AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - LUFKIN DISTRICT

Last Update: Friday, June 26, 2015
ITEMS 100 2002 TO 169 6004
Items Items Bid Code Range
0100 - 0169
0204 - 0276
0305 - 0360
0400 - 0497
0500 - 0560
0610 - 0687
0740 - 0764
1122 - 1122
3150 - 3284
4430 - 4674
5369 - 5926
6001 - 6834
8020 - 8835
100 2002 - 169 6004
Item No Description Units June 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA     602.300 3,411.05149 10
100 6002 PREPARING ROW STA 150.760 826.98992 654.960 946.34329 8
104 2001 REMOVING CONC (PAV) SY     19,876.000 9.38943 4
104 2009 REMOVING CONC (RIPRAP) SY     1,727.000 10.26404 2
104 2011 REMOVING CONC (MEDIANS) SY     2,234.000 5.72158 2
104 2015 REMOVING CONC (SIDEWALKS) SY     1,364.000 3.75000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY     4,531.000 4.78901 5
104 2021 REMOVING CONC (CURB) LF     1,399.000 7.12652 2
104 2022 REMOVING CONC (CURB AND GUTTER) LF     17,988.000 3.01437 3
104 2023 REMOVING CONC (CTB) LF     1,033.000 10.00000 1
104 2028 REMOVING CONC (MISC) SY     949.000 20.00000 2
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     858.000 10.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     41.000 2.66000 1
104 6015 REMOVING CONC (SIDEWALKS) SY 21.000 18.90000 21.000 18.90000 1
104 6017 REMOVING CONC (DRIVEWAYS) SY 128.000 18.90000 128.000 18.90000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     19,617.000 2.38000 1
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     9,193.000 11.01561 2
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     6,930.000 4.48000 1
105 2069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     6,851.000 3.88373 2
105 2108 RMV STAB BASE & ASPH PV (17") SY     3,745.000 6.53000 1
105 6013 REMOVING STAB BASE & ASPH PAV (9") SY 3,863.000 8.00000 3,863.000 8.00000 1
105 6019 REMOVING STAB BASE & ASPH PAV (14") SY     7,148.000 6.00000 1
105 6023 REMOVING STAB BASE AND ASPH PAV (5") SY 589.000 15.00000 589.000 15.00000 1
105 6084 REM STAB BASE & ASPH (6" - 12") SY     7,194.000 3.60000 1
106 6002 OBLITERATING ABANDONED ROAD SY     250.000 30.00000 1
110 2001 EXCAVATION (ROADWAY) CY     136,612.000 9.38671 8
110 2002 EXCAVATION (CHANNEL) CY     6,126.000 15.00000 1
110 6001 EXCAVATION (ROADWAY) CY 12,461.000 10.10922 38,384.000 7.99601 7
112 2001 SUBGRADE WIDENING (ORD COMP) STA     45.110 50.00000 1
112 6001 SUBGRADE WIDENING (ORD COMP) STA 97.540 93.63123 128.540 143.40120 3
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     5.000 100.00000 1
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     145.000 46.00000 1
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     6,934.000 15.47300 5
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     2,005.000 30.00000 1
132 2007 EMBANKMENT (FINAL) (ORD COMP) (TY D) CY     128.000 15.00000 1
132 2008 EMBANKMENT (FINAL) (DENS CONT) (TY D) CY     41,577.000 4.65399 3
132 2019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     3,521.000 22.36467 4
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 1,388.000 20.00000 2,586.000 17.22042 2
132 6004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     27,015.000 8.00000 1
132 6006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 12,648.000 14.25000 44,551.000 10.72615 3
132 6019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY 4,420.000 14.67000 4,641.000 15.01905 2
134 2002 BACKFILL (TY B) STA     353.650 97.41889 3
134 6002 BACKFILL (TY B) STA 91.070 77.76996 91.070 77.76996 1
150 2002 BLADING HR     49.000 75.20408 3
158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR     392.000 48.45408 5
158 6003 SPEC EXCAV WORK (HYD EXCAVATOR) HR     76.000 63.63158 2
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     10,790.000 2.06300 4
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 1,542.000 5.00000 1,542.000 5.00000 1
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY     240,993.000 1.60091 3
161 2026 COMPOST MANUF TOPSOIL (BOS OR PB) (6") SY     9.000 100.00000 1
161 6002 COMPOST MANUF TOPSOIL (4") SY     31,298.000 2.40000 1
161 6017 COMPOST MANUF TOPSOIL (4") SY 16,268.000 1.10000 249,118.000 .90870 3
162 2002 BLOCK SODDING SY     51,764.000 3.23068 10
162 6002 BLOCK SODDING SY 2,632.000 3.78000 8,451.000 3.49973 6
164 2009 BROADCAST SEED (TEMP) (WARM) SY     19,670.000 .12204 4
164 2011 BROADCAST SEED (TEMP) (COOL) SY     9,751.000 .11394 3
164 2021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     221,706.000 .27433 9
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     15,401.000 .31136 2
164 2025 CELL FBR MLCH SEED (PERM) (URBAN) (SANDY) SY     69,698.000 .22000 1
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY     124,351.000 .18499 4
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY     124,351.000 .18499 4
164 6009 BROADCAST SEED (TEMP) (WARM) SY 2,643.000 1.36766 16,159.000 .56103 4
164 6011 BROADCAST SEED (TEMP) (COOL) SY 2,643.000 1.36766 7,600.000 .57346 3
164 6021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY 19,782.000 .47229 301,521.000 .23813 6
164 6023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY 25,578.000 .36000 25,578.000 .36000 1
164 6029 CELL FBR MLCH SEED (TEMP) (WARM) SY 9,125.000 .27000 125,551.000 .18048 3
164 6031 CELL FBR MLCH SEED (TEMP) (COOL) SY 9,125.000 .27000 125,551.000 .18048 3
168 2001 VEGETATIVE WATERING MG     4,289.700 12.61824 15
168 6001 VEGETATIVE WATERING MG 285.800 27.71809 2,698.300 13.82097 8
169 2002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     1,218.000 1.17438 2
169 2004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY     3,536.000 .91492 2
169 2006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY     5,293.000 1.10000 1
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 1,726.000 1.60000 9,934.000 1.16625 4
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 100.000 1.15000 100.000 1.15000 1
169 6004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY 654.000 2.49266 2,097.000 1.56874 3