Monthly State Let Construction Report For Wichita Falls District As Of May 10, 2016 Page 2 Of 3

Last Update: Tuesday, May 10, 2016
FTP Icon
page 1 | page 2 | page 3

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyARCHER
Highway US 82 ETC
From 1.69 MI W OF FM 368
To 0.795 MI E OF FERGUSON ROAD
CSJ 0156-05-056
Proj ID NH 2016(379)
Work Type OVERLAY
 
20.416 4811525.75 0.00 0.00 0.0
Work Order 03-15-16
Work Began 00-00-00
Work Completed  
Time Computed 04-01-16
Contract Working Days 80
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ZACK BURKETT CO.
SUBCONTRACTOR(S) FOR CCSJ: 0156-05-056
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 01163226
Totals 4811525.75 0.00 0.00 0.0

CountyCOOKE
Highway IH 35 ETC
From ON IH 35
To AT FM 51 (NB & SB)
CSJ 0195-01-099
Proj ID NH 1502(347)
Work Type MISCELLANEOUS
 
1.039 2144827.68 182884.00 733711.72 34.2
Work Order 11-10-15
Work Began 01-25-16
Work Completed  
Time Computed 11-10-15
Contract Working Days 200
Addl Days Granted 0
Working Days Charged 55
Percent Time Used 27
Contractor(s)
SCR CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0195-01-099
ALTUS TRAFFIC MANAGEMENT LLC (0.78%)
EROSION CONTROL MANAGEMENT SERVICES(0.22%)
STRIPING TECHNOLOGY, L.P.(4.11%)
S & S BRIDGE PAINTING, INC.(9.11%)
HJC FARMS, INC.( 18.98%)
TEXAS CUTTING & CORING, INC. (1.37%)
Contract # 06153016
Totals 2144827.68 182884.00 733711.72 34.2

CountyCLAY
Highway US 287
From NEAR LONE STAR ROAD
To APPROX. 0.5 MI S OF HAPGOOD LN
CSJ 0224-02-043
Proj ID SFT 224-2-43
Work Type HAZARD ELIMINATION SAFETY
 
0.923 612771.50 9162.80 596097.72 99.9
Work Order 11-12-14
Work Began 04-29-15
Work Completed  
Time Computed 11-28-14
Contract Working Days 51
Addl Days Granted 0
Working Days Charged 84
Percent Time Used 164
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0224-02-043
TOTAL HIGHWAY MAINTENANCE, LLC (3.14%)
ZACK BURKETT CO. ( 38.56%)
Contract # 10143229
Totals 612771.50 9162.80 596097.72 99.9

CountyWICHITA
Highway US 281 ETC
From 0.1 MI W OF WINDTHORST RD
To US 281 CONNECTOR
CSJ 0249-01-045
Proj ID NH 2016(381)
Work Type OVERLAY
 
10.480 2947967.38 0.00 0.00 0.0
Work Order 03-02-16
Work Began 00-00-00
Work Completed  
Time Computed 04-01-16
Contract Working Days 59
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ZACK BURKETT CO.
SUBCONTRACTOR(S) FOR CCSJ: 0249-01-045
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 01163008
Totals 2947967.38 0.00 0.00 0.0

CountyARCHER
Highway US 281
From SH 25
To JACK COUNTY LINE
CSJ 0249-04-039
Proj ID STP 2013(624)
Work Type REHABLIITAITION OF EXISTING ROAD
 
8.737 10168493.22 7993.14 2457890.53 24.1
Work Order 05-08-15
Work Began 07-13-15
Work Completed  
Time Computed 05-24-15
Contract Working Days 345
Addl Days Granted 0
Working Days Charged 112
Percent Time Used 32
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0249-04-039
W.S. CONSTRUCTION COMPANY(6.30%)
CROSSROADS, L.P. (0.23%)
STRIPING TECHNOLOGY, L.P.(1.55%)
DUSTROL, INC.(2.47%)
WOLFE CONSTRUCTION GROUP, INC. (0.85%)
MARCOM"S MOWING SERVICE, LLC (0.35%)
WEST TEXAS RUMBLE STRIP(0.08%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (3.30%)
Contract # 03153034
Totals 10168493.22 7993.14 2457890.53 24.1

CountyCOOKE
Highway FM 51
From NEAR IH 35 FRONTAGE ROAD
To FM 1306
CSJ 0312-01-077
Proj ID STP 2016(383)
Work Type OVERLAY
 
1.255 565293.98 265710.08 480146.00 84.9
Work Order 01-29-16
Work Began 03-22-16
Work Completed  
Time Computed 02-28-16
Contract Working Days 41
Addl Days Granted 0
Working Days Charged 14
Percent Time Used 34
Contractor(s)
THE LANE CONSTRUCTION CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 0312-01-077
CROSSROADS, L.P. (1.05%)
WOLFE CONSTRUCTION GROUP, INC. (0.69%)
TOTAL HIGHWAY MAINTENANCE, LLC (5.16%)
DUSTROL, INC.(8.11%)
Contract # 12153213
Totals 565293.98 265710.08 480146.00 84.9

CountyCLAY
Highway SH 148
From NEAR US 287
To NEAR ANGLE LANE
CSJ 0391-04-024
Proj ID STP 1502(096)
Work Type REHABILITATION OF EXISTING ROAD
 
4.689 2379349.36 43537.48 1690908.31 71.0
Work Order 06-30-15
Work Began 08-07-15
Work Completed  
Time Computed 07-31-15
Contract Working Days 134
Addl Days Granted 24
Working Days Charged 143
Percent Time Used 90
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0391-04-024
TRANSPORT TRUST(5.80%)
ALTUS TRAFFIC MANAGEMENT LLC (0.35%)
WOLFE CONSTRUCTION GROUP, INC. (1.22%)
W.S. CONSTRUCTION COMPANY( 21.50%)
HJC FARMS, INC.(0.60%)
DUSTROL, INC.(1.29%)
TRP CONSTRUCTION GROUP, LLC(1.16%)
BEAN ELECTRICAL, INC.(3.22%)
C & S UTILITY CONTRACTORS, INC.(1.07%)
Contract # 05153013
Totals 2379349.36 43537.48 1690908.31 71.0

CountyYOUNG
Highway FM 61
From US 380
To FM 3003
CSJ 0529-01-023
Proj ID STP 1602(001)
Work Type OVERLAY
 
8.797 4288948.68 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 186
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0529-01-023
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04163003
Totals 4288948.68 0.00 0.00 0.0

CountyWICHITA
Highway SH 258
From 0.2 MILES WEST OF FM 2226
To US 82
CSJ 0544-01-020
Proj ID STP 2013(903)HES
Work Type REHABILITATION OF EXISTING ROAD
 
7.000 3882193.04 -2520.70 3886288.43 99.9
CountyWICHITA
Highway SH 258
From SH 25
To 0.2 MILES WEST OF FM 2226
CSJ 0544-01-021
Proj ID STP 2013(904)
Work Type REHABILITATION OF EXISTING ROAD
 
3.353 1941339.06 30359.20 1951528.85 99.9
Work Order 12-19-13
Work Began 03-06-14
Work Completed  
Time Computed 02-17-14
Contract Working Days 150
Addl Days Granted 23
Working Days Charged 359
Percent Time Used 207
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0544-01-020
ALTUS TRAFFIC MANAGEMENT LLC (0.48%)
ZACK BURKETT CO. ( 42.92%)
FLAT LINE, INC.(0.83%)
J.V. CONCRETE CONSTRUCTION ( 15.86%)
MARCOM"S MOWING SERVICE, LLC (2.95%)
LONE STAR HIGHWAY PRODUCTS, INC. (0.00%)
W.S. CONSTRUCTION COMPANY(4.69%)
Contract # 09133206
Totals 5823532.10 27838.50 5837817.28 99.9

CountyWICHITA
Highway FM 171
From FM 890
To CLAY COUNTY LINE
CSJ 0681-01-021
Proj ID STP 2015(875)HES
Work Type REHABILITATION OF EXISTING ROADWAY
 
6.577 4534926.90 1186471.29 3608069.80 79.5
Work Order 06-01-15
Work Began 07-07-15
Work Completed  
Time Computed 07-02-15
Contract Working Days 170
Addl Days Granted 0
Working Days Charged 167
Percent Time Used 98
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0681-01-021
ALTUS TRAFFIC MANAGEMENT LLC (0.22%)
ZACH BURKETT CO. ( 27.96%)
W.S. CONSTRUCTION COMPANY( 28.48%)
BARRICADES UNLIMITED (1.45%)
MARCOM"S MOWING SERVICE, LLC (0.40%)
JE CASEY, LLC(1.96%)
Contract # 04153244
Totals 4534926.90 1186471.29 3608069.80 79.5

CountyWILBARGER
Highway FM 91
From FM 91 AT WANDERERS CREEK
To .
CSJ 0702-01-014
Proj ID BR 2016(928)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.767 2458571.50 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 187
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
EARTH BUILDERS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0702-01-014
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04163019
Totals 2458571.50 0.00 0.00 0.0

CountyCOOKE
Highway FM 678
From FM 3092
To FM 3164
CSJ 0782-01-033
Proj ID STP 1502(097)
Work Type REHABILITATION OF EXISTING ROADWAY
 
9.586 3375961.86 325662.57 1533569.72 45.4
Work Order 07-06-15
Work Began 01-25-16
Work Completed  
Time Computed 08-06-15
Contract Working Days 162
Addl Days Granted 0
Working Days Charged 44
Percent Time Used 27
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0782-01-033
TOTAL HIGHWAY MAINTENANCE, LLC (1.13%)
VENUS CONSTRUCTION ( 24.18%)
ALTUS TRAFFIC MANAGEMENT LLC (0.26%)
HJC FARMS, INC.(0.88%)
RAMBO CONTRACTING, INC.(4.48%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.59%)
HAYWARD BAKER, INC.(2.17%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(6.91%)
Contract # 05153014
Totals 3375961.86 325662.57 1533569.72 45.4

CountyWICHITA
Highway FM 369
From AT FAIRWAY INT, NEAR HUGHES ST
To NEAR MCNIEL AVE
CSJ 0802-02-052
Proj ID STP 2013(622)
Work Type MISCELLANEOUS WORK
 
0.331 1792483.50 397203.00 666139.00 37.1
Work Order 07-24-15
Work Began 03-14-16
Work Completed  
Time Computed 08-23-15
Contract Working Days 202
Addl Days Granted 0
Working Days Charged 34
Percent Time Used 16
Contractor(s)
NORTH TEXAS CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0802-02-052
ALTUS TRAFFIC MANAGEMENT LLC (0.41%)
OSCAR ORDUNO, INC. (2.96%)
PEACHTREE CONSTRUCTION, LTD. (4.50%)
J. E. GUZMAN CONSTRUCTION, INC.(3.90%)
WOLFE CONSTRUCTION GROUP, INC. (0.29%)
Contract # 05153250
Totals 1792483.50 397203.00 666139.00 37.1

CountyCOOKE
Highway FM 373
From AT DRY ELM CREEK
To .
CSJ 0823-01-031
Proj ID BR 2015(601)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.241 1612050.20 254789.90 1449384.70 89.9
Work Order 04-02-15
Work Began 06-09-15
Work Completed  
Time Computed 04-18-15
Contract Working Days 238
Addl Days Granted 0
Working Days Charged 224
Percent Time Used 94
Contractor(s)
HODGES AND SON CONSTRUCTION COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0823-01-031
N-LINE TRAFFIC MAINTENANCE, L.P. (2.33%)
STRIPING TECHNOLOGY, L.P.(1.55%)
MORRIS COUNTY CONTRACTORS, L.L.C.(6.69%)
PENHALL COMPANY(0.19%)
PEACHTREE CONSTRUCTION, LTD. ( 12.29%)
TEXAS ALTERNATIVE GRASSER, INC.(0.35%)
DUSTROL, INC.(0.47%)
Contract # 02153003
Totals 1612050.20 254789.90 1449384.70 89.9

CountyCLAY
Highway FM 172
From 3.181 MI W OF FM 1883
To 3.876 MI E OF FM 1883
CSJ 0824-03-016
Proj ID STP 1502(099)HES
Work Type HAZARD ELIMINATION SAFETY
 
7.112 1215642.62 19672.00 1160969.54 95.5
Work Order 06-30-15
Work Began 08-17-15
Work Completed  
Time Computed 07-31-15
Contract Working Days 84
Addl Days Granted 7
Working Days Charged 87
Percent Time Used 95
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0824-03-016
WOLFE CONSTRUCTION GROUP, INC. (1.10%)
ALTUS TRAFFIC MANAGEMENT LLC (0.36%)
TRANSPORT TRUST(2.42%)
MARCOM"S MOWING SERVICE, LLC (0.70%)
TRP CONSTRUCTION GROUP, LLC(2.15%)
W.S. CONSTRUCTION COMPANY(6.04%)
THE LANE CONSTRUCTION CORPORATION( 19.65%)
AAJ CONCRETE CONSTRUCTION(0.52%)
Contract # 05153212
Totals 1215642.62 19672.00 1160969.54 95.5

CountyCOOKE
Highway FM 922
From MONTAGUE COUNTY LINE
To FM 373
CSJ 0845-03-056
Proj ID STP 2014(357)
Work Type RESTORATION
 
13.082 4230047.49 186368.78 2354130.59 55.6
Work Order 04-15-14
Work Began 10-21-14
Work Completed  
Time Computed 06-14-14
Contract Working Days 213
Addl Days Granted 8
Working Days Charged 189
Percent Time Used 85
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0845-03-056
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.84%)
ALTUS TRAFFIC MANAGEMENT LLC (0.33%)
J.V. CONCRETE CONSTRUCTION (6.52%)
LONE STAR BARRIER SERVICES, LLC(3.84%)
MARCOM"S MOWING SERVICE, LLC (1.06%)
TOTAL HIGHWAY MAINTENANCE, LLC (2.42%)
STORM WATER MANAGEMENT, INC. (0.96%)
MIKE ALBERT, INC.(3.19%)
Contract # 02143007
Totals 4230047.49 186368.78 2354130.59 55.6

CountyCOOKE
Highway FM 922
From AT FM 51
To .
CSJ 0845-03-060
Proj ID STP 2016(847)
Work Type REHABILITATION OF EXISTING ROAD
 
0.248 332007.54 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-07-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 54
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0845-03-060
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03163209
Totals 332007.54 0.00 0.00 0.0

CountyWICHITA
Highway VA
From VARIOUS LOCATIONS DISTRICT WIDE
To .
CSJ 0903-00-072
Proj ID STP 2014(086)
Work Type MISCELLANEOUS WORK
 
1.000 399924.61 0.00 483002.90 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-15-14
Work Began 08-25-14
Work Completed 02-17-16
Time Computed 07-14-14
Contract Working Days 50
Addl Days Granted 37
Working Days Charged 87
Percent Time Used 100
Contractor(s)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0903-00-072
ALTUS TRAFFIC MANAGEMENT LLC (2.07%)
Contract # 03143032
Totals 399924.61 0.00 483002.90 100.0

CountyWICHITA
Highway VA
From VARIOUS LOCATIONS DISTRICT WIDE
To .
CSJ 0903-00-073
Proj ID STP 2015(753)
Work Type SIGN UPGRADE
 
1.000 574221.00 85945.37 547145.95 95.4
Work Order 04-28-15
Work Began 08-17-15
Work Completed  
Time Computed 05-29-15
Contract Working Days 59
Addl Days Granted 0
Working Days Charged 61
Percent Time Used 103
Contractor(s)
MIDASCO, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0903-00-073
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03153029
Totals 574221.00 85945.37 547145.95 95.4

CountyWICHITA
Highway VA
From AT VARIOUS LOCATIONS IN WICHITA
To FALLS DISTRICT
CSJ 0903-00-075
Proj ID NH 2015(078)
Work Type CONSTRUCT ADA CURB RAMPS
 
0.001 3132333.32 0.00 2926985.76 94.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-03-14
Work Began 01-07-15
Work Completed  
Time Computed 11-19-14
Contract Working Days 223
Addl Days Granted 0
Working Days Charged 248
Percent Time Used 111
Contractor(s)
TI-ZACK CONCRETE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0903-00-075
W.S. CONSTRUCTION COMPANY(7.60%)
MELS ELECTRIC, L.P.(5.66%)
STRIPING TECHNOLOGY, L.P.(0.74%)
BTA SERVICES, LTD. (1.00%)
Contract # 09143037
Totals 3132333.32 0.00 2926985.76 94.2

page 1 | page 2 | page 3