Monthly State Let Construction Report For Atlanta District As Of Apr 7, 2016 Page 3 Of 4

Last Update: Thursday, April 7, 2016
FTP Icon
page 1 | page 2 | page 3 | page 4

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyUPSHUR
Highway SH 155
From AT SABINE RIVER & SABINE RIVER RELI
To SOUTH OF BIG SANDY
CSJ 0520-02-037
Proj ID BR 2013(823)
Work Type REPLACE BRIDGES AND APPROACHES
 
0.692 12644943.11 61372.87 8637332.47 68.3
CountyUPSHUR
Highway SH 155
From AT UNION PACIFIC RAILROAD OVERPASS
To S. OF BIG SANDY
CSJ 0520-02-038
Proj ID BR 2013(823)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.117 2277242.66 178106.13 1019621.67 44.7
CountyUPSHUR
Highway SH 155
From SABINE RIVER RELIEF BRIDGE
To U.P.R.R. OVERPASS
CSJ 0520-02-039
Proj ID C 520-2-39
Work Type GR, STR, BASE, SURF
 
1.274 3947700.40 78269.94 2318039.99 58.7
Work Order 09-09-13
Work Began 09-30-13
Work Completed  
Time Computed 09-30-13
Contract Working Days 780
Addl Days Granted 0
Working Days Charged 440
Percent Time Used 56
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0520-02-037
MAC TRANSPORTATION, LTD, L.L.P.(6.50%)
STRIPING TECHNOLOGY, L.P.(1.11%)
AMERICAN REMEDIATION OPTIONS, INC. (0.56%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.31%)
ODUM SERVICES, L.P.(1.00%)
PANOLA SIGN & BARRICADE, INC.(0.16%)
HIGHWAY 19 CONSTRUCTION, LLC (0.62%)
ATS DRILLING, INC. (7.12%)
MCL CONTRACTING, LLC (0.20%)
TEX OP CONSTRUCTION, LP(0.02%)
Contract # 07133204
Totals 18869886.17 317748.94 11974994.13 63.4

CountyUPSHUR
Highway SH 155
From 0.9 MILE SOUTH OF FM 1002
To US 80
CSJ 0520-02-054
Proj ID STP 2014(838)
Work Type ACP SURF & PAV MKS
 
1.510 788081.15 0.00 719520.98 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 07-10-14
Work Began 09-08-14
Work Completed 07-27-15
Time Computed 09-08-14
Contract Working Days 29
Addl Days Granted 0
Working Days Charged 28
Percent Time Used 96
Contractor(s)
REYNOLDS & KAY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0520-02-054
BANNER SIGN & BARRICADE, INC. (HOOKS)(0.19%)
DUSTROL, INC.(0.62%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.63%)
STRIPING TECHNOLOGY, L.P.(3.67%)
LONGVIEW BRIDGE AND ROAD, LTD. ( 12.51%)
Contract # 06143041
Totals 788081.15 0.00 719520.98 100.0

CountyCASS
Highway FM 1399
From FM 250
To SH 8
CSJ 0546-08-011
Proj ID STP 2016(338)HES
Work Type SAFETY TREAT FIXED OBJECTS
 
15.694 1162910.40 18911.00 337710.50 29.0
Work Order 12-21-15
Work Began 01-20-16
Work Completed  
Time Computed 01-20-16
Contract Working Days 150
Addl Days Granted 0
Working Days Charged 31
Percent Time Used 20
Contractor(s)
CDM HOLDINGS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0546-08-011
N-LINE TRAFFIC MAINTENANCE, L.P. (1.16%)
SOUTHWEST ENVIRONMENT SERVICES LLC (4.54%)
DUSTIN ALLEN, INC. (4.76%)
Contract # 11153013
Totals 1162910.40 18911.00 337710.50 29.0

CountyCASS
Highway FM 1399
From FM 250
To SH 8
CSJ 0546-08-012
Proj ID STP 2016(138)HESG
Work Type FLASH CHEV, TEXT SHLDR & CL TEXTURE
 
24.202 896724.18 0.00 235769.51 26.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-24-15
Work Began 03-07-16
Work Completed  
Time Computed 00-00-00
Contract Working Days 145
Addl Days Granted 0
Working Days Charged 31
Percent Time Used 21
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0546-08-012
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10153007
Totals 896724.18 0.00 235769.51 26.2

CountyCASS
Highway FM 125
From SH 43
To LOUISIANA STATE LINE
CSJ 0546-09-039
Proj ID STP 1502(226)HES
Work Type GR, STR, BS, SURF, HFST & PAV MRKS
 
37.671 3490097.96 0.00 107480.00 3.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-13-15
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 260
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
H. V. CAVER, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0546-09-039
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06153214
Totals 3490097.96 0.00 107480.00 3.0

CountyTITUS
Highway IH 30
From FRANKLIN COUNTY LINE
To MORRIS COUNTY LINE
CSJ 0610-03-079
Proj ID NH 2015(407)
Work Type PAV REP, ACP SURFACING AND PAV MARK
 
97.964 33725327.54 1755068.26 18957290.72 56.2
Work Order 02-10-15
Work Began 04-15-15
Work Completed  
Time Computed 04-11-15
Contract Working Days 595
Addl Days Granted 0
Working Days Charged 191
Percent Time Used 32
Contractor(s)
RK HALL, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0610-03-079
DUSTROL, INC.(3.91%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.33%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.32%)
DUSTIN ALLEN, INC. (3.58%)
STRIPE-A-ZONE, INC.(7.29%)
JM YANEZ CONSTRUCTION(1.60%)
SCR CONSTRUCTION CO., INC. (1.48%)
EAST TEXAS BRIDGE, INC.(9.22%)
STRAIGHT LINE SAWING & SEALING (0.36%)
SAMMY GIST ENTERPRISES, INC. (0.20%)
BRYDL CONTRACTING, INC.(0.03%)
Contract # 12143202
Totals 33725327.54 1755068.26 18957290.72 56.2

CountyBOWIE
Highway IH 30
From SH 98
To SP 86
CSJ 0610-06-078
Proj ID IM 0303(126)
Work Type PAV REP, PLANING, ACP & PAV MRKS
 
17.707 8894155.74 3375.00 8440701.24 95.3
Work Order 05-06-14
Work Began 07-08-14
Work Completed  
Time Computed 07-07-14
Contract Working Days 113
Addl Days Granted 3
Working Days Charged 152
Percent Time Used 131
Contractor(s)
RK HALL, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0610-06-078
SOUTHWEST ENVIRONMENT SERVICES LLC (0.02%)
COWBELL TRAFFIC SERVICES, INC. (0.13%)
DUSTROL, INC.(8.10%)
SCR CONSTRUCTION CO., INC. (8.95%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.23%)
DUSTIN ALLEN, INC. (2.50%)
STRIPING TECHNOLOGY, L.P.(1.27%)
Contract # 04143025
Totals 8894155.74 3375.00 8440701.24 95.3

CountyBOWIE
Highway IH 30
From AT SH 98 (EB) UNDERPASS
To .
CSJ 0610-06-087
Proj ID BR 2016(573)
Work Type BRIDGE REPAIR
 
0.043 88000.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-01-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 20
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
CDM HOLDINGS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0610-06-087
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 01163011
Totals 88000.00 0.00 0.00 0.0

CountyBOWIE
Highway IH 30 ETC
From AT US 59/71 (STATELINE) INTERCHANGE
To .
CSJ 0610-07-085
Proj ID IMD 0303(120)
Work Type REPLACE BRIDGE AND APPROACHES
 
9.080 153539064.68 0.00 160544965.06 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-03-06
Work Began 10-17-06
Work Completed 07-14-15
Time Computed 10-19-06
Contract Working Days 717
Addl Days Granted 98
Working Days Charged 815
Percent Time Used 100
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0610-07-085
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.41%)
RENAISSANCE CONTRACTORS PARTNERSHIP(3.44%)
ADVANCE CONSTRUCTION SERVICES, INC.(8.84%)
JACKSON LOGGING(0.03%)
W. W. FOUNDATION DRILLING, LTD.(3.32%)
CAPROCK SPECIALITY CONTRACTORS (0.20%)
DUSTROL, INC. (ROANOKE)(0.01%)
ODUM SERVICES, L.P.(0.63%)
GIBSON & ASSOCIATES, INC.(0.24%)
STRIPING TECHNOLOGY, L.P.(0.90%)
J & V COMMUNICATION SERVICES, INC. (5.32%)
CRAIG OLDEN, INC.(0.15%)
RG PAINTING(0.13%)
RK HALL, LLC ( 19.56%)
INDUS CONSTRUCTION, L.P. (0.74%)
QUALITY TRUCKING, LLC(0.00%)
RICK HARGROVE TRUCKING (0.16%)
CARTHAGE DRILLING, INC.(0.54%)
LIL DAN TRUCKING (0.16%)
INDUS CONSTRUCTION, L.P. (0.19%)
GREG'S TRUCKING(0.14%)
SHABUCK CONSTRUCTION (0.03%)
3-BAR-S CONSTRUCTION (0.05%)
HBL CONTRACTING, INC.(0.05%)
CODE J TRANSPORT, INC. (0.03%)
ROLL & ROCK(0.05%)
E. WALKER CONSTRUCTION CO., INC. (0.13%)
RK HALL, LLC (0.15%)
JODEEO TRUCKING(0.00%)
ADAMS EXCAVATION (0.00%)
RICK HARGROVE TRUCKING (0.05%)
TEC, INC.(0.04%)
WRIGHT BROTHERS EXCAVATING CO. (0.03%)
MIKE LEMLEY CONSTRUCTION (0.01%)
DAVID J. PICKETT (0.00%)
THOMAS HALL TRUCKING (0.01%)
THOMPSON HAULING (0.00%)
BELLEW TRUCKING(0.00%)
EXTREME TRUCKING LLC (0.06%)
RTI RELIABLE TRANSPORT, INC. (0.00%)
JODEEO TRUCKING(0.02%)
CODE J TRANSPORT, INC. (0.02%)
M-C TRUCKING LTD (0.02%)
M-C TRUCKING LTD (0.00%)
WEBBER BARRIER SERVICES, INC.(0.70%)
FRANK PEBBLES, INC.(0.00%)
H.O.W.B. TRANSPORTATION AND MATERIALS, LLC (0.00%)
XTREME TWIN CITY TRUCKING, INC.(0.00%)
H.O.W.B. TRANSPORTATION AND MATERIALS, LLC (0.08%)
RTI RELIABLE TRANSPORT, INC. (0.01%)
DUWAYNE PARKER (0.01%)
SCOTT DERR PAINTING CO (0.06%)
RIVER CITIES SAWING LLC(0.24%)
SEABERS SERVICES, L.L.C. (0.01%)
ENGINEERED EXPLOSIVE SERVICES(0.04%)
ATFH, INC. (0.01%)
KEVIN FATHERREE(0.01%)
KEVIN FATHERREE(0.01%)
DAVID DANIEL (0.01%)
JP TRUCKING(0.00%)
J W TRUCKING (0.01%)
J W TRUCKING (0.00%)
ROCKY'S TRUCKING (0.01%)
ROGER TIDWELL(0.01%)
WEAVER TRUCKING(0.01%)
MIKE MCREYNOLDS(0.01%)
M & J TRUCKING (0.01%)
LAFAYETTE TRUCKING (0.01%)
TYKES TRUCKING (0.01%)
TJT CONSTRUCTION (0.01%)
JM-A TRANSPORT (0.01%)
R & D TRUCKING (0.01%)
AMOS TRUCKING(0.01%)
ANDRE JONES(0.00%)
WILLIAMS EXCAVATING, LLC (0.03%)
ARNOLD TRUCKING, INC. (HUB)(0.02%)
RED RIVER HYDRO-SEEDING, INC.(0.43%)
A R DANIEL CONSTRUCTION SERVICES, INC. (0.12%)
BORING & TUNNELING COMPANY OF AMERICA, INC.(0.01%)
FIRST SERVE CONSTRUCTION, LLC(0.13%)
AMOS TRUCKING(0.01%)
ROCKY'S TRUCKING (0.01%)
RICK HARGROVE TRUCKING (0.00%)
3-BAR-S CONSTRUCTION (0.00%)
JP TRUCKING(0.00%)
RORIE STONE CONSTRUCTION, LLC(0.03%)
TX DOWN UNDER CONSTRUCTION LLC (0.00%)
H & N LANDSCAPING(0.00%)
TEX OP CONSTRUCTION, LP(0.01%)
CONCRETE CUTTING BY BOND (0.00%)
NIXON ENGINEERING, L.L.C.(0.07%)
TEXARKANA FENCE AND ACCESS CONTROL (0.05%)
W.O.E. CONSTRUCTION(0.08%)
GREEN ONSITE SERVICES(0.00%)
Contract # 07063001
Totals 153539064.68 0.00 160544965.06 100.0

CountyBOWIE
Highway IH 30
From AT FM 2253 UNDERPASS
To .
CSJ 0610-07-098
Proj ID STP 2013(843)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.010 3821270.50 226654.78 2266830.83 59.3
Work Order 06-30-15
Work Began 08-18-15
Work Completed  
Time Computed 08-18-15
Contract Working Days 290
Addl Days Granted 0
Working Days Charged 126
Percent Time Used 43
Contractor(s)
HODGES AND SON CONSTRUCTION COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0610-07-098
MORRIS COUNTY CONTRACTORS, L.L.C.(5.81%)
TEXOP CONSTRUCTION (0.74%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.47%)
PENHALL COMPANY(0.19%)
RK HALL, LLC ( 14.06%)
PANOLA SIGN & BARRICADE, INC.(0.83%)
STRIPING TECHNOLOGY, L.P.(1.63%)
WRIGHT BROTHERS EXCAVATING CO. (1.28%)
Contract # 05153012
Totals 3821270.50 226654.78 2266830.83 59.3

CountyCAMP
Highway FM 1519
From CR 3109
To FM 556
CSJ 0633-05-018
Proj ID STP 2016(286)HES
Work Type FLASH CHEV, TEXT SHLDR & CL TEXTURE
 
28.805 1439952.07 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-10-15
Work Began 04-01-16
Work Completed  
Time Computed 00-00-00
Contract Working Days 97
Addl Days Granted 0
Working Days Charged 21
Percent Time Used 21
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0633-05-018
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 11153207
Totals 1439952.07 0.00 0.00 0.0

CountyHARRISON
Highway FM 31
From 1.3 MI N OF PANOLA C/L
To PANOLA C/L
CSJ 0640-01-044
Proj ID STP 1502(054)
Work Type CEMENT TRT, FL BS, SURF & PAV MARKS
 
1.261 837048.73 0.00 838239.44 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-15-15
Work Began 06-03-15
Work Completed 12-28-15
Time Computed 06-15-15
Contract Working Days 45
Addl Days Granted 0
Working Days Charged 40
Percent Time Used 88
Contractor(s)
H. V. CAVER, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0640-01-044
SOUTHWEST ENVIRONMENT SERVICES LLC (0.17%)
PANOLA SIGN & BARRICADE, INC.(0.55%)
STRIPE-A-ZONE, INC.(1.99%)
MADDEN CONTRACTING COMPANY, LLC. ( 29.92%)
JOHNSON CONSTRUCTION SERVICES, LLC.(4.12%)
Contract # 04153252
Totals 837048.73 0.00 838239.44 100.0

CountyHARRISON
Highway FM 31
From INDIAN SPRINGS ROAD
To PANOLA C/L
CSJ 0640-01-047
Proj ID STP 2015(249)HESG
Work Type FLASH CHEV, TEXT SHLDR & CL TEXTURE
 
24.186 1234567.06 0.00 1112981.53 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-14-14
Work Began 01-26-15
Work Completed 08-21-15
Time Computed 01-16-15
Contract Working Days 84
Addl Days Granted 0
Working Days Charged 51
Percent Time Used 60
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0640-01-047
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10143209
Totals 1234567.06 0.00 1112981.53 100.0

CountyPANOLA
Highway FM 31
From US 79
To FM 123
CSJ 0640-02-029
Proj ID STP 2016(737)
Work Type CMT TRT EXIST MTL, OCST, ACP, & PM
 
4.848 3629436.31 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-15-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 176
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DREWERY CONSTRUCTION COMPANY, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0640-02-029
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 02163028
Totals 3629436.31 0.00 0.00 0.0

CountyPANOLA
Highway FM 123
From US 79
To FM 31
CSJ 0731-01-051
Proj ID STP 2016(738)
Work Type CMT TRT BASE, ACP & PVMT MARKINGS
 
21.422 3958704.28 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-29-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 129
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0731-01-051
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 02163231
Totals 3958704.28 0.00 0.00 0.0

CountyHARRISON
Highway FM 450
From AT LITTLE CYPRESS CREEK
To .
CSJ 0843-02-012
Proj ID BR 2013(659)
Work Type REPLACE BRIDGE & APPRS
 
2.006 7845576.22 65034.05 7498569.34 95.5
Work Order 08-08-13
Work Began 08-15-13
Work Completed  
Time Computed 07-01-13
Contract Working Days 440
Addl Days Granted 0
Working Days Charged 327
Percent Time Used 74
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0843-02-012
PANOLA SIGN & BARRICADE, INC.(0.18%)
STRIPING TECHNOLOGY, L.P.(0.92%)
MAC TRANSPORTATION, LTD, L.L.P.(4.24%)
AMERICAN REMEDIATION OPTIONS, INC. (2.46%)
DENMAN DRILLING CO., INC.(0.33%)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.25%)
Contract # 05133220
Totals 7845576.22 65034.05 7498569.34 95.5

CountyCASS
Highway VA
From VARIOUS LOCATIONS
To VARIOUS LOCATIONS
CSJ 0919-00-069
Proj ID STP 2014(055)
Work Type SEAL COAT
 
144.664 5620239.20 0.00 5411908.10 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-06-14
Work Began 08-15-14
Work Completed 07-09-15
Time Computed 05-15-14
Contract Working Days 55
Addl Days Granted 0
Working Days Charged 53
Percent Time Used 96
Contractor(s)
MISSOURI PETROLEUM PRODUCTS COMPANY LLC
SUBCONTRACTOR(S) FOR CCSJ: 0919-00-069
STRIPING TECHNOLOGY, L.P.(8.68%)
BRYDL CONTRACTING, INC.(0.89%)
Contract # 10133006
Totals 5620239.20 0.00 5411908.10 100.0

CountyCASS
Highway VA
From AT VARIOUS LOCATIONS
To .
CSJ 0919-00-070
Proj ID STP 2014(931)
Work Type PAVEMENT MARKINGS
 
144.664 1173861.19 0.00 1129562.60 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-20-14
Work Began 10-01-14
Work Completed 09-18-15
Time Computed 10-01-14
Contract Working Days 50
Addl Days Granted 0
Working Days Charged 31
Percent Time Used 62
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0919-00-070
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07143212
Totals 1173861.19 0.00 1129562.60 100.0

CountyCASS
Highway VA
From VARIOUS LOCATIONS
To .
CSJ 0919-00-071
Proj ID STP 1502(420)
Work Type PAVEMENT MARKINGS
 
0.003 781005.30 1811.42 709091.56 100.0
Work Order 09-11-15
Work Began 12-02-15
Work Completed 03-04-16
Time Computed 10-26-15
Contract Working Days 50
Addl Days Granted 0
Working Days Charged 44
Percent Time Used 88
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0919-00-071
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07153021
Totals 781005.30 1811.42 709091.56 100.0

CountyHARRISON
Highway CR
From ON CR 1114 AT DRAW
To .
CSJ 0919-03-050
Proj ID BR 2012(676)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.171 469994.95 0.00 470189.24 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-14-14
Work Began 01-06-14
Work Completed 07-01-15
Time Computed 01-02-15
Contract Working Days 57
Addl Days Granted 36
Working Days Charged 76
Percent Time Used 81
Contractor(s)
EAST TEXAS BRIDGE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0919-03-050
M & D FOUNDATION DRILLING INDUSTRIES, INC. (5.57%)
JUST GROOVING, LTD.(0.38%)
SOUTHWEST ENVIRONMENT SERVICES LLC (2.31%)
SAMMY G. SMALLWOOD (2.66%)
MESA ROD BUSTERS, INC. (0.17%)
Contract # 09143020
Totals 469994.95 0.00 470189.24 100.0