AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - DALLAS DISTRICT

Last Update: Friday, June 26, 2015
ITEMS 400 2005 TO 423 6005
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0712 - 0784
1005 - 1158
2021 - 2274
3165 - 3270
4007 - 4686
5007 - 5935
6001 - 6949
7012 - 7035
8020 - 8998
400 2005 - 423 6005
423 6008 - 450 2071
450 2076 - 464 2002
464 2003 - 465 4115
465 4116 - 466 6182
466 6183 - 496 2008
496 2009 - 496 6050
Item No Description Units June 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
400 2005 CEM STABIL BKFL CY     1,392.000 112.82093 7
400 2006 CUT & RESTORING PAV SY     1,512.000 125.41623 5
400 2009 CUT & RESTORING PAV (CONC) SY     667.000 195.80435 2
400 2016 CEMENT STAB BACKFILL (INLET OR MH) CY     104.000 57.75000 1
400 6005 CEM STABIL BKFL CY 40.000 100.00000 383.000 142.75457 4
400 6006 CUT & RESTORING PAV SY 165.500 131.92157 1,241.500 105.67704 6
401 2001 FLOWABLE BACKFILL CY     105.200 168.96293 5
401 6001 FLOWABLE BACKFILL CY 25.000 635.00000 25.000 635.00000 1
402 2001 TRENCH EXCAVATION PROTECTION LF     98,483.000 1.21722 14
402 6001 TRENCH EXCAVATION PROTECTION LF 2,406.000 3.69929 5,733.000 3.98277 9
403 2001 TEMPORARY SPL SHORING SF     294,569.700 14.97463 22
403 2002 TEMPORARY SPL SHORING (SOIL NAIL) SF     3,753.000 29.07474 2
403 2007 TEMPORARY SPL SHORING (ROCK NAIL) SF     147.000 52.50000 1
403 6001 TEMPORARY SPL SHORING SF 13,257.000 33.13495 38,051.000 25.19846 13
416 2001 DRILL SHAFT (18 IN) LF     3,946.000 53.70608 7
416 2002 DRILL SHAFT (24 IN) LF     22,176.000 62.53503 5
416 2003 DRILL SHAFT (30 IN) LF     20,137.000 107.73220 6
416 2004 DRILL SHAFT (36 IN) LF     32,140.000 137.86461 16
416 2005 DRILL SHAFT (42 IN) LF     22,174.000 166.94275 5
416 2006 DRILL SHAFT (48 IN) LF     7,016.000 239.99000 1
416 2007 DRILL SHAFT (54 IN) LF     612.000 303.40000 1
416 2008 DRILL SHAFT (60 IN) LF     858.000 401.53000 1
416 2010 DRILL SHAFT (72 IN) LF     262.000 621.67000 1
416 2018 DRILL SHAFT (SIGN MTS) (24 IN) LF     52.000 258.35231 2
416 2019 DRILL SHAFT (SIGN MTS) (30 IN) LF     66.000 108.47000 1
416 2020 DRILL SHAFT (SIGN MTS) (36 IN) LF     16.000 200.00000 1
416 2021 DRILL SHAFT (SIGN MTS) (42 IN) LF     640.000 256.36891 3
416 2022 DRILL SHAFT (SIGN MTS) (48 IN) LF     374.000 519.25364 6
416 2023 DRILL SHAFT (SIGN MTS) (54 IN) LF     650.500 328.27620 4
416 2026 DRILL SHAFT (HIGH MAST POLE) (60 IN) LF     103.000 426.05165 2
416 2029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF     406.000 219.00384 5
416 2031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF     263.000 174.62989 7
416 2032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF     1,323.000 198.78371 15
416 2034 DRILL SHAFT (TRF SIG POLE) (48 IN) LF     1,342.000 292.78230 13
416 2059 DRILL SHAFT (24 IN) (HPC) LF     632.000 95.00000 1
416 2086 DRILL SHAFT (RDWY ILL POLE) (24 IN) LF     27.500 100.00000 1
416 6001 DRILL SHAFT (18 IN) LF 176.000 75.00000 1,084.000 40.52280 2
416 6002 DRILL SHAFT (24 IN) LF 1,010.000 143.66337 1,010.000 143.66337 2
416 6003 DRILL SHAFT (30 IN) LF     135.000 173.00000 1
416 6004 DRILL SHAFT (36 IN) LF 2,762.000 150.98298 4,103.000 152.50270 7
416 6005 DRILL SHAFT (42 IN) LF     1,929.000 150.34000 1
416 6007 DRILL SHAFT (54 IN) LF     62.000 499.18000 1
416 6018 DRILL SHAFT (SIGN MTS) (24 IN) LF     66.000 93.72727 2
416 6020 DRILL SHAFT (SIGN MTS) (36 IN) LF     70.000 210.00000 1
416 6021 DRILL SHAFT (SIGN MTS) (42 IN) LF 16.000 475.00000 312.000 223.58974 2
416 6023 DRILL SHAFT (SIGN MTS) (54 IN) LF 18.000 525.00000 18.000 525.00000 1
416 6029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF     140.000 119.65343 2
416 6031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF     176.000 184.42000 3
416 6032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF     591.000 198.10702 3
416 6034 DRILL SHAFT (TRF SIG POLE) (48 IN) LF     330.000 291.14800 4
420 2001 CL A CONC (MISC) CY     15.000 900.00000 1
420 2002 CL B CONC (FLUME) CY     265.100 417.17578 4
420 2004 CL C CONC (BENT) CY     30.800 1,500.00000 1
420 2005 CL C CONC (FOOTING) CY     531.200 644.37123 2
420 2006 CL C CONC (RAIL FOUNDATION) CY     13.900 500.00000 1
420 2010 CL C CONC (SIGN COLUMN) CY     82.000 750.00000 1
420 2011 CL C CONC (RETAINING WALL) CY     9.100 1,000.00000 1
420 2013 CL C CONC (MISC) CY     1,077.100 503.73224 4
420 2019 CL C CONC (CAP) CY     346.100 621.00000 1
420 2041 CL C CONC (ABUT) (HPC) CY     2,368.300 767.85558 13
420 2042 CL C CONC (BENT) (HPC) CY     7,956.600 694.67111 9
420 2051 CL C CONC (COLUMN) CY     347.500 944.53871 2
420 2061 CL S CONC (HPC) BAS CY     2,468.000 474.30068 6
420 2068 CL S CONC (HPC) (SLAB) CY     158.100 680.00000 1
420 2069 CL S CONC (HPC) (SHEAR KEY) CY     48.400 270.00000 1
420 2092 CL C CONC (CAP) (MASS PLACEMENT) (HPC) CY     705.300 690.00000 1
420 2093 CL C CONC (COLUMN) (MASS PLACE) (HPC) CY     1,124.600 575.00000 1
420 2094 CL C CONC (FOOTING) (MASS PLACE) (HPC) CY     725.100 500.00000 1
420 2120 CL C CONC (BUS STOP) CY     13.000 500.00000 1
420 2123 CL C CONC (FOOTING) (HPC) CY     1,186.400 600.00000 1
420 2124 CL S CONC (SLAB) SF     5,082.000 14.00000 1
420 2221 CL S CONC (JUNCTION BOX) CY     103.000 775.00000 1
420 2223 CL C CONC (COLUMN) (HPC) CY     2,505.300 689.15759 3
420 2256 CL S CONC (APPR SLAB) (HPC) CY     2,019.000 417.70050 7
420 2269 CL C CONC (CAP) (HPC) CY     5,389.500 805.94257 3
420 2276 CL C CONC (WALL) CY     44.100 545.00000 1
420 2291 CL S CONC (BRIDGE MEDIAN) (HPC) CY     1,600.500 352.54489 4
420 2292 CL S CONC (BRIDGE SDWLK) (HPC) CY     423.800 372.62105 2
420 6014 CL C CONC (ABUT) (HPC) CY 327.000 1,082.56575 958.900 850.56125 6
420 6026 CL C CONC (BENT) (HPC) CY 50.000 1,410.00000 544.900 818.98574 3
420 6030 CL C CONC (CAP) (HPC) CY 68.400 980.00000 68.400 980.00000 1
420 6038 CL C CONC (COLUMN) (HPC) CY 23.300 780.00000 23.300 780.00000 1
420 6074 CL C CONC (MISC) CY     12.000 500.00000 1
420 6143 CL S CONC (JUNCTION BOX) CY     4.900 1,027.46939 1
422 2003 REINF CONC SLAB (HPC) (CL S) SF     1,289,577.000 14.10421 12
422 6002 REINF CONC SLAB (HPC) SF 30,914.000 24.16924 84,324.000 18.99868 6
422 6006 REINF CONC SLAB (BOX BEAM) (HPC) SF     2,747.500 16.00000 1
422 6014 BRIDGE SIDEWALK (HPC) SF     10,296.000 6.76000 1
422 6016 APPROACH SLAB (HPC) CY 465.200 449.93551 1,197.200 408.43344 5
422 6023 SHEAR KEY CY     14.000 400.00000 1
423 2001 RETAINING WALL (MSE) SF     368,947.000 49.64083 10
423 2005 RETAINING WALL (TEMP WALL) SF     24,417.000 13.65000 1
423 2006 RETAINING WALL (CONC BLOCK) SF     887.000 37.32807 2
423 2007 RETAINING WALL (SPREAD FOOTING) SF     7,225.000 68.67986 3
423 2009 RETAINING WALL (SOIL NAILED) (FACIA) SF     3,008.000 52.50000 1
423 2010 RETAINING WALL (ROCK NAILED) (FACIA) SF     9,129.000 55.00000 1
423 2011 RETAINING WALL (DRILL SHAFT) (FACIA) SF     39,108.000 47.64197 2
423 2012 RETAINING WALL (CAST - IN - PLACE) SF     17,764.000 42.60431 4
423 2025 RETAINING WALL (SPECIAL) SF     200.000 110.00000 1
423 6005 RETAINING WALL (SPREAD FOOTING) SF     5,608.000 56.00000 1