AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - LUFKIN DISTRICT

Last Update: Monday, September 15, 2014
ITEMS 100 2002 TO 169 2004
Items Items Bid Code Range
0100 - 0169
0204 - 0276
0305 - 0360
0400 - 0497
0500 - 0560
0610 - 0687
1122 - 1122
2115 - 2115
3150 - 3284
4430 - 4430
5369 - 5926
6007 - 6834
8020 - 8835
100 2002 - 169 2004
Item No Description Units August 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA     982.980 1,795.40299 12
100 2016 PREPARING ROW (TREE) (36" TO 48" DIA) EA     2.000 1,142.00000 1
104 2001 REMOVING CONC (PAV) SY     22,673.000 8.58706 4
104 2009 REMOVING CONC (RIPRAP) SY     97.000 16.76289 2
104 2011 REMOVING CONC (MEDIANS) SY     2,205.000 3.11156 2
104 2017 REMOVING CONC (DRIVEWAYS) SY     5,422.000 7.05229 6
104 2021 REMOVING CONC (CURB) LF     804.000 5.00000 1
104 2022 REMOVING CONC (CURB AND GUTTER) LF     15,781.000 1.76000 1
104 2028 REMOVING CONC (MISC) SY     142.000 20.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     41.000 2.66000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     19,617.000 2.38000 1
105 2019 REMOVING STAB BASE & ASPH PAV (14") SY     3,600.000 7.25000 1
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     6,930.000 4.48000 1
105 2069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     6,851.000 3.88373 2
105 2108 RMV STAB BASE & ASPH PV (17") SY     3,745.000 6.53000 1
106 2001 OBLITERATING ABANDONED ROAD STA     5.000 1,500.00000 1
110 2001 EXCAVATION (ROADWAY) CY     67,430.000 10.23368 7
112 2001 SUBGRADE WIDENING (ORD COMP) STA     933.850 91.98007 4
112 2002 SUBGRADE WIDENING (DENS CONT) STA     54.000 208.00000 1
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     2,505.000 8.18363 2
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     145.000 46.00000 1
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     4,771.000 14.01614 4
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     20,165.000 7.00000 1
132 2008 EMBANKMENT (FINAL) (DENS CONT) (TY D) CY     8,727.000 10.00000 1
132 2019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     15,386.000 19.22170 12
134 2002 BACKFILL (TY B) STA     2,243.440 62.27729 8
150 2001 BLADING STA     54.000 104.00000 1
150 2002 BLADING HR     40.000 85.00000 2
158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR     794.000 64.23174 7
158 2005 SPEC EXCAV WORK (ORIGINAL) CY     5,081.000 7.50846 2
158 2006 SPEC EXCAV WORK (VEHICLE) CY     290.000 8.00000 1
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     6,455.000 1.38598 4
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY     146,000.000 1.31015 2
161 2026 COMPOST MANUF TOPSOIL (BOS OR PB) (6") SY     9.000 100.00000 1
162 2002 BLOCK SODDING SY     59,598.000 3.04882 13
164 2009 BROADCAST SEED (TEMP) (WARM) SY     167,799.000 .10066 10
164 2011 BROADCAST SEED (TEMP) (COOL) SY     158,383.000 .09178 9
164 2021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     468,176.000 .25241 16
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     21,760.000 .23000 1
164 2025 CELL FBR MLCH SEED (PERM) (URBAN) (SANDY) SY     69,698.000 .22000 1
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY     186,350.000 .22930 4
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY     100,500.000 .23724 3
168 2001 VEGETATIVE WATERING MG     7,908.300 7.51828 22
169 2002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     21,342.000 .73668 3
169 2004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY     8,333.000 2.07707 5