AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - WACO DISTRICT

Last Update: Wednesday, July 2, 2014
ITEMS 500 2001 TO 560 2022
Items Items Bid Code Range
0100 - 0180
0216 - 0292
0310 - 0360
0400 - 0497
0500 - 0560
0610 - 0690
0730 - 0738
1122 - 1122
3233 - 3271
4013 - 4013
5369 - 5997
6055 - 6834
8020 - 8999
500 2001 - 560 2022
Item No Description Units June 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 5.000 206,000.00000 21.000 368,008.77571 21
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 46.000 2,936.95652 195.000 5,047.02564 21
508 2002 CONSTRUCTING DETOURS SY 1,781.000 35.00000 5,593.000 52.38977 3
512 2011 PORT CTB (DES SOURCE) (SAFETY SH) (TY 2) LF     840.000 12.00000 1
512 2013 PORT CTB (DES SOURCE) (SNGL SLP) (TY 1) LF     3,120.000 12.07500 2
512 2014 PORT CTB (DES SOURCE) (SNGL SLP) (TY 2) LF     1,590.000 7.90000 1
512 2017 PORT CTB (DES SOURCE) (LOW PROF) (TY 1) LF 1,360.000 14.23529 3,620.000 11.40387 3
512 2018 PORT CTB (DES SOURCE) (LOW PROF) (TY 2) LF 160.000 17.50000 340.000 15.40882 3
512 2020 PORT CTB (MOVE) (SAFETY SH) (TY 2) LF     5,880.000 5.00000 1
512 2022 PORT CTB (MOVE) (SNGL SLP) (TY 1) LF     1,670.000 5.30000 1
512 2023 PORT CTB (MOVE) (SNGL SLP) (TY 2) LF     1,090.000 7.45000 1
512 2026 PORT CTB (MOVE) (LOW PROF) (TY 1) LF 1,060.000 11.67925 1,820.000 10.01758 3
512 2027 PORT CTB (MOVE) (LOW PROF) (TY 2) LF 160.000 11.50000 220.000 12.91818 3
512 2029 PORT CTB (STKPL) (SAFETY SH) (TY 2) LF     840.000 12.00000 1
512 2031 PORT CTB (STKPL) (SNGL SLP) (TY 1) LF     3,120.000 11.28750 2
512 2032 PORT CTB (STKPL) (SNGL SLP) (TY 2) LF     1,590.000 7.65000 1
512 2035 PORT CTB (STKPL) (LOW PROF) (TY 1) LF 1,360.000 11.54412 3,620.000 9.23785 3
512 2036 PORT CTB (STKPL) (LOW PROF) (TY 2) LF 160.000 12.50000 340.000 12.07647 3
528 2004 LANDSCAPE PAVERS SY 441.000 73.75283 2,767.000 59.75410 3
529 2001 CONC CURB (TY I) LF 37.000 55.00000 37.000 55.00000 1
529 2004 CONC CURB & GUTTER (TY II) LF 860.000 35.00000 860.000 35.00000 1
529 2006 CONC CURB (MONO) (TY II) LF     19,889.000 1.28000 1
529 2009 CONCRETE CURB (SPECIAL) LF 1,344.000 34.00000 1,344.000 34.00000 1
529 2010 CONC CURB AND GUTTER (TY II) (REINF) LF 3,172.000 15.00000 5,646.000 14.56181 2
529 2021 CONC CURB (DOWEL) (REINF) (TY II) LF 1,563.000 12.00000 1,563.000 12.00000 1
529 2026 CONC CURB (ARMOR CURB SLOT) LF 65.000 210.00000 65.000 210.00000 1
529 2061 CONC CURB (TY C1) LF 90.000 70.00000 90.000 70.00000 1
529 2095 CONC CURB (MONO) (TY II) (DOWEL) (SAWTOOTH LF 27.000 40.00000 27.000 40.00000 1
530 2005 INTERSECTIONS (ACP) SY     5,430.000 14.02413 3
530 2006 INTERSECTIONS (SURF TREAT) SY     3,975.000 17.22819 3
530 2010 DRIVEWAYS (CONC) SY 3,060.000 50.97647 5,314.000 58.02673 6
530 2011 DRIVEWAYS (ACP) SY 281.000 45.00000 37,681.000 14.95216 5
530 2012 DRIVEWAYS (SURF TREAT) SY 57.000 45.00000 23,793.000 14.88384 4
530 2014 TURNOUTS (ACP) EA 14.000 900.00000 28.000 700.00000 2
530 2015 TURNOUTS (SURF TREAT) EA     78.000 473.46154 2
530 2017 TURNOUTS (ACP) SY     273.000 15.09524 2
530 2018 TURNOUTS (SURF TREAT) SY     1,200.000 20.00000 1
530 2038 DRIVEWAYS (CONC) (HES) SY 223.000 90.00000 223.000 90.00000 1
531 2004 CONC SIDEWALKS (6") SY 8.000 80.00000 8.000 80.00000 1
531 2005 CURB RAMPS (TY 1) EA 69.000 1,300.00000 77.000 1,287.47948 2
531 2006 CURB RAMPS (TY 2) EA 21.000 1,376.19048 21.000 1,376.19048 2
531 2007 CURB RAMPS (TY 3) EA 58.000 1,300.00000 58.000 1,300.00000 1
531 2008 CURB RAMPS (TY 4) EA     5.000 1,333.33000 1
531 2009 CURB RAMPS (TY 6) EA 119.000 1,300.00000 119.000 1,300.00000 1
531 2010 CURB RAMPS (TY 7) EA 239.000 1,300.00000 239.000 1,300.00000 1
531 2014 CURB RAMPS (TY 22) EA 8.000 1,783.75000 8.000 1,783.75000 2
531 2015 CONC SIDEWALKS (4") SY 7,960.000 62.75817 13,236.000 52.86939 3
531 2017 CURB RAMPS (TY 21) EA 8.000 2,247.50000 9.000 2,243.81778 3
531 2028 CONC SIDEWALK (5') (5") LF     161.000 55.00000 1
531 2038 CONC SIDEWALKS (STEPS) SY 80.000 120.00000 80.000 120.00000 1
531 2041 CURB RAMPS (TY 10) EA 15.000 1,300.00000 15.000 1,300.00000 1
531 2044 CURB RAMPS (TY 10) EA     8.000 1,435.90000 1
531 2076 CONC SIDEWALK (5') (1'3") (BRIDGE) LF 70.000 300.00000 70.000 300.00000 1
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF 2,825.000 20.21805 13,645.000 19.18497 12
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 35.000 1,282.34286 70.000 1,377.21586 6
540 2014 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     335.000 43.13433 2
540 2019 MTL BEAM GD FEN TRANS (THRIE) (STL POST EA     36.000 1,624.44444 3
540 2020 MTL BEAM GD FEN TRANS (TL2) (STL POST) EA     10.000 723.00000 2
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     10.000 892.00000 2
540 2045 MTL BM GD FEN (LONG SPAN SYSTEM) LF     100.000 20.00000 1
540 2046 MTL BM GD FEN TRANS (NON - SYM) EA     10.000 562.00000 2
542 2001 REMOVING METAL BEAM GUARD FENCE LF 3,629.000 1.28000 14,748.000 1.90133 8
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     17.000 141.68529 2
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA     16.000 185.00000 2
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     11.000 2,255.94364 2
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA 34.000 256.00000 130.000 248.61938 6
544 2013 GDRAIL END TRT (INSTALL) (HBA POST) EA 35.000 2,237.94286 153.000 1,960.29699 10
545 2001 CRASH CUSH ATTEN (INSTL) EA 1.000 11,650.00000 4.000 5,027.88250 2
545 2002 CRASH CUSH ATTEN (MOVE & RESET) EA     21.000 1,821.97762 3
545 2003 CRASH CUSH ATTEN (REMOVE) EA     7.000 1,087.91143 3
545 2049 CRASH CUSH ATTEN (INSTL) (WORK ZONE) EA     2.000 12,230.77000 1
545 2050 CRASH CUSH ATTEN (MOV & RESET) (WORK ZONE) EA     2.000 1,230.77000 1
545 2051 CRASH CUSH ATTEN (REMOVE) (WORK ZONE) EA     2.000 769.23000 1
552 2003 WIRE FENCE (TY C) LF     2,836.000 9.73738 4
556 2008 PIPE UNDERDRAINS (TY 8) (6") LF     31,860.000 11.75706 2
556 2011 PIPE UNDERDRAINS (TY 6) (4") LF     7,459.000 12.50000 1
560 2004 MAILBOX INSTALL - S (WC - POST) TY 3 FND EA 25.000 187.00000 125.000 154.07200 5
560 2005 MAILBOX INSTALL - D (WC - POST) TY 3 FND EA     9.000 166.66667 3
560 2006 MAILBOX INSTALL - S (RR - POST) TY 4 FND - T EA     64.000 178.93750 2
560 2007 MAILBOX INSTALL - D (TWW - POST) TY 4 FND - T EA     7.000 217.00000 1
560 2008 MAILBOX INSTALL - M (TWW - POST) TY 4 FND - T EA     6.000 502.50000 2
560 2009 MAILBOX INSTALL - M (TWG - POST) TY 1 FND EA     1.000 582.00000 1
560 2020 MAILBOX INSTALL - M (WC - POST) TY 3FND - AB EA     2.000 600.00000 1
560 2021 MAILBOX INSTALL - S (TWG - POST) TY 2 FND - TB EA     33.000 125.00000 1
560 2022 MAILBOX INSTALL - D (TWG - POST) TY 2 FND - TB EA     5.000 150.00000 1