AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - WACO DISTRICT

Last Update: Friday, October 31, 2014
ITEMS 100 2001 TO 180 2001
Items Items Bid Code Range
0100 - 0180
0216 - 0292
0310 - 0360
0400 - 0497
0500 - 0560
0610 - 0690
0730 - 0752
1122 - 1122
2147 - 2147
3233 - 3271
5369 - 5997
6006 - 6834
8206 - 8999
100 2001 - 180 2001
Item No Description Units October 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     .500 25,000.00000 1
100 2002 PREPARING ROW STA     165.710 2,789.68831 8
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     10.000 800.00000 1
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     3.000 3,500.00000 1
100 2013 PREP ROW (TREE) (2" TO 12" DIA) EA     7.000 1,500.00000 1
104 2001 REMOVING CONC (PAV) SY     26,657.000 6.00000 1
104 2009 REMOVING CONC (RIPRAP) SY     1,748.000 16.90217 4
104 2011 REMOVING CONC (MEDIANS) SY     193.000 12.00000 1
104 2013 REMOVING CONC (FOUNDATIONS) SY     8.000 30.00000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY     1,171.000 9.25961 2
104 2021 REMOVING CONC (CURB) LF     600.000 5.00000 1
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     2,099.000 5.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     122.000 12.00000 1
104 2054 REMOVING CONCRETE (MOW STRIP) LF     531.000 10.00000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     1,625.000 5.00000 1
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     2,272.000 4.99384 2
105 2057 REMOVE STAB BS & ASPH PAV (5" - 10") SY     4,472.000 6.00000 1
105 2058 REMOVING STAB BASE & ASPH PAV (10" - 12" SY     6,020.000 2.50000 1
105 2063 REMOVE STAB BASE AND ASPH PAV (1" - 3") SY     3,873.000 2.00000 1
110 2001 EXCAVATION (ROADWAY) CY     99,598.000 6.07868 16
110 2002 EXCAVATION (CHANNEL) CY     7,638.000 7.96910 7
110 2003 EXCAVATION (SPECIAL) CY     23,104.000 5.11621 2
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     2,305.000 6.19957 3
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     100,395.000 7.25598 13
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     244,476.000 8.00266 2
132 2020 EMBANKMENT (VEHICLE) (DENS CONT) (TY B) CY     62,458.000 .56404 2
134 2001 BACKFILL (TY A) STA     674.000 57.78932 2
134 2004 BACKFILL (TY A OR B) STA     509.000 100.00000 1
152 2003 ROAD GRADER WORK (DENS CONT) STA     1,034.500 529.40068 2
158 2005 SPEC EXCAV WORK (ORIGINAL) CY     410.000 20.00000 1
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     211,373.000 1.05093 7
160 2006 FURNISHING AND PLACING TOPSOIL (3") SY     387,222.000 .25000 1
162 2002 BLOCK SODDING SY     51,283.000 2.59425 3
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     169.000 2.00000 1
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY     6,953.000 .35463 2
164 2007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY     7,497.000 .15000 1
164 2009 BROADCAST SEED (TEMP) (WARM) SY     11,362.000 .27415 5
164 2011 BROADCAST SEED (TEMP) (COOL) SY     11,193.000 .24809 4
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     620,918.000 .05000 1
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     545,637.000 .09089 10
164 2036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC     54.450 372.71809 3
164 2039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY     75,408.000 .11052 2
164 2041 DRILL SEEDING (TEMP) (WARM) SY     625,481.000 .06908 13
164 2042 DRILL SEEDING (TEMP) (WARM) AC     27.730 297.57483 3
164 2043 DRILL SEEDING (TEMP) (COOL) SY     625,481.000 .06922 13
164 2044 DRILL SEEDING (TEMP) (COOL) AC     27.730 315.56617 3
168 2001 VEGETATIVE WATERING MG     25,252.000 4.03219 20
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     17,763.000 1.05881 4
169 2002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     600.000 3.10000 1
169 2003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     93,814.000 1.05037 9
169 2004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY     1,508.000 1.54775 2
169 2006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY     300.000 6.00000 1
180 2001 WILDFLOWER SEEDING AC     16.430 1,301.01948 1