AVERAGE LOW BID UNIT PRICE - MAINTENANCE - PARIS DISTRICT

Last Update: Monday, May 11, 2015
ITEMS 712 2002 TO 788 2003
Items Items Bid Code Range
0100 - 0168
0247 - 0260
0316 - 0354
0400 - 0496
0500 - 0560
0610 - 0672
0712 - 0788
1122 - 1122
3004 - 3267
4002 - 4002
6000 - 6834
7126 - 7224
8251 - 8251
712 2002 - 788 2003
Item No Description Units April 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2002 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LMI     858.000 600.00000 3
721 6001 FIBER REINFORCED PATCHING MATERIALS LB     4,486.000 14.56000 2
730 6002 FULL - WIDTH MOWING AC     64,912.000 24.09799 11
730 6003 SPOT MOWING AC     1,032.000 21.01357 8
734 6001 LITTER REMOVAL AC     22,682.000 11.28437 11
735 2068 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) CYC     312.000 136.16000 3
735 2069 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) CYC     312.000 136.16000 3
735 2070 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (3) CYC     312.000 136.16000 3
735 2088 DEBRIS - FRONTAGE ROADS - AREA (1) CYC     312.000 136.16000 3
735 2089 DEBRIS - FRONTAGE ROADS - AREA (2) CYC     312.000 136.16000 3
735 2090 DEBRIS - FRONTAGE ROADS - AREA (3) CYC     312.000 136.16000 3
735 2108 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (1) CYC     312.000 136.16000 3
735 2109 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (2) CYC     312.000 136.16000 3
735 2110 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (3) CYC     312.000 136.16000 3
735 6068 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) CYC     104.000 526.00000 1
735 6069 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) CYC     104.000 526.00000 1
735 6070 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (3) CYC     104.000 526.00000 1
735 6088 DEBRIS - FRONTAGE ROADS - AREA (1) CYC     104.000 250.00000 1
735 6089 DEBRIS - FRONTAGE ROADS - AREA (2) CYC     104.000 250.00000 1
735 6090 DEBRIS - FRONTAGE ROADS - AREA (3) CYC     104.000 250.00000 1
735 6108 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (1) CYC     104.000 97.00000 1
735 6109 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (2) CYC     104.000 97.00000 1
735 6110 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (3) CYC     104.000 97.00000 1
738 2001 CLEANING / SWEEPING (CENTER MEDIAN) CYC     44.000 675.00000 1
738 2003 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC     68.000 675.00000 1
738 2005 CLEANING / SWEEPING (FRONTAGE ROAD) CYC     32.000 675.00000 1
738 2007 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) CYC     36.000 675.00000 1
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     214.000 50.00000 1
738 2010 CLEANING / SWEEPING (SPOT) MI     70.000 20.00000 1
738 2011 CLEANING / SWEEPING (HANDWORK) SY     6,900.000 0.30000 1
745 2006 JANITORIAL MAINT (PICNIC AREAS) CYC     351.000 300.00000 3
745 2007 GROUNDS MAINT (MOWING / TRIMMING) CYC     48.000 225.00000 3
751 2006 MOWING, TRIMMING, AND EDGING (SITE A) CYC     48.000 300.00000 3
751 2016 MOWING, TRIMMING, AND EDGING (SITE B) CYC     24.000 300.00000 3
751 2024 LEAF REMOVAL CYC     6.000 325.00000 3
751 2025 LITTER PICKUP CYC     72.000 300.00000 3
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     525.000 1,683.42857 9
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     205.000 980.48780 9
752 2022 TREE REMOVAL (4" - 12" DIA) EA     11,350.000 35.29956 11
752 2023 TREE REMOVAL (12" - 18" DIA) EA     3,475.000 66.23741 10
752 2024 TREE REMOVAL (18" - 24" DIA) EA     2,280.000 87.91667 11
752 2025 TREE REMOVAL (24" - 30" DIA) EA     1,287.000 135.60606 11
752 2026 TREE REMOVAL (30" - 36" DIA) EA     365.000 243.28767 11
752 2027 TREE REMOVAL (36" - 42" DIA) EA     203.000 358.00493 11
752 2028 TREE REMOVAL (42" - 48" DIA) EA     198.000 366.28788 11
752 2029 TREE REMOVAL (48" - 60" DIA) EA     100.000 377.20000 8
752 2030 TREE REMOVAL (60" - 72" DIA) EA     41.000 281.00000 8
752 2045 STUMP REMOVAL EA     60.000 14.83333 6
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     95,000.000 1.63000 1
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF 178,380.000 1.37000 356,760.000 1.37000 2
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     10,500.000 10.43571 4
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     242.000 16.03306 4
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     146.000 18.02740 4
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     1,250.000 18.44000 4
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     50.000 1.00000 1
770 2006 REALIGN POSTS EA     800.000 4.50000 4
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     11.000 1.00000 4
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     15.000 1,745.00000 3
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     80.000 655.12500 4
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     7,500.000 20.57000 4
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     775.000 70.64516 4
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     23.000 1.00000 4
770 2022 REM & RESET SGT IMPACT HEAD EA     135.000 195.00000 3
770 2024 REPLACE SGT CABLE ANCHOR EA     48.000 1.00000 3
770 2026 REPLACE SGT STRUT EA     9.000 1.00000 3
770 2028 REPLACE HINGED TOP SGT STEEL POST EA     48.000 97.00000 3
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF     3,500.000 4.71429 4
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     234.000 7.30000 3
770 2038 INSTALL BLOCKOUTS (FURNISHED) EA     50.000 1.00000 1
770 2050 REM / REP TIM / STL POST W / O CONC FND (FURN EA     20.000 40.00000 1
774 2006 REPAIR (TRACC) EA     1.000 1,000.00000 1
774 2007 REPAIR (TRACC) LF     144.000 1.00000 3
774 2011 REPAIR (CATCB - FRNT SECT) EA     1.000 1,000.00000 1
774 2018 REPAIR (CATGR - FRONT SECTION) EA     1.000 1,000.00000 1
774 2019 REPAIR (CATGR - END SECTION) EA     1.000 200.00000 1
788 2002 CONCRETE BEAM REPAIR (CFRP) EA     13.000 8,100.00000 1
788 2003 CONCRETE BEAM REP (STRAND SPLICE & CFRP EA     3.000 13,200.00000 1