| 0613-02-058 | Atascosa/ San Antonio |
SH 16 | Actual | $13,488,214 | 8 | RESTORE EXISTING ROADWAY |
| 1073-01-020 | Bastrop/ Austin |
FM 696 | Actual | $2,191,679 | 1 | REPLACE BRIDGE AND APPROACHES |
| 2686-01-011 | Bastrop/ Austin |
FM 2571 | Actual | $1,212,626 | 6 | REPLACE BRIDGE AND APPROACHES |
| 1063-02-017 | Bee/ Corpus Christi |
FM 888 | Actual | $1,168,693 | 8 | WIDEN ROADWAY |
| 2412-02-015 | Bee/ Corpus Christi |
FM 351 | Actual | $1,141,152 | 1 | MILL AND OVERLAY |
| 0184-04-046 | Bell/ Waco |
SL 363 | Actual | $11,188,081 | 3 | CONSTRUCT AT - GRADE INTERSECTION AND ULTIMATE FRONTAGE ROADS |
| 0398-04-059 | Bell/ Waco |
SH 317 | Actual | $16,671,724 | 1 | RECONSTRUCT AND WIDEN FROM TWO TO FOUR LANES WITH RAISED |
| 0836-02-069 | Bell/ Waco |
SH 195 | Actual | $292,247 | 3 | LANDSCAPE ENHANCEMENT CONSISTING OF LANDSCAPING AND GATEWAY |
| 0024-08-131 | Bexar/ San Antonio |
US 90 | Actual | $355,044 | 10 | LANDSCAPE DEVELOPMENT |
| 0521-04-274 | Bexar/ San Antonio |
IH 410 | Actual | $81,882,606 | ROW | EXPAND FROM 6 TO 8 LANES FROM SH 151 TO INGRAM RD AND |
| 0915-12-496 | Bexar/ San Antonio |
VA | Actual | $8,078,661 | 3 | EXTEND 36TH ST ALONG EXISTING WAGNER / TINKER RD - EXPAND TO |
| 2452-01-057 | Bexar/ San Antonio |
SL 1604 | Actual | $44,000,000 | 1 | CONSTRUCT INTERCHANGE - SH 151 ML'S OVER LP 1604 |
| 0010-13-090 | Bowie/ Atlanta |
US 67 | Actual | $488,780 | 8 | IMPROVE TRAFFIC SIGNALS & INSTALL FLASHING YELLOW ARROW |
| 0912-31-282 | Brazoria/ Houston |
CR | Actual | $1,423,279 | 6 | REPLACE BRIDGE AND APPROACHES NBI# 12020AA0887002 |
| 0049-12-096 | Brazos/ Bryan |
SH 6 | Actual | $7,542,870 | 1 | UPGRADE FREEWAY FACILITY CONSISTING OF GRADING, STRUCTURES, |
| 1025-02-029 | Brown/ Brownwood |
FM 586 | Actual | $920,046 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
| 0286-02-031 | Caldwell/ Austin |
SH 80 | Actual | $832,763 | 8 | INSTALL CONTINUOUS TURN LANE AND CONSTRUCT PAVED SHOULDERS |
| 0914-22-057 | Caldwell/ Austin |
CS | Actual | $291,669 | 6 | REPLACE BRIDGE & APPROACHES |
| 0546-09-039 | Cass/ Atlanta |
FM 125 | Actual | $3,490,099 | 8 | HIGH FRICTION SURFACE TREATMENT - CURVE & PROVIDE ADDITIONAL |
| 0199-01-081 | Cherokee/ Tyler |
US 69 | Actual | $11,063,278 | 1 | ADD 2' EDGE TREATMENT, PLANE & RESURFACE ROADWAY |
| 0199-02-057 | Cherokee/ Tyler |
US 69 | Actual | $9,380,454 | 1 | ADD 2' EDGE TREATMENT, PLANE & RESURFACE ROADWAY - SBL |
| 0634-01-011 | Cherokee/ Tyler |
FM 22 | Actual | $7,730,087 | 8 | WIDEN ROADWAY FROM 20' TO 24' FOR SAFETY |
| 0043-01-078 | Childress/ Childress |
US 287 | Actual | $9,914,946 | 11 | REHABILITATION OF EXISTING ROAD |
| 0135-12-029 | Collin/ Dallas |
FM 3537 | Actual | $529,267 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND IRRIGATION SYSTEM |
| 0619-01-023 | Collin/ Dallas |
FM 6 | Actual | $3,493,547 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0195-01-099 | Cooke/ Wichita Falls |
IH 35 | Actual | $2,144,829 | 6 | PAINTING |
| 0724-01-044 | Coryell/ Waco |
FM 116 | Actual | $17,587,092 | 6 | ADD PASSING LANES AND 10' SHOULDERS |
| 0794-01-018 | Dallam/ Amarillo |
FM 1727 | Actual | $6,170,064 | 8 | WIDEN ROADWAY FOR SAFETY IMPROVEMENT |
| 0196-03-256 | Dallas/ Dallas |
IH 35E | Actual | $7,335,235 | 1 | MILL & INLAY MAINLANES AND SHOULDERS, PAVEMENT MARKINGS AND |
| 0918-47-086 | Dallas/ Dallas |
CS | Actual | $15,000,000 | 3 | PH 2 - COLORADO / BECKLEY TO ZANG / DAVIS; CONSTRUCT DALLAS CBD |
| 0918-47-087 | Dallas/ Dallas |
CS | Actual | $7,872,531 | 3 | PH 3 - UNION STATION / HOUSTON ST TO YOUNG / INWOOD @ CONVENTION |
| 0918-47-088 | Dallas/ Dallas |
VA | Actual | $8,000,000 | 3 | RAIL VEHICLE PURCHASE |
| 2374-03-077 | Dallas/ Dallas |
IH 20 | Actual | $7,377,286 | ROW | CONSTRUCT FRONTAGE ROADS AND RAMPS CONNECTING IH 20 |
| 0550-01-026 | Eastland/ Brownwood |
FM 8 | Actual | $1,189,721 | 6 | WIDEN BRIDGE, REHABILITATE DECK AND APPROACHES |
| 2638-01-020 | Eastland/ Brownwood |
SH 206 | Actual | $812,115 | 1 | BASE OVERLAY AND SEAL COAT |
| 0924-06-465 | El Paso/ El Paso |
VA | Actual | $540,000 | 5 | BUS PURCHASE |
| 0172-05-116 | Ellis/ Houston |
BU 287Q | Actual | $1,097,038 | 8 | UPGRADE RAILROAD WARNING DEVICES |
| 0596-02-039 | Ellis/ Dallas |
FM 66 | Actual | $3,421,432 | 6 | REPLACE BRIDGES AND APPROACHES |
| 1159-01-022 | Ellis/ Dallas |
FM 875 | Actual | $3,724,841 | 6 | REPLACE BRIDGE AND APPROACHES |
| 1159-02-032 | Ellis/ Dallas |
FM 879 | Actual | $9,549,753 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
| 0912-34-176 | Fort Bend/ Houston |
CR | Actual | $2,828,589 | 6 | REPLACE BRIDGE AND APPROACHES NBI# 12080AA0970002 |
| 0051-03-106 | Galveston/ Houston |
SH 3 | Actual | $609,218 | 8 | IMPROVE TRAFFIC SIGNALS AT INTERSECTION |
| 0112-02-031 | Gillespie/ Austin |
US 290 | Actual | $1,236,399 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0025-07-063 | Gonzales/ Yoakum |
SH 97 | Actual | $1,366 | 3 | INSTALL MEMORIAL MARKER SIGNS |
| 0729-02-026 | Grayson/ Paris |
FM 121 | Actual | $1,590,416 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0640-07-005 | Gregg/ Tyler |
FM 449 | Actual | $4,436,875 | 8 | WIDEN PAVEMENT TO 20' - 24' AND |
| 0315-02-047 | Grimes/ Bryan |
SH 90 | Actual | $7,051,873 | 1 | REHABILITATE EXISTING ROAD CONSISTING OF SUBGRADE WIDENING, |
| 0114-12-007 | Harris/ Houston |
US 290 | Actual | $60,092,664 | 2M | WIDEN TO 6 MAIN LANES WITH DISCONTINUOUS TWO 2 - LANE FRONTAGE |
| 0508-01-338 | Harris/ Houston |
IH 10 | Actual | $4,306,347 | 1 | REPLACE FOUR ACP RAMPS AND FRTG RDS WITH FAST TRACK |
| 0108-03-039 | Henderson/ Yoakum |
BS 19J | Actual | $4,278,951 | 8 | INSTALL RRX SIGNALS & GATES |
| 0559-02-034 | Henderson/ Tyler |
FM 315 | Actual | $3,079,334 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
| 0911-28-031 | Houston/ Lufkin |
CR | Actual | $748,568 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0937-03-013 | Houston/ Lufkin |
FM 227 | Actual | $2,633,662 | 6 | REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES |
| 0005-10-020 | Howard/ Abilene |
BI 20-G | Actual | $348,456 | 8 | INSTALL RAILROAD WARNING SIGNALS AND |
| 0009-13-161 | Hunt/ Paris |
IH 30 | Actual | $370,172 | 6 | UPGRADE BRIDGE AND APPROACH RAILING AND ADD SAFETY END |
| 0064-07-042 | Jasper/ Beaumont |
US 96 | Actual | $4,127,377 | 1 | MILL AND INLAY ROADWAY |
| 0213-08-077 | Jasper/ Beaumont |
US 190 | Actual | $7,078,117 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0244-02-098 | Jasper/ Beaumont |
SH 63 | Actual | $6,777,550 | 1 | MILL AND INLAY |
| 0014-22-031 | Johnson/ Fort Worth |
IH 35W | Actual | $1,323,249 | 1 | REPLACE BRIDGE & APPROACH RAILING OR ADD SAFETY END |
| 0173-04-047 | Kaufman/ Dallas |
SH 34 | Actual | $989,767 | 1 | REHABILITATION OF EXISTING FOUR LANE DIVIDED ROADWAY |
| 0925-17-013 | Knox/ Childress |
CR | Actual | $466,669 | 6 | REPLACEMENT OF EXISTING BRIDGE FACILITY |
| 0018-02-068 | La Salle/ Laredo |
IH 35 | Actual | $2,369,197 | 1 | OVERLAY |
| 0335-03-048 | Leon/ Bryan |
SH 7 | Actual | $2,827,002 | 1 | REHABILITATE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES |
| 1096-02-050 | Liberty/ Beaumont |
FM 770 | Actual | $1,023,264 | 8 | SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAVED SURFACE |
| 0073-07-060 | Live Oak/ Corpus Christi |
IH 37 | Actual | $6,295,219 | 1 | SPOT BASE REPAIR AND OVERLAY |
| 0380-01-083 | Lubbock/ Lubbock |
US 62 | Actual | $14,583,865 | 11 | NEW INTERCHANGE |
| 0905-00-079 | Lubbock/ Lubbock |
VA | Actual | $2,988,537 | 10 | CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN LUBBOCK |
| 0905-00-083 | Lubbock/ Lubbock |
VA | Actual | $2,141,840 | 11 | MISCELLANEOUS CONSTRUCTION |
| 0005-04-070 | Martin/ Odessa |
IH 20 | Actual | $12,816,544 | 1 | REHABILITATION OF EXISTING ROAD |
| 3067-01-011 | Martin/ Odessa |
FM 3263 | Actual | $5,923,778 | 1 | REHABILITATION OF EXISTING ROAD |
| 0071-03-039 | Mason/ Austin |
US 87 | Actual | $919,216 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0706-01-013 | Nacogdoches/ Lufkin |
FM 95 | Actual | $1,382,155 | 8 | RECONSTRUCT AND WIDEN PAVEMENT TO 24 FT |
| 0916-35-175 | Nueces/ Corpus Christi |
CS | Actual | $1,194,858 | 3 | CONSTRUCT HIKE AND BIKE TRAIL |
| 0226-02-033 | Oldham/ Amarillo |
US 385 | Actual | $2,049,390 | 1 | OVERLAY AND MINOR REPAIRS |
| 1993-01-015 | Palo Pinto/ Fort Worth |
FM 2201 | Actual | $4,655,964 | 1 | WIDEN TO 11' LANES AND 3' SHOULDERS |
| 2290-01-009 | Palo Pinto/ Fort Worth |
FM 2353 | Actual | $5,278,946 | 1 | WIDEN PAVEMENT TO 2 - 11' LANES AND ADD 4'SHOULDERS |
| 0539-05-015 | Parker/ Fort Worth |
FM 1885 | Actual | $5,556,310 | 1 | WIDEN TO 11' LANES AND 3' SHOULDERS |
| 2930-02-011 | Parker/ Fort Worth |
FM 3028 | Actual | $1,561,560 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0911-04-066 | Polk/ Lufkin |
CR | Actual | $1,735,777 | 3 | CONSTRUCT FUTURE FM ROADWAY TO THE GEORGIA PACIFIC FACILITY |
| 1245-02-043 | Potter/ Amarillo |
RM 1061 | Actual | $10,138,325 | 1 | WIDEN ROADWAY FOR SAFETY IMPROVEMENT |
| 0046-01-061 | Red River/ Paris |
US 82 | Actual | $2,651,371 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0350-01-017 | Refugio/ Corpus Christi |
SH 239 | Actual | $6,111,591 | 8 | WIDEN ROADWAY |
| 0447-05-061 | Refugio/ Corpus Christi |
FM 774 | Actual | $4,223,924 | 1 | REPLACE BRIDGE AND APPROACHES |
| 1015-01-025 | Rockwall/ Dallas |
FM 549 | Actual | $7,749,473 | 8 | PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAY |
| 0907-13-011 | Runnels/ San Angelo |
CR | Actual | $596,308 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0138-04-045 | Rusk/ Tyler |
US 259 | Actual | $5,667,819 | 1 | REPAIR & RESURFACE ROADWAY - SBL |
| 0206-07-058 | Rusk/ Tyler |
US 79 | Actual | $6,661,254 | 8 | CONSTRUCT CONTINUOUS CENTER TURN LANE |
| 1669-03-008 | Rusk/ Tyler |
FM 1798 | Actual | $1,826,819 | 1 | REPAIR BASE AND REPAVE ROADWAY |
| 1526-02-009 | Scurry/ Abilene |
FM 1606 | Actual | $6,584,662 | 1 | REHABILITATION AND WIDENING OF EXISTING ROADWAY |
| 0203-08-015 | Smith/ Tyler |
FM 1253 | Actual | $7,499,499 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
| 0259-02-049 | Somervell/ Fort Worth |
US 67 | Actual | $366,063 | 1 | REPLACE BRIDGE & APPROACH RAILING OR ADD SAFETY END |
| 0902-48-058 | Tarrant/ Fort Worth |
VA | Actual | $1,966,433 | 10 | CONSTRUCT CURB RAMPS_FM1709, SH114, IH30, FM157 |
| 0902-48-791 | Tarrant/ Fort Worth |
VA | Actual | $1,438,688 | 3 | CONSTRUCT 3 PEDESTRIAN AND BICYCLE CONNECTIONS TO TRINITY |
| 0902-48-829 | Tarrant/ Fort Worth |
VA | Actual | $640,338 | 3 | FORT WORTH URBAN VILLAGES AND COMMERCIAL CORRIDORS |
| 2266-02-136 | Tarrant/ Fort Worth |
SH 360 | Actual | 300,000,000 | 11 | CONSTRUCT 4 TOLL LNS FR SUBLETT / CAMP WIS. TO BROAD ST; 2 TO |
| 0407-06-040 | Taylor/ Abilene |
US 277 | Actual | $6,510,588 | 1 | MILLING, SPOT BASE REPAIR, ASPHALT CONCRETE PAVEMENT OVERLAY |
| 0077-09-009 | Tom Green/ San Angelo |
BU 67H | Actual | $560,540 | 6 | UPGRADE BRIDGE AND APPROACH RAILING |
| 0015-11-061 | Travis/ Austin |
SL 275 | Actual | $620,866 | 8 | IMPROVE TRAFFIC SIGNAL |
| 0877-04-025 | Tyler/ Beaumont |
FM 256 | Actual | $727,007 | 8 | SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAVED SURFACE |
| 1018-02-017 | Upshur/ Atlanta |
FM 555 | Actual | $1,904,823 | 8 | HIGH FRICTION SURFACE TREATMENT - CURVE & PROVIDE ADDITIONAL |
| 0036-08-051 | Uvalde/ San Antonio |
US 83 | Actual | $2,165,894 | 8 | CONSTRUCT LEFT TURN LN, INSTALL INT FLASHING BEACON, SAFETY |
| 0910-12-128 | Van Zandt/ Tyler |
PW | Actual | $90,549 | 10 | ADD BASE & CLEAN DITCHES ON UNPAVED ROAD |
| 0212-02-035 | Walker/ Bryan |
SH 30 | Actual | $16,587,457 | 1 | REHABILITATION OF EXISTING ROAD CONSISTING OF GRADING, |
| 0913-09-058 | Wharton/ Yoakum |
CR | Actual | $524,661 | 6 | REPLACE BRIDGE AND APPROACHES |
| 1302-01-022 | Wharton/ Yoakum |
FM 1160 | Actual | $636,444 | 8 | SAFETY TREAT FIXED OBJECTS |
| 0903-03-081 | Wichita/ Wichita Falls |
CR | Actual | $1,519,579 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0147-02-008 | Wilbarger/ Wichita Falls |
US 70 | Actual | $769,343 | 6 | BRIDGE MAINTENANCE |
| 1200-04-011 | Williamson/ Austin |
FM 1466 | Actual | $597,945 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0354-01-044 | Winkler/ Odessa |
SH 115 | Actual | $5,012,911 | 1 | REHABILITATION OF EXISTING ROAD |
| 0902-20-098 | Wise/ Fort Worth |
CR | Actual | $489,841 | 6 | REPLACE BRIDGE AND APPROACHES |
| 2958-01-013 | Wood/ Tyler |
FM 2869 | Actual | $4,585,715 | 8 | WIDEN ROAWAY FROM 20' TO 24' FOR SAFETY |
| 0276-05-026 | Zavala/ Laredo |
US 57 | Actual | $6,314,121 | 8 | RESURFACE OF EXISTING HIGHWAY |
|