AVERAGE LOW BID UNIT PRICE - MAINTENANCE - DALLAS DISTRICT

Last Update: Monday, April 4, 2016
ITEMS 700 2001 TO 771 6006
Items Items Bid Code Range
0104 - 0168
0247 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0636 - 0678
0700 - 0784
1122 - 1122
3024 - 3267
4100 - 4124
6001 - 6834
7000 - 7173
8251 - 8944
700 2001 - 771 6006
771 6007 - 784 6001
Item No Description Units March 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
700 2001 POTHOLE REPAIR (STANDARD) SY     50,000.000 14.00000 2
700 2005 POTHOLE REPAIR (SAW - CUT) SY     20,000.000 19.00000 2
700 6001 POTHOLE REPAIR (STANDARD) SY     100,000.000 55.00000 2
700 6002 POTHOLE REPAIR (STANDARD) CY     1,750.000 543.00000 2
700 6005 POTHOLE REPAIR (SAW - CUT) SY     2,000.000 65.00000 2
712 6008 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,867.920 570.46465 6
713 6002 JT SEALING AND CLEANING (LONGT CNTR JTS LF     31,170.000 7.60000 1
720 6003 SPALLING REPAIR (POLYMERIC) (SEMIRIGID GAL     253.000 130.00000 1
730 6001 STRIP MOWING AC     3,752.000 28.17697 4
730 6002 FULL - WIDTH MOWING AC     52,483.000 27.50353 6
730 6104 FULL - WIDTH MOWING (RURAL) AC     9,169.000 35.65743 3
730 6105 FULL - WIDTH MOWING (URBAN) AC     5,125.000 32.67141 3
731 6007 PAVEMENT EDGES, STRUCTURES & FIXTURES MI     907.000 110.78280 7
731 6011 BROADCAST APPLICATION AC     15,232.000 26.55695 9
735 2002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI     4,420.000 15.00000 1
735 2004 DEBRIS REMOVAL (FRONTAGE ROADS) MI     332.280 15.00000 1
735 2006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI     1,269.320 15.00000 1
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI     10.000 25.00000 1
735 6002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI     44,841.400 25.22187 4
735 6004 DEBRIS REMOVAL (FRONTAGE ROADS) MI     536.070 44.65807 2
735 6006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI     11,230.570 24.13773 4
735 6007 DEBRIS REMOVAL (SPOT DEBRIS) MI     15.000 100.00000 1
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI     366.520 200.00000 1
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI     167.920 100.00000 1
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     64.000 150.00000 1
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI     97.640 122.00000 1
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     160.000 100.00000 1
738 2010 CLEANING / SWEEPING (SPOT) MI     25.000 100.00000 1
738 6002 CLEANING / SWEEPING (CENTER MEDIAN) MI     852.120 121.01089 2
738 6004 CLEANING / SWEEPING (OUTSIDE MAIN LANE MI     653.520 119.79863 2
738 6006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     222.400 155.41367 2
738 6008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP MI     179.240 135.43182 2
738 6009 CLEANING / SWEEPING (AGGREGATE REMOVAL MI     446.320 149.58953 4
738 6010 CLEANING / SWEEPING (SPOT) MI     40.000 275.00000 1
738 6011 CLEANING / SWEEPING (HANDWORK) SY     109,824.000 0.15000 1
738 6014 CLEAN / SWEEP - CENTER MEDIAN - AREA (1 MI     256.200 75.00000 2
738 6015 CLEAN / SWEEP - CENTER MEDIAN - AREA (2 MI     383.040 75.00000 2
738 6034 CLEAN / SWEEP - OUTSIDE MAIN LANE - AREA (1 MI     346.880 75.00000 2
738 6035 CLEAN / SWEEP - OUTSIDE MAIN LANE - AREA (2 MI     446.800 75.00000 2
738 6054 CLEAN / SWEEP - FRONTAGE ROAD - AREA (1 MI     31.200 75.00000 2
738 6074 CLEAN / SWEEP - (ENTR / EXT RMP) (AREA 1 MI     9.600 75.00000 2
752 6003 TREE TRIMMING / BRUSH REMOVAL MI     119.000 1,132.56303 2
752 6004 TREE TRIMMING / BRUSH REMOVAL (CHANNELS AC     7.000 1,010.00000 2
752 6005 TREE REMOVAL (4" - 12" DIA) EA     920.000 81.40000 2
752 6006 TREE REMOVAL (12" - 18" DIA) EA     181.000 91.70000 2
752 6007 TREE REMOVAL (18" - 24" DIA) EA     65.000 117.42000 2
752 6008 TREE REMOVAL (24" - 30" DIA) EA     27.000 163.82000 2
752 6009 TREE REMOVAL (30" - 36" DIA) EA     15.000 559.45000 2
752 6010 TREE REMOVAL (36" - 42" DIA) EA     2.000 606.85000 1
752 6011 TREE REMOVAL (42" - 48" DIA) EA     8.000 617.15000 1
752 6012 TREE REMOVAL (48" - 60" DIA) EA     2.000 678.97000 1
752 6013 TREE REMOVAL (60" - 72" DIA) EA     1.000 771.69000 1
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     30,000.000 1.50000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     40,000.000 7.00000 2
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     1,600.000 15.25000 2
770 2006 REALIGN POSTS EA     3,000.000 8.00000 2
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     50.000 0.01000 2
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     150.000 600.00000 2
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     1,300.000 35.00000 2
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     1,600.000 21.00000 2
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     20.000 0.01000 2
770 2018 REM / REPL TIMBER POST W / O CONC FND EA     3,200.000 20.00000 2
770 2022 REM & RESET SGT IMPACT HEAD EA     200.000 75.00000 2
770 2023 REPLACE SGT OBJECT MARKER EA     150.000 20.00000 2
770 2024 REPLACE SGT CABLE ANCHOR EA     40.000 35.00000 2
770 2025 REPLACE SGT CABLE ASSEMBLY EA     150.000 40.00000 2
770 2026 REPLACE SGT STRUT EA     40.000 70.00000 2
770 2027 REMOVE & REPLACE BLOCKOUT EA     500.000 7.50000 2
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF     42,000.000 9.71429 3
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     300.000 20.00000 2
770 6003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM LF     550.000 23.63636 3
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF     100.000 20.00000 2
770 6005 REM / REPAIR RAIL ELEMENT (CURVED RAIL) LF     100.000 20.00000 2
770 6006 RAISE RAIL ELEMENT LF     4,000.000 3.00000 2
770 6008 REALIGN EXISTING RAIL LF     4,000.000 3.00000 2
770 6012 REM / REPL TIMBER POST W / O CONC FND EA     2,700.000 17.11111 3
770 6013 REM / REPL STEEL POST W / O CONC FND EA     40.000 50.00000 2
770 6014 REM / REPL TIMBER POST W / CONC FND EA     20.000 50.00000 2
770 6015 REM / REPL STEEL POST W / CONC FND EA     40.000 100.00000 2
770 6016 REPAIR STEEL POST WITH BASE PLATE EA     110.000 186.36364 3
770 6017 REALIGN POSTS EA     2,200.000 9.63636 3
770 6019 REMOVE & REPLACE BLOCKOUT EA     1,300.000 10.00000 3
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     13,000.000 30.53846 3
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA     1,300.000 39.07692 3
770 6023 REPAIR OF TERMINAL ANCHORS POSTS EA     25.000 50.00000 1
770 6024 REPLACE TERMINAL ANCHOR POSTS EA     10.000 20.00000 2
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA     6.000 3,000.00000 2
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     140.000 1,000.00000 3
770 6029 REM & RESET SGT IMPACT HEAD EA     325.000 130.76923 3
770 6030 REPLACE SGT CABLE ASSEMBLY EA     135.000 72.22222 3
770 6031 REPLACE SGT CABLE ANCHOR EA     50.000 200.00000 3
770 6032 REPLACE SGT STRUT EA     35.000 200.00000 3
770 6033 REPLACE SGT OBJECT MARKER EA     70.000 21.42857 3
770 6052 REPAIR STEEL POST WITH BASE PLATE EA     100.000 200.00000 2
771 6001 REPLACE POSTS (TL - 3) EA     600.000 75.00000 2
771 6002 REPLACE POSTS (TL - 4) EA     3,000.000 40.00000 2
771 6003 CABLE SPLICE / TURNBUCKLE (TL - 3) EA     10.000 50.00000 2
771 6004 CABLE SPLICE / TURNBUCKLE (TL - 4) EA     70.000 25.00000 2
771 6005 REPAIR CONCRETE FOUNDATION (TL - 3) EA     10.000 100.00000 2
771 6006 REPAIR CONCRETE FOUNDATION (TL - 4) EA     40.000 50.00000 2