Letting Schedule for March, 2017 County (FY 2017)
| March, 2017 (FY 2017) | (see Links) |
| SEP 2016 | OCT 2016 | NOV 2016 | DEC 2016 | JAN 2017 | FEB 2017 | MAR 2017 | APR 2017 | MAY 2017 | JUN 2017 | JUL 2017 | AUG 2017 | | ||||||
| CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description |
|---|---|---|---|---|---|---|
| 0910-08-067 | Anderson/ Tyler | CR | Actual | $804,558 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0176-02-120 | Angelina/ Lufkin | US 59 | Actual | $3,119,655 | 1 | RESURFACE EXISTING PAVEMENT |
| 0265-05-079 | Bastrop/ Austin | SH 71 | Actual | $6,156,165 | 1 | LEVEL-UP & THIN OVERLAY MIXTURE |
| 2686-01-012 | Bastrop/ Austin | FM 2571 | Actual | $1,636,942 | 1 | FULL DEPTH, LEVEL-UP & SEAL COAT |
| 3292-01-014 | Bell/ Waco | FM 93 | Actual | $89,403 | 1 | FLASHING BEACONS AND SAFETY LIGHTING |
| 0231-16-032 | Bell/ Waco | FM 436 | Actual | $159,896 | 1 | CENTERLINE TEXTURING |
| 1477-01-040 | Bexar/ San Antonio | FM 1516 | Actual | $13,999,147 | 1 | EXPAND FROM 2 TO 4 LANES WITH CONTINUOUS LT LANE, SDWLKS & |
| 0586-01-065 | Brazoria/ Houston | SH 332 | Actual | $241,465 | 1 | REMOVE AND REPLACE DRAINAGE STRUCTURE |
| 0923-06-075 | Brown/ Brownwood | CS | Actual | $469,553 | 3 | CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF SIDEW |
| 0273-02-026 | Burnet/ Austin | US 183 | Actual | $2,566,228 | 1 | LEVEL-UP & FULL DEPTH REPAIR |
| 0273-02-024 | Burnet/ Austin | US 183 | Actual | $1,435,135 | 8 | CONVERT 4-LANE UNDIVIDED TO SUPER 2 WITH SHOULDERS AND |
| 1378-04-050 | Burnet/ Austin | RM 1431 | Actual | $851,590 | 8 | CONVERT 4-LANE UNDIVIDED TO SUPER 2 WITH SHOULDERS |
| 0535-03-023 | Caldwell/ Austin | IH 10 | Actual | $1,514,386 | 1 | ACP OVERLAY |
| 0437-02-016 | Callahan/ Abilene | US 283 | Actual | $2,834,100 | 1 | CEMENT TREAT BASE, 1-COURSE SURFACE TREATMENT & 3 SP D |
| 0091-03-025 | Collin/ Dallas | SH 289 | Actual | $1,793,153 | 10 | LANDSCAPE TREATMENT OF MEDIANS |
| 0047-06-159 | Collin/ Dallas | US 75 | Actual | $775,877 | 1 | FULL DEPTH CONCRETE REPAIR |
| 0047-06-160 | Collin/ Dallas | US 75 | Actual | $730,296 | 1 | CLEAN AND PAINT CONCRETE BARRIER AND WALLS |
| 0016-05-115 | Comal/ San Antonio | IH 35 | Actual | $7,811,803 | 1 | REPLACE EXISTING BRIDGE, CONSTRUCT NEW TURNARAOUNDS AND |
| 3192-02-009 | Cooke/ Wichita Falls | FM 1199 | Actual | $917,936 | 1 | FULL DEPTH REPAIR AND OVERLAY |
| 0724-01-050 | Coryell/ Waco | FM 116 | Actual | $4,426,657 | 1 | ADD LEFT TURN LANE |
| 0918-45-714 | Dallas/ Dallas | VA | Actual | $2,072,339 | 3 | CONSTRUCT NEW 12' WIDE HIKE/BIKE AND PEDESTRIAN TRAIL IN THE |
| 0918-47-143 | Dallas/ Dallas | CS | Actual | $2,437,939 | 3 | MILITARY PARKWAY TRAIL - SHARED-USE PATH ALONG MILITARY PKWY |
| 0918-47-141 | Dallas/ Dallas | VA | Actual | $575,773 | 3 | SAFE ROUTES TO SCHOOL - SIDEWALK IMPROVEMENTS AT VARIOUS |
| 0143-09-069 | Dewitt/ Yoakum | US 87 | Actual | $2,022,176 | 1 | ACP OVERLAY |
| 0007-06-084 | Eastland/ Brownwood | IH 20 | Actual | $80,051,162 | 4 | REALIGN EXISTING ROADWAY INCLUDING GRADING, PAVEMENT |
| 0906-00-156 | Ector/ Odessa | VA | Actual | $1,159,063 | 1 | PAVEMENT MARKINGS |
| 0906-00-173 | Ector/ Odessa | VA | Actual | $660,449 | 1 | PAVEMENT MARKINGS |
| 0924-06-506 | El Paso/ El Paso | VA | Actual | $1,100,000 | 5 | PURCHASE OF 2 BUSES |
| 0079-05-054 | Erath/ Ft Worth | US 67 | Actual | $4,915,384 | 1 | WEDGE MILL, SEAL COAT, & HMAC OVERLAY MAIN LANES & SHOULDERS |
| 1482-02-019 | Fannin/ Paris | FM 1550 | Actual | $3,485,068 | 1 | REHABILITATION OF EXISTING ROAD |
| 0543-03-072 | Fort Bend/ Houston | FM 762 | Actual | $2,513,313 | 1 | BASE REPAIR AND 1.5" ACP OVERLAY |
| 0389-06-105 | Galveston/ Houston | SH 146 | Actual | $344,051 | 1 | CONSTRUCT 1.5" ACP RAMP |
| 0072-01-054 | Gillespie/ Austin | US 87 | Actual | $390,631 | 1 | CONVERT 4-LANE UNDIVIDED TO SUPER 2 WITH SHOULDER |
| 0535-04-030 | Gonzales/ Yoakum | IH 10 | Actual | $16,121,983 | 1 | ACP OVERLAY |
| 0200-12-015 | Hardin/ Beaumont | FM 418 | Actual | $270,266 | 8 | MILLED CENTERLINE RUMBLE STRIPS |
| 0912-72-364 | Harris/ Houston | CS | Actual | $576,000 | 3 | CONSTRUCT 10 FOOT WIDE HIKE AND BIKE TRAIL |
| 0138-13-018 | Harrison/ Atlanta | FM 2208 | Actual | $46,567 | 10 | PAVEMENT/CULVERT REPAIR |
| 0632-03-046 | Harrison/ Atlanta | FM 134 | Actual | $31,666 | 10 | PAVEMENT/CULVERT REPAIR |
| 0096-09-076 | Harrison/ Atlanta | US 80 | Actual | $1,656,153 | 1 | RESURFACE EXISTING 4-LANE HIGHWAY |
| 1921-02-014 | Harrison/ Atlanta | FM 1999 | Actual | $9,873 | 10 | PAVEMENT/CULVERT REPAIR |
| 0030-06-059 | Hemphill/ Amarillo | US 83 | Actual | $434,684 | 8 | INSTALL FLASHING BEACON, INSTALL ADV WARN SIGNALS AND SIGNS |
| 0921-02-318 | Hidalgo/ Pharr | VA | Actual | $1,321,973 | 10 | CONSTRUCT CURB RAMPS AT VARIOUS LOCATION ALONG US 281 |
| 0005-05-110 | Howard/ Abilene | IH 20 | Actual | $6,407,011 | 1 | SPOT BASE REPAIR, 1-COURSE SURFACE TREATMENT, 2 SMA-D |
| 0254-07-009 | Jim Wells/ Corpus Christi | US 281 | Actual | $7,243,859 | 1 | SPOT BASE REPAIR AND OVERLAY |
| 0916-29-006 | Live Oak/ Corpus Christi | CR | Actual | $768,117 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0299-04-068 | Maverick/ Laredo | US 277 | Actual | $7,945,799 | 1 | RESURFACE OF EXISTING HIGHWAY |
| 0071-02-032 | Mcculloch/ Brownwood | US 87 | Actual | $453,866 | 8 | PROFILE EDGELINE AND CENTERLINE MARKINGS |
| 0909-22-173 | Mclennan/ Waco | CS | Actual | $382,491 | 3 | INCREASE SUPERELEVATION |
| 0049-01-092 | Mclennan/ Waco | SH 6 | Actual | $5,458,397 | 1 | MILL AND PFC OVERLAY |
| 1810-01-032 | Nacogdoches/ Lufkin | FM 1878 | Actual | $2,046,199 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0006-03-132 | Nolan/ Abilene | IH 20 | Actual | $16,843,808 | 1 | ROADWAY REHABILITATION / ARMORINGA |
| 0006-14-004 | Nolan/ Abilene | BI 20-L | Actual | $1,789,423 | 8 | HIGH FRICTION SURFACE TREATMENT OF CURVE AND INSTALL |
| 1052-01-076 | Nueces/ Corpus Christi | FM 666 | Actual | $9,334,917 | 1 | WIDEN AND SEAL ROADWAY |
| 0916-00-084 | Nueces/ Corpus Christi | VA | Actual | $1,800,175 | 1 | DISTRICT WIDE SMALL SIGN REPLACEMENT |
| 0246-02-049 | Panola/ Atlanta | BU 79-G | Actual | $951,227 | 1 | RESURFACE EXISTING 2-LANE HIGHWAY |
| 0139-08-037 | Pecos/ Odessa | US 285 | Actual | $1,168,400 | 11 | ROADWAY WIDENING |
| 2451-03-015 | Reeves/ Odessa | RM 652 | Actual | $5,198,483 | 6 | BRIDGE REPLACEMENT |
| 0207-01-021 | Rusk/ Tyler | SH 43 | Actual | $5,717,298 | 1 | REPAIR AND RESURFACE ROADWAY |
| 0118-10-060 | San Augustine/ Lufkin | SH 21 | Actual | $2,703,286 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0180-09-018 | San Patricio/ Corpus Christi | SL 90 | Actual | $168,264 | 10 | LANDSCAPE WORK |
| 0372-01-098 | San Patricio/ Corpus Christi | US 77 | Actual | $3,254,908 | 1 | BASE REPAIR, MILL, SEAL AND OVERLAY (NB & SB LANES) ON US 77 |
| 0910-16-121 | Smith/ Tyler | PW | Actual | $1,451,298 | 10 | OVERLAY PARK ROADS, PARKING LOTS & CAMPSITE PULLOUTS |
| 0910-16-130 | Smith/ Tyler | VA | Actual | $2,192,859 | 1 | CONSTRUCT RIGHT TURN LANES AT VARIOUS INTERSECTIONS |
| 0245-05-047 | Smith/ Tyler | SH 64 | Actual | $1,972,204 | 1 | PLANE & RESURFACE ROADWAY |
| 0718-02-068 | Tarrant/ Ft Worth | FM 156 | Actual | $184,085 | 1 | INSTALL TRAFFIC SIGNAL AND ADD LEFT TURN LANE |
| 0094-02-123 | Tarrant/ Ft Worth | SH 10 | Actual | $4,159,763 | 1 | MILL, BASE REPAIR, HMAC OVERLAY |
| 1330-01-062 | Tarrant/ Ft Worth | FM 1187 | Actual | $6,421,891 | 1 | MILL, HMAC OVERLAY & PAVEMENT MARKINGS |
| 0914-00-395 | Travis/ Austin | VA | Actual | $1,721,305 | 1 | FY 17 NON-SITE SPECIFIC SIGNALS |
| 3417-01-024 | Travis/ Austin | FM 734 | Actual | $1,509,104 | 1 | PAVEMENT REPAIR,UNDERSEAL & OVERLAY |
| 0015-11-063 | Travis/ Austin | SL 275 | Actual | $172,402 | 6 | UPGRADE BRIDGE AND APPROACH RAILING |
| 0319-01-064 | Trinity/ Lufkin | US 287 | Actual | $2,234,877 | 1 | RECONSTRUCT EXISTING PAVEMENT |
| 1237-01-032 | Tyler/ Beaumont | FM 1013 | Actual | $512,006 | 8 | INCREASE SUPERELEVATION |
| 0275-12-072 | Wheeler/ Childress | IH 40 | Actual | $4,739,549 | 6 | BRIDGE REPLACEMENT |
| 0043-14-024 | Wichita/ Wichita Falls | SL 11 | Actual | $320,612 | 6 | UPGRADE BRIDGE AND APPROACH RAILING |
| 1076-02-040 | Young/ Wichita Falls | FM 209 | Actual | $2,500,359 | 1 | EXTEND CULVERTS |
|