Item No Description Units February 28, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA 92.030 1,693.63251 692.880 3,058.30203 12
104 2001 REMOVING CONC (PAV) SY 5,148.000 9.00000 20,208.000 11.99642 5
104 2009 REMOVING CONC (RIPRAP) SY     1,767.000 10.37125 3
104 2011 REMOVING CONC (MEDIANS) SY     2,237.000 5.82789 3
104 2015 REMOVING CONC (SIDEWALKS) SY 1,364.000 3.75000 1,364.000 3.75000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY 242.000 12.94215 4,531.000 4.78901 5
104 2021 REMOVING CONC (CURB) LF     1,399.000 7.12652 2
104 2022 REMOVING CONC (CURB AND GUTTER) LF     17,988.000 3.01437 3
104 2023 REMOVING CONC (CTB) LF     1,033.000 10.00000 1
104 2028 REMOVING CONC (MISC) SY 807.000 20.00000 949.000 20.00000 2
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     858.000 10.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     41.000 2.66000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     19,617.000 2.38000 1
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY 608.000 7.00000 9,193.000 11.01561 2
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     6,930.000 4.48000 1
105 2069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     6,851.000 3.88373 2
105 2108 RMV STAB BASE & ASPH PV (17") SY     3,745.000 6.53000 1
106 2001 OBLITERATING ABANDONED ROAD STA     5.000 1,500.00000 1
110 2001 EXCAVATION (ROADWAY) CY 4,631.000 15.52041 138,479.000 9.39498 9
110 2002 EXCAVATION (CHANNEL) CY     6,126.000 15.00000 1
112 2001 SUBGRADE WIDENING (ORD COMP) STA 45.110 50.00000 45.110 50.00000 1
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     5.000 100.00000 1
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     145.000 46.00000 1
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 4,102.000 14.92321 7,878.000 16.01545 6
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     2,005.000 30.00000 1
132 2007 EMBANKMENT (FINAL) (ORD COMP) (TY D) CY     128.000 15.00000 1
132 2008 EMBANKMENT (FINAL) (DENS CONT) (TY D) CY     41,577.000 4.65399 3
132 2019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     12,799.000 21.57919 10
134 2002 BACKFILL (TY B) STA 45.650 95.00000 888.650 97.68014 5
150 2002 BLADING HR     89.000 79.60674 5
158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR 4.000 190.00000 884.000 66.07919 9
158 2006 SPEC EXCAV WORK (VEHICLE) CY     290.000 8.00000 1
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY 10,332.000 2.11012 11,675.000 1.94452 5
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY     240,993.000 1.60091 3
161 2026 COMPOST MANUF TOPSOIL (BOS OR PB) (6") SY     9.000 100.00000 1
162 2002 BLOCK SODDING SY 1,543.000 3.09689 72,521.000 3.15431 14
164 2009 BROADCAST SEED (TEMP) (WARM) SY 9,751.000 .11394 34,326.000 .18214 8
164 2011 BROADCAST SEED (TEMP) (COOL) SY 9,751.000 .11394 18,353.000 .18793 6
164 2021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY 28,846.000 .26239 317,844.000 .28833 15
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     15,401.000 .31136 2
164 2025 CELL FBR MLCH SEED (PERM) (URBAN) (SANDY) SY     69,698.000 .22000 1
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY     132,351.000 .20101 5
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY     132,351.000 .20101 5
168 2001 VEGETATIVE WATERING MG 256.300 11.57710 5,300.100 12.21694 23
169 2002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 1,218.000 1.17438 2,248.000 1.09448 3
169 2004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY     11,234.000 1.75802 5
169 2006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY     5,293.000 1.10000 1