Item No Description Units July 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
1002 6001 LANDSCAPE AMENITY EA     1.000 300.00000 1
1004 6001 TREE PROTECTION EA     2.000 300.00000 1
1122 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     1,055.000 20.99052 3
1122 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     1,955.000 24.74425 6
1122 2009 ROCK FILTER DAMS (REMOVE) LF     3,010.000 6.65947 8
1122 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     356.000 15.89888 3
1122 2019 CONSTRUCTION EXITS (REMOVE) SY     356.000 4.43820 3
1122 2037 TEMPORARY SEDIMENT CONTROL FENCE INSTL LF     33,421.000 2.09317 9
1122 2048 BIOGRD EROSN CONT LOGS (12" DIA) INSTAL LF     180.000 3.25000 1
1122 2049 BIOGRD EROSN CONT LOGS (18" DIA) INSTAL LF     282.000 8.00000 1
1122 2056 BIODEGRADBLE EROSION CONTROL LOGS REMO LF     462.000 1.41558 2
1122 2057 TEMPORARY SEDIMENT CONTROL FENCE REMOV LF     33,421.000 .44562 9