AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - BRYAN DISTRICT

Last Update: Thursday, November 20, 2014
ITEMS 1018 2001 TO 1122 2057
Items Items Bid Code Range
0100 - 0169
0216 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0752 - 0752
1018 - 1122
3267 - 3271
4430 - 4562
5172 - 5926
6007 - 6834
1018 2001 - 1122 2057
Item No Description Units November 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
1018 2001 TREE PROTECTION EA     4.000 500.00000 1
1122 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     3,110.000 28.72971 6
1122 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     10,915.000 24.87219 11
1122 2003 ROCK FILTER DAMS (INSTALL) (TY 3) LF     35.000 50.00000 1
1122 2009 ROCK FILTER DAMS (REMOVE) LF     14,060.000 6.34475 15
1122 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     1,014.000 16.15385 5
1122 2019 CONSTRUCTION EXITS (REMOVE) SY     1,014.000 4.92308 5
1122 2024 BACKHOE WORK (EROSION & SEDM CONT) HR     200.000 1.00000 1
1122 2030 CONSTRUCTION PERIMETER FENCE LF     453.000 2.00000 1
1122 2031 SANDBAGS FOR EROSION CONTROL EA     770.000 1.18182 2
1122 2037 TEMPORARY SEDIMENT CONTROL FENCE INSTL LF     83,768.000 2.52000 15
1122 2038 TEMP SDMT CONT FENCE (INLET PROTECTION LF     750.000 1.00000 1
1122 2047 BIOGRD EROSN CONT LOGS (8" DIA) INSTAL LF     686.000 6.32799 2
1122 2048 BIOGRD EROSN CONT LOGS (12" DIA) INSTAL LF     375.000 .76667 2
1122 2049 BIOGRD EROSN CONT LOGS (18" DIA) INSTAL LF     237.000 8.00000 2
1122 2050 BIGRD ERSN CNT LGS (12" OR 18" DIA) INST LF     1,732.000 4.50000 1
1122 2056 BIODEGRADBLE EROSION CONTROL LOGS REMO LF     2,412.000 1.22284 5
1122 2057 TEMPORARY SEDIMENT CONTROL FENCE REMOV LF     83,768.000 .40581 15