLAY |
0188-01-036 | Fort Bend/ Houston |
SH 36 | Actual | $1,269,485 | 1 | REPLACE ASPHALT WITH CONCRETE |
0912-34-127 | Fort Bend/ Houston |
CR | Actual | $1,439,644 | 6 | REPLACE BRIDGE AND APPROACHES |
0912-34-133 | Fort Bend/ Houston |
CR | Actual | $1,529,235 | 6 | REPLACE BRIDGE (NBI# 12080AA0697002) |
1258-02-031 | Fort Bend/ Houston |
FM 1093 | Actual | $821,886 | 1 | BASE REPAIR AND OVERLAY |
3223-01-009 | Fort Bend/ Houston |
FM 3155 | Actual | $207,545 | 1 | BASE REPAIR AND OVERLAY |
3510-04-027 | Fort Bend/ Houston |
SH 99 | Actual | $390,000 | 1 | DRAINAGE IMPROVEMENTS ON TXDOT AND MUD 50 ROW |
0456-03-015 | Freestone/ Bryan |
FM 80 | Actual | $2,957,147 | 1 | RESTORATION OF EXISTING ROAD CONSISTING OF GRADING, |
0748-04-036 | Frio/ San Antonio |
FM 140 | Actual | $656,093 | 1 | INSTALL CURB INLETS & STORM SEWER SYSTEM |
0367-02-073 | Galveston/ Houston |
SH 87 | Actual | $6,167,954 | 1 | RAISE, REHABILITATE AND OVERLAY (TO 5 YR. STORM ELEVATION) |
0389-11-057 | Galveston/ Houston |
LP 197 | Actual | $646,223 | 1 | BASE REPAIRS, MILLING & 1.5" ASPHALT OVERLAY |
0912-73-114 | Galveston/ Houston |
CR | Actual | $313,362 | 1 | REPLACE BRIDGE |
0976-07-009 | Galveston/ Houston |
SH 96 | Actual | $194,000 | 10 | LANDSCAPE DEVELOPMENT |
0510-01-022 | Grayson/ Paris |
FM 902 | Actual | $1,876,832 | 1 | REHABILITATE EXISTING ROADWAY |
0729-01-034 | Grayson/ Paris |
FM 121 | Actual | $3,701,118 | 1 | REHABILITATE EXISTING ROADWAY |
0096-06-071 | Gregg/ Tyler |
US 80 | Actual | $1,766,929 | 1 | PLANE & RESURFACE ROADWAY |
0393-01-088 | Gregg/ Tyler |
US 259 | Actual | $2,312,518 | 1 | PLANE & RESURFACE ROADWAY |
0025-03-089 | Guadalupe/ San Antonio |
IH 10 | Actual | $1,193,605 | 1 | REMOVE EXIST STRIPING AND RESTRIPE WBML FOR EMERGENCY LANE |
2125-01-011 | Hale/ Lubbock |
FM 2286 | Actual | $2,448,351 | 11 | OVERLAY |
0704-03-012 | Hall/ Childress |
FM 94 | Actual | $3,563,721 | 1 | REHABILITATION OF EXISTING ROADWAY |
0784-01-043 | Hardin/ Beaumont |
FM 418 | Actual | $383,159 | 1 | OVERLAY EXISTING ROADWAY |
0811-01-010 | Hardin/ Beaumont |
FM 420 | Actual | $657,758 | 1 | RESTORE EXISTING ROADWAY |
0028-02-087 | Harris/ Houston |
US 90 | Actual | $1,241,291 | 1 | MILL, SEAL COAT, BASE REPAIR AND ACP OVERLAY |
0050-08-081 | Harris/ Houston |
US 290 | Actual | $60,920 | 10 | LANDSCAPE DEVELOPMENT (MATERIAL PURCHASE) |
0050-08-088 | Harris/ Houston |
US 290 | Actual | $118,220 | 1 | CRACK & SPALL REPAIR, FULL DEPTH CONCRETE REPAIR (IN |
0502-01-201 | Harris/ Houston |
SH 225 | Actual | $298,000 | 10 | LANDSCAPE DEVELOPMENT |
0502-01-203 | Harris/ Houston |
SH 225 | Actual | $882,735 | 1 | FULL DEPTH CONCRETE REPAIR AND REPAIR OF SPALLING IN |
0912-00-350 | Harris/ Houston |
VA | Actual | $1,289,999 | 5 | NEW TRAFFIC SIGNALS |
0912-72-118 | Harris/ Houston |
VA | Actual | $1,025,616 | 1 | ITS IMPROVEMENTS |
1258-04-058 | Harris/ Houston |
FM 1093 | Actual | $4,459,706 | 1 | 2" PLANING, 2" ACP OVERLAY, PAVEMENT MARKINGS |
3050-03-016 | Harris/ Houston |
FM 2978 | Actual | $366,817 | 1 | GRADING, LIME TREATED SUBGRADE, CEMENT TREATED BASE, |
0366-01-065 | Hays/ Austin |
SH 123 | Actual | $292,811 | 1 | OVERLAY |
2293-01-021 | Hays/ Austin |
FM 2439 | Actual | $301,864 | 1 | SEAL & THIN OVERLAY |
0163-04-053 | Henderson/ Tyler |
SH 31 | Actual | $2,119,884 | 1 | PLANE & RESURFACE ROADWAY |
0342-01-078 | Hidalgo/ Pharr |
SH 107 | Actual | $2,143,339 | 1 | FULL DEPTH REPAIR BOTH LANES |
0080-03-050 | Hood/ Fort Worth |
US 377 | Actual | $1,789,001 | 1 | MILL 2" AND HMAC OVERLAY |
0937-03-015 | Houston/ Lufkin |
FM 227 | Actual | $2,691,342 | 1 | RECONSTRUCT AND WIDEN EXISTING PAVEMENT |
0005-05-101 | Howard/ Abilene |
IH 20 | Actual | $4,997,460 | 1 | FLEXIBLE PAVEMENT REPAIR & ACP OVERLAY |
0077-04-028 | Irion/ San Angelo |
US 67 | Actual | $1,945,560 | 1 | RESTORATION OF EXISTING ROADWAY |
0784-03-014 | Jasper/ Beaumont |
FM 1131 | Actual | $2,569,366 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0508-04-154 | Jefferson/ Beaumont |
SH 73 | Actual | $4,097,311 | 1 | OVERLAY EXISTING ROADWAY AND BASE REPAIRS |
0667-01-110 | Jefferson/ Beaumont |
SH 347 | Actual | $3,516,358 | 1 | OVERLAY EXISTING ROADWAY |
0255-01-068 | Jim Wells/ Corpus Christi |
BU 281R | Actual | $684,659 | 1 | OVERLAY ROADWAY |
0383-03-022 | Jim Wells/ Corpus Christi |
SH 141 | Actual | $3,060,295 | 1 | REHAB. EXISTING ROADWAY |
0014-03-089 | Johnson/ Fort Worth |
IH 35W | Actual | $5,560,047 | 1 | RECONSTRUCT MAIN LANES |
0259-04-036 | Johnson/ Fort Worth |
US 67 | Actual | $662,994 | 11 | PAVEMENT REPAIR AND OVERLAY |
0519-01-026 | Johnson/ Fort Worth |
SH 174 | Actual | $1,833,527 | 11 | HMAC OVERLAY |
0918-11-065 | Kaufman/ Dallas |
CR | Actual | $388,178 | 6 | REPLACE BRIDGE AND APPROACHES |
0193-01-035 | Kerr/ San Antonio |
SH 39 | Actual | $1,048,332 | 1 | REPLACE BRIDGE AND APPROACHES |
0829-04-029 | Kerr/ San Antonio |
FM 1340 | Actual | $518,704 | 6 | REPLACE BRIDGE AND APPROACHES |
0855-05-009 | Kerr/ San Antonio |
FM 1350 | Actual | $827,437 | 1 | REMOVE & REPLACE GUADALUPE RVR BRIDGE & RECONST APPROACHES |
0680-01-012 | Lamar/ Paris |
FM 196 | Actual | $896,178 | 1 | REHAB EXIST ROAD |
1320-01-021 | Lamar/ Paris |
FM 1498 | Actual | $2,447,477 | 1 | REHAB EXIST ROAD |
0675-03-068 | Leon/ Bryan |
IH 45 | Actual | $6,623,247 | 1 | OVERLAY CONSISTING OF CONCRETE PAVEMENT REPAIR, A ONE COURSE |
0389-01-036 | Liberty/ Beaumont |
SH 146 | Actual | $11,450,611 | 4 | WIDEN ROADWAY FROM 2 LANES TO 4 LANES |
0593-01-106 | Liberty/ Beaumont |
SH 321 | Actual | $452,456 | 8 | ADD LEFT TURN LANE |
0700-04-037 | Llano/ Austin |
SH 71 | Actual | $328,245 | 1 | MILL, SEAL & OVERLAY |
0905-06-077 | Lubbock/ Lubbock |
VA | Actual | $6,219,330 | 11 | IH 27 PAVEMENT REPAIR |
0917-31-006 | Madison/ Bryan |
CR | Actual | $287,146 | 6 | REPLACE BRIDGE AND APPROACHES |
0494-02-023 | Martin/ Odessa |
SH 137 | Actual | $1,435,028 | 1 | PAVEMENT STRUCTURE RESTORATION |
0179-04-089 | Matagorda/ Yoakum |
SH 35 | Actual | $567,067 | 1 | ASPHALTIC CONCRETE PAVEMENT |
0847-01-013 | Matagorda/ Yoakum |
FM 521 | Actual | $1,857,490 | 1 | REHABILITATE ROADWAY |
0299-03-047 | Maverick/ Laredo |
US 277 | Actual | $2,829,392 | 11 | REHABILITATION OF AN EXISTING ROADWAY |
0299-14-006 | Maverick/ Laredo |
SL 480 | Actual | $26,106,651 | 4 | EAGLE PASS INTERNATIONAL BRIDGE ROADWAY AND CONSTRUCT A 2 |
2636-01-007 | Maverick/ Laredo |
FM 2644 | Actual | $2,325,707 | 11 | RESTORATION OF AN EXISTING HIGHWAY |
1082-05-001 | McCulloch/ Brownwood |
FM 3533 | Actual | $664,615 | 11 | CONSTRUCT NEW FM ROAD |
0015-21-011 | McLennan/ Waco |
FM 3476 | Actual | $615,787 | 1 | ADDITION OF TURN LANE ON BAGBY AVE |
0055-08-110 | McLennan/ Waco |
US 84 | Actual | $72,085 | 1 | CONSTRUCTION OF SCENIC ENHANCEMENT CONSISTING OF CITY OF |
0017-05-073 | Medina/ San Antonio |
IH 35 | Actual | $2,256,919 | 1 | CONSTRUCT NB EXIT RAMP AT CR 770 |
0848-01-030 | Medina/ San Antonio |
FM 462 | Actual | $1,844,945 | 1 | WIDEN NARROW ROADWAY & ADD SHOULDERS |
0177-14-026 | Montgomery/ Houston |
LP 494 | Actual | $4,317,264 | 1 | WIDEN SUBGRADE, OCST AND ACP OVERLAY |
0912-37-200 | Montgomery/ Houston |
VA | Actual | $743,781 | 1 | FAULT LINE BASE REPAIRS |
0222-03-056 | Morris/ Atlanta |
SH 11 | Actual | $991,156 | 1 | WIDEN TO ADD SHOULDERS AND RESURFACE 4 - LANE DIVIDED RURAL |
0138-06-039 | Nacogdoches/ Lufkin |
US 259 | Actual | $3,421,618 | 1 | RESURFACE WITH POROUS FRICTION COURSE |
1289-01-028 | Navarro/ Dallas |
FM 1126 | Actual | $7,287,236 | 1 | OV - ASPHALTIC CONCRETE PAVEMENT, OVERLAY, RESTORE PAVEMENT |
0304-08-012 | Newton/ Beaumont |
FM 1415 | Actual | $1,043,652 | 1 | UPGRADE BRIDGE RAIL |
0916-35-155 | Nueces/ Corpus Christi |
CS | Actual | $8,046,329 | 7 | RECONSTRUCT & ADD TURN LANES & ACCESS IMPROVEMENTS |
0030-02-041 | Ochiltree/ Amarillo |
US 83 | Actual | $1,366,894 | 1 | REHAB EXISTING RDWY |
0784-05-034 | Orange/ Beaumont |
FM 1132 | Actual | $525,420 | 1 | MILL & OVERLAY EXISTING ROADWAY, SEAL COAT |
0247-02-043 | Panola/ Atlanta |
US 79 | Actual | $2,384,758 | 1 | WIDEN TO ADD SHOULDERS AND RESURFACE 4 - LANE RURAL HIGHWAY |
0008-03-096 | Parker/ Fort Worth |
US 180 | Actual | $3,460,812 | 11 | 2 INCH OVERLAY |
0365-01-042 | Parker/ Fort Worth |
SH 171 | Actual | $682,212 | 11 | MILL 1.5 INCH, FABRIC, HMAC OVERLAY AND TRAFFIC SIGNAL LOOPS |
0866-06-018 | Pecos/ Odessa |
US 385 | Actual | $1,498,725 | 1 | PAVEMENT STRUCTURE RESTORATION |
0371-02-066 | Refugio/ Corpus Christi |
US 77 | Actual | $2,087,652 | 1 | MILL AND OVERLAY__ (NORTH BOUND LANES ONLY) |
0138-02-034 | Rusk/ Tyler |
US 259 | Actual | $2,886,918 | 1 | PLANE & RESURFACE ROADWAY |
0911-30-019 | San Augustine/ Lufkin |
CR | Actual | $531,181 | 6 | REPLACE BRIDGE AND APPROACHES |
0371-05-016 | San Patricio/ Corpus Christi |
FM 2046 | Actual | $812,909 | 1 | REHAB AND WIDEN ROADWAY |
0371-07-006 | San Patricio/ Corpus Christi |
BU 77-T | Actual | $820,343 | 1 | MILL, SEAL AND OVERLAY |
0507-01-017 | San Patricio/ Corpus Christi |
SH 234 | Actual | $1,288,706 | 1 | REHAB AND WIDEN ROADWAY |
0175-02-080 | Shelby/ Lufkin |
US 84 | Actual | $4,664,749 | 1 | REHAB EXISTING PAVEMENT |
0743-02-022 | Shelby/ Lufkin |
FM 138 | Actual | $1,199,984 | 1 | RECONSTRUCT AND WIDEN EXISTING PAVEMENT |
0190-05-058 | Smith/ Tyler |
US 69 | Actual | $2,499,423 | 1 | RESURFACE ROADWAY |
2075-01-048 | Smith/ Tyler |
LP 323 | Actual | $5,403,450 | 10 | CONSTRUCT RAISED MEDIAN |
0039-01-073 | Starr/ Pharr |
US 83 | Actual | $6,758,353 | 1 | OVERLAY |
1227-03-013 | Starr/ Pharr |
FM 1017 | Actual | $935,976 | 1 | FULL DEPTH REPAIR BOTH LANES |
0008-14-110 | Tarrant/ Fort Worth |
IH 820 | Actual | $3,967,560 | 11 | PAVEMENT AND BRIDGE JOINT REPAIR WITH 2" HMAC OVERLAY |
0363-01-133 | Tarrant/ Fort Worth |
SH 26 | Actual | $744,508 | 11 | PAVEMENT REPAIR, 2" MILLING, AND 2" HMAC OVERLAY WITH |
0747-03-076 | Tarrant/ Fort Worth |
FM 157 | Actual | $662,733 | 11 | REPAIR FAILURES AND OVERLAY WITH 2 INCHES |
0902-48-745 | Tarrant/ Fort Worth |
VA | Actual | $1,065,751 | 11 | VARIOUS LOCATIONS FOR EXPANSION JOINT REPAIRS IN NORTH |
0908-33-075 | Taylor/ Abilene |
CR | Actual | $508,786 | 1 | REPLACE BRIDGE & APPROACHES |
0914-00-241 | Travis/ Austin |
VA | Actual | $426,096 | 7 | PURCHASE BUSES |
0914-00-242 | Travis/ Austin |
VA | Actual | $414,338 | 7 | PURCHASE BUSES |
0914-00-283 | Travis/ Austin |
VA | Actual | $899,142 | 1 | NON - SITE SPECIFIC SIGNALS |
1378-01-033 | Travis/ Austin |
RM 1431 | Actual | $3,300,717 | 1 | SEAL & THIN OVERLAY |
3136-01-162 | Travis/ Austin |
LP 1 | Actual | $1,696,542 | 1 | MILL, SEAL & THIN OVERLAY |
3136-01-165 | Travis/ Austin |
LP 1 | Actual | $2,330,029 | 1 | MILL, SEAL, & OVERLAY FRONTAGE ROADS |
3136-01-166 | Travis/ Austin |
LP 1 | Actual | $1,054,970 | 1 | MILL, SEAL, AND OVERLAY |
3277-01-016 | Travis/ Austin |
FM 3177 | Actual | $640,530 | 10 | CONSTRUCT CENTER LEFT TURN LANE |
0200-07-049 | Tyler/ Beaumont |
US 69 | Actual | $2,393,603 | 1 | OVERLAY EXISTING ROADWAY |
0369-03-027 | Uvalde/ San Antonio |
RM 187 | Actual | $3,710,664 | 1 | REHAB EXISTING ROADWAY & ADD SHOULDERS |
0022-08-022 | Val Verde/ Laredo |
US 90 | Actual | $1,863,201 | 11 | REHABILITATION OF AN EXISTING ROADWAY |
0522-02-028 | Van Zandt/ Tyler |
SH 243 | Actual | $61,344 | 1 | CONCRETE SURFACE REPAIR OF BRIDGE STRUCTURES |
0088-06-003 | Victoria/ Yoakum |
BU 59-T | Actual | $2,844,587 | 1 | ASPHALTIC CONCRETE PAVEMENT |
0523-02-030 | Waller/ Houston |
FM 362 | Actual | $961,664 | 1 | ADD SHOULDERS AND ACP OVERLAY |
0523-02-041 | Waller/ Houston |
FM 362 | Actual | $654,828 | 1 | SEAL COAT AND 1.5" OVERLAY, PAVEMENT MARKINGS |
0527-02-015 | Waller/ Houston |
FM 1458 | Actual | $1,835,567 | 1 | SUBGRADE WIDENING, SEAL COAT, ACP O / L AND PAVEMENT MARKINGS |
0027-04-039 | Wharton/ Yoakum |
US 90A | Actual | $3,184,625 | 1 | SEAL COAT, ACP & SET |
2819-02-009 | Wharton/ Yoakum |
FM 2765 | Actual | $789,229 | 1 | PAVEMENT REPAIR AND ACP SURFACING |
0043-07-104 | Wilbarger/ Wichita Falls |
US 287 | Actual | $2,590,421 | 1 | SEAL COAT AND HMAC OVERLAY |
0204-01-060 | Williamson/ Austin |
US 79 | Actual | $1,345,918 | 1 | FULL DEPTH REPAIR & OVERLAY |
0013-06-037 | Wise/ Fort Worth |
US 81 | Actual | $2,686,375 | 6 | REPLACE BRIDGE |
0013-08-120 | Wise/ Fort Worth |
US 81 | Actual | $1,846,267 | 11 | MILL ASPHALT, CONCRETE REPAIR AND 3 INCH OVERLAY |
0352-01-054 | Wise/ Fort Worth |
SH 114 | Actual | $553,103 | 1 | MILL AND HMAC OVERLAY |
0190-03-076 | Wood/ Tyler |
SH 37 | Actual | $1,795,188 | 1 | PLANE & RESURFACE ROADWAY |
|
|