AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - BRYAN DISTRICT

Last Update: Friday, August 1, 2014
ITEMS 100 2001 TO 169 2004
Items Items Bid Code Range
0100 - 0169
0216 - 0292
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0740 - 0752
1018 - 1122
2151 - 2151
3246 - 3271
4116 - 4562
5172 - 5926
6007 - 6834
7380 - 7380
8020 - 8835
100 2001 - 169 2004
Item No Description Units July 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC 19.160 10,000.00000 44.660 5,715.96507 3
100 2002 PREPARING ROW STA 73.000 1,500.00000 602.270 2,719.25382 9
100 2003 PREPARING ROW (TREE) (5" TO 12" DIA) EA     4.000 750.00000 1
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     6.000 1,000.00000 1
100 2006 PREP ROW (TREE) (LESS THAN 24" DIA) EA     28.000 420.00000 1
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     1.000 3,000.00000 1
103 2001 DISPOSAL OF WATER WELLS EA     2.000 2,500.00000 1
104 2009 REMOVING CONC (RIPRAP) SY 79.000 20.00000 5,253.000 7.28879 3
104 2011 REMOVING CONC (MEDIANS) SY 12.000 20.00000 12.000 20.00000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY 584.000 20.00000 1,992.000 13.99197 6
104 2021 REMOVING CONC (CURB) LF 3,053.000 5.00000 3,053.000 5.00000 1
104 2028 REMOVING CONC (MISC) SY 1,091.000 20.00000 1,139.000 27.58560 2
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF 330.000 10.00000 1,355.000 5.31572 3
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY 19.000 20.00000 19.000 20.00000 1
104 2054 REMOVING CONCRETE (MOW STRIP) LF     500.000 3.00000 1
105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY     75.000 75.00000 1
105 2045 REMOVING STAB BASE AND ASPH PAV (2" - 8" SY     9,182.000 5.00000 1
105 2069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY 847.000 9.00000 847.000 9.00000 1
105 2084 REM STAB BASE & ASPH (6" - 12") SY     2,558.000 10.00000 1
106 2001 OBLITERATING ABANDONED ROAD STA     145.150 309.77265 4
110 2001 EXCAVATION (ROADWAY) CY 33,289.000 4.44267 292,743.000 3.33294 13
110 2002 EXCAVATION (CHANNEL) CY     795.000 8.00000 1
110 2003 EXCAVATION (SPECIAL) CY     296.000 10.00000 1
112 2001 SUBGRADE WIDENING (ORD COMP) STA 452.200 350.00000 1,463.050 203.10099 3
112 2002 SUBGRADE WIDENING (DENS CONT) STA     366.280 178.98875 3
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY 9,924.000 16.00000 10,111.000 16.07398 2
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     214.000 35.00000 1
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     1,009.000 18.00000 1
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 66,493.000 6.35000 1,058,762.000 5.67520 10
132 2022 EMBANKMENT (VEHICLE) (DENS CONT) (TY C) CY     6,500.000 4.00000 1
132 2025 EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY 12,577.000 8.55000 24,964.000 10.26187 2
134 2001 BACKFILL (TY A) STA     2,274.890 37.92293 2
134 2002 BACKFILL (TY B) STA     775.420 55.00000 1
134 2004 BACKFILL (TY A OR B) STA 452.200 120.00000 4,058.650 89.62480 14
150 2001 BLADING STA 452.200 55.00000 454.700 57.44667 2
150 2002 BLADING HR     124.000 134.12903 2
158 2002 SPEC EXCAV WORK (BACKHOE) HR     50.000 100.00000 1
158 2006 SPEC EXCAV WORK (VEHICLE) CY     6,500.000 4.00000 1
160 2001 FURNISHING AND PLACING TOPSOIL (4") STA     827.980 90.33914 2
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY 81,174.000 1.00000 419,250.000 .64682 7
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY 60,910.000 .90000 717,752.000 1.19986 6
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY 99.000 8.00000 99.000 8.00000 1
161 2009 EROSION CONTROL COMPOST CY     21.000 50.00000 1
161 2026 COMPOST MANUF TOPSOIL (BOS OR PB) (6") SY 273.000 10.00000 273.000 10.00000 1
162 2002 BLOCK SODDING SY 17,552.000 2.80578 21,055.000 2.98404 5
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     448,576.000 .09365 6
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 81,174.000 .08000 337,179.000 .07911 5
164 2009 BROADCAST SEED (TEMP) (WARM) SY 40,593.000 .07000 558,302.000 .06608 11
164 2011 BROADCAST SEED (TEMP) (COOL) SY 40,593.000 .07000 547,158.000 .06457 10
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     288,999.000 .08174 4
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 43,730.000 .09000 378,934.000 .05462 2
164 2041 DRILL SEEDING (TEMP) (WARM) SY 21,866.000 .09000 21,866.000 .09000 1
164 2043 DRILL SEEDING (TEMP) (COOL) SY 21,864.000 .09000 21,864.000 .09000 1
164 2045 STRAW OR HAY MULCHING SY     79,087.000 .15000 1
164 2051 DRILL SEED (TEMP) (WARM OR COOL) SY     109,289.000 .08000 2
168 2001 VEGETATIVE WATERING MG 2,244.550 11.95073 33,381.960 5.47868 18
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     333.000 1.50000 1
169 2004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY 8,484.000 1.25000 11,484.000 1.36755 2