AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - DALLAS DISTRICT

Last Update: Friday, June 26, 2015
ITEMS 100 2002 TO 161 2026
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0712 - 0784
1005 - 1158
2021 - 2274
3165 - 3270
4007 - 4686
5007 - 5935
6001 - 6949
7012 - 7035
8020 - 8998
100 2002 - 161 2026
161 6008 - 193 6023
Item No Description Units June 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA     3,129.410 3,038.78475 29
100 6002 PREPARING ROW STA 758.170 1,645.49771 2,452.580 1,333.45870 15
104 2001 REMOVING CONC (PAV) SY     313,367.000 5.36589 13
104 2009 REMOVING CONC (RIPRAP) SY     18,127.000 6.36966 17
104 2010 REMOVING CONC (RIPRAP) CY     41.200 200.00000 1
104 2011 REMOVING CONC (MEDIANS) SY     22,683.900 8.35530 13
104 2014 REMOVING CONC (FOUNDATIONS) CY     4.200 50.00000 1
104 2015 REMOVING CONC (SIDEWALKS) SY     10,107.900 10.45131 11
104 2017 REMOVING CONC (DRIVEWAYS) SY     44,416.800 9.64048 20
104 2021 REMOVING CONC (CURB) LF     5,056.000 4.15049 6
104 2022 REMOVING CONC (CURB AND GUTTER) LF     7,722.000 5.88537 6
104 2023 REMOVING CONC (CTB) LF     4,883.000 9.28650 2
104 2024 REMOVING CONC (RETAINING WALLS) SY     192.000 35.93750 2
104 2027 REMOVING CONC (APPR SLAB) SY     882.000 6.00000 1
104 2028 REMOVING CONC (MISC) SY     191.000 23.36597 4
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     10,053.000 4.76383 4
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY     130.100 31.72483 4
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     3,826.000 5.71966 3
104 2037 REMOVE CONC (RAIL) LF     64.000 60.00000 1
104 2040 REMOVING CONC (PAVERS) SY     243.000 8.91852 2
104 2044 REMOVING CONC (FLUME) SY     159.000 12.86792 3
104 2046 REMOV STR (SCREEN WALL) LF     26.000 66.50000 1
104 2054 REMOVING CONCRETE (MOW STRIP) LF     550.000 5.00000 1
104 6001 REMOVING CONC (PAV) SY 6,416.000 10.34913 18,657.000 10.86361 4
104 6009 REMOVING CONC (RIPRAP) SY 1,891.000 9.00000 3,167.000 8.88868 6
104 6011 REMOVING CONC (MEDIANS) SY 25.000 54.00000 3,776.000 20.23578 4
104 6014 REMOVING CONC (FOUNDATIONS) CY     1.200 831.95833 1
104 6015 REMOVING CONC (SIDEWALKS) SY     1,836.000 11.57119 3
104 6017 REMOVING CONC (DRIVEWAYS) SY     11,752.000 7.62912 3
104 6021 REMOVING CONC (CURB) LF     819.000 6.41026 3
104 6022 REMOVING CONC (CURB AND GUTTER) LF 1,091.000 3.00000 1,091.000 3.00000 1
104 6032 REMOVING CONC (WHEELCHAIR RAMP) SY     75.000 40.00000 1
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY 146.000 10.00000 146.000 10.00000 1
104 6044 REMOVING CONC (FLUME) SY 8.000 47.00000 8.000 47.00000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     7,808.000 6.44953 3
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     8,415.000 4.86191 3
105 2013 REMOVING STAB BASE & ASPH PAV (9") SY     1,233.000 5.92000 1
105 2014 REMOVING STAB BASE & ASPH PAV (7" - 12") SY     21,820.000 3.20000 1
105 2015 REMOVING STAB BASE & ASPH PAV (8" - 10") SY     10,568.000 5.71886 3
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     3,496.000 8.00000 1
105 2022 REMOVING STAB BASE AND ASPH PAV (13") SY     3,909.700 8.00000 1
105 2030 REMOVING STAB BASE & ASPH PAV (8" - 14") SY     4,027.000 7.68488 2
105 2037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     71,166.000 3.69390 2
105 2039 REMOVE STAB BASE AND ASPH PAV (6" - 20") SY     87,628.000 3.73000 1
105 2041 REMOVING STAB BASE AND ASPH PAV (8") SY     46,655.000 .10000 1
105 2045 REMOVING STAB BASE AND ASPH PAV (2" - 8" SY     3,448.000 8.63986 2
105 2049 REMOVING STAB BASE & ASPH PAV (4" - 22") SY     38,625.000 5.25000 1
105 2052 REMOVE STAB BASE & ASPH PAV (4" - 5") SY     113,560.000 1.50000 1
105 2055 REMOVING STAB BASE AND ASPH PAV (9" - 14" SY     2,045.000 7.35000 1
105 2058 REMOVING STAB BASE & ASPH PAV (10" - 12" SY     785.000 13.00000 1
105 2059 REMOVING STAB BASE & ASPH PAV (13" - 18") SY     66,645.000 5.96000 1
105 2070 REMOVING STAB BASE & ASPH PAV (6" - 8" SY     6,856.200 8.22863 2
105 2075 REMOV STAB BASE AND ASPH PAV (10" - 18") SY     41,364.000 5.13284 2
105 2078 REMOVE STAB BASE & ASPH PAV (24" - 38") SY     530.000 40.00000 1
105 2079 REMOVING STAB BASE & ASPH PAV (4" - 12") SY     1,142.000 11.50000 1
105 6012 REMOVING STAB BASE AND ASPH PAV (2" - 6" CY 34,232.000 .50000 34,232.000 .50000 1
105 6013 REMOVING STAB BASE & ASPH PAV (9") SY     3,300.000 12.60000 1
105 6019 REMOVING STAB BASE & ASPH PAV (14") SY 5,438.000 11.00000 5,438.000 11.00000 1
105 6021 REMOVING STAB BASE AND ASPH PAV (0 - 4") SY 1,388.000 7.00000 1,388.000 7.00000 1
105 6030 REMOVING STAB BASE & ASPH PAV (8" - 14") SY 6,914.000 6.00000 6,914.000 6.00000 1
105 6043 REMOVING STAB BASE & ASPH PAV (0 - 6") SY 290.000 6.00000 3,034.000 6.58787 2
105 6054 REMOVING STAB BASE & ASPH PAV (18") SY 2,376.000 13.00000 2,376.000 13.00000 1
105 6069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     1,220.000 10.00000 1
105 6070 REMOVING STAB BASE & ASPH PAV (6" - 8" SY 4,728.000 5.00000 4,728.000 5.00000 1
105 6074 REMOVING STAB BASE AND ASPH PAV (4") SY 922.000 7.00000 922.000 7.00000 1
105 6075 REMOV STAB BASE AND ASPH PAV (10" - 18") SY 5,578.000 15.00000 5,578.000 15.00000 1
105 6079 REMOVING STAB BASE & ASPH PAV (4" - 12") SY 1,370.000 .75000 9,442.000 5.23824 2
105 6090 RMV STAB BS & ASPH PAV (11.5" - 22") SY     229,150.000 5.46000 1
105 6109 REMOVING STAB BASE & ASPH PAV (8" - 19") SY     9,601.000 11.55000 1
106 6002 OBLITERATING ABANDONED ROAD SY     2,360.000 4.01000 1
110 2001 EXCAVATION (ROADWAY) CY     1,163,401.600 5.68826 26
110 2002 EXCAVATION (CHANNEL) CY     65,761.000 6.53551 7
110 2003 EXCAVATION (SPECIAL) CY     4,936.700 13.98920 3
110 6001 EXCAVATION (ROADWAY) CY 102,788.000 5.11571 394,596.000 4.85619 15
110 6002 EXCAVATION (CHANNEL) CY 2,683.000 12.23705 3,492.000 13.04782 4
112 2001 SUBGRADE WIDENING (ORD COMP) STA     864.790 390.24702 5
112 2002 SUBGRADE WIDENING (DENS CONT) STA     348.200 1,000.00000 1
112 6001 SUBGRADE WIDENING (ORD COMP) STA 348.000 420.00000 1,001.840 355.07017 3
112 6002 SUBGRADE WIDENING (DENS CONT) STA     23.770 350.00000 1
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     723,012.900 5.45118 17
132 2008 EMBANKMENT (FINAL) (DENS CONT) (TY D) CY     3,295.000 6.50000 1
132 2010 EMBANKMENT (ORIGINAL) (DENS CONT) (TY A) CY     759.400 21.00000 1
132 2025 EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY     866,587.000 3.55886 8
132 2026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY     345,134.100 14.84054 13
132 6006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 67,824.000 18.56022 129,593.000 15.72244 11
132 6025 EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY 43,206.000 8.77708 356,482.000 6.31478 4
132 6026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY 1,518.000 48.13241 3,432.000 35.45278 4
134 2002 BACKFILL (TY B) STA     230.000 157.50000 1
134 2004 BACKFILL (TY A OR B) STA     1,545.920 158.37270 7
134 6004 BACKFILL (TY A OR B) STA 661.070 227.64193 1,629.050 186.86778 7
134 6008 BACKFILL (TY A OR B) CY     133.000 175.00000 1
150 2001 BLADING STA     634.750 130.94722 2
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     193,166.000 .57562 3
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY     392.000 8.00000 1
160 2005 FURNISHING AND PLACING TOPSOIL CY     532.000 30.00000 1
161 2001 COMPOST MANUF TOPSOIL (BOS) (4") STA     545.500 126.98343 3
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY     1,102,950.640 1.08036 16
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY     30,199.100 5.56530 3
161 2014 COMPOST MANUF TOPSOIL (BOS OR PB) (4") SY     314,808.000 1.05916 4
161 2026 COMPOST MANUF TOPSOIL (BOS OR PB) (6") SY     1,417.440 4.35000 1