AVERAGE LOW BID UNIT PRICE - MAINTENANCE - YOAKUM DISTRICT

Last Update: Friday, October 3, 2014
ITEMS 712 2004 TO 776 2025
Items Items Bid Code Range
0100 - 0168
0247 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0618 - 0687
0712 - 0776
1122 - 1122
3224 - 3268
4116 - 4116
5367 - 5369
6266 - 6834
7224 - 7634
8020 - 8987
712 2004 - 776 2025
Item No Description Units Septembe 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2004 JT / CRCK SEAL (RUBBER - ASPHALT) LF     7,745.000 1.47000 1
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     3,271.960 423.31639 7
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     105.000 1,500.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA     85.000 120.00000 1
752 2023 TREE REMOVAL (12" - 18" DIA) EA     85.000 235.00000 1
752 2024 TREE REMOVAL (18" - 24" DIA) EA     49.000 365.00000 1
752 2025 TREE REMOVAL (24" - 30" DIA) EA     13.000 425.00000 1
752 2026 TREE REMOVAL (30" - 36" DIA) EA     2.000 650.00000 1
752 2027 TREE REMOVAL (36" - 42" DIA) EA     3.000 750.00000 1
752 2028 TREE REMOVAL (42" - 48" DIA) EA     2.000 1,050.00000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF 2,000.000 16.00000 9,500.000 13.89474 5
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 50.000 20.00000 210.000 14.01190 5
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF 75.000 20.00000 210.000 14.99405 6
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA 2,200.000 40.00000 4,150.000 32.60241 6
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA 90.000 20.00000 135.000 17.68333 6
770 2006 REALIGN POSTS EA 300.000 11.66667 900.000 6.91389 6
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA 22.000 2,009.09091 84.000 1,793.15476 6
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 30.000 600.00000 70.000 595.28571 6
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 1,750.000 16.85714 3,650.000 15.95890 6
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA 150.000 125.00000 400.000 66.00000 6
770 2022 REM & RESET SGT IMPACT HEAD EA 30.000 83.33333 100.000 75.60000 6
770 2023 REPLACE SGT OBJECT MARKER EA 25.000 4.80000 60.000 2.63333 6
770 2024 REPLACE SGT CABLE ANCHOR EA 20.000 5.75000 45.000 3.15556 5
770 2025 REPLACE SGT CABLE ASSEMBLY EA 20.000 5.75000 45.000 3.15556 5
770 2026 REPLACE SGT STRUT EA 10.000 10.50000 25.000 4.85000 5
770 2027 REMOVE & REPLACE BLOCKOUT EA 300.000 8.00000 450.000 5.66667 3
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF 400.000 15.75000 1,000.000 12.20000 5
774 2005 RMV / REPL (VIA - SAND FILL PLASTIC BARRELS EA 30.000 300.00000 100.000 210.55000 6
776 2011 REP METAL POST W / BASE PLATE (T101 RAIL EA 10.000 125.00000 30.000 49.70000 6
776 2020 REPAIR (TY T101RC) LF 75.000 20.00000 200.000 11.23125 5
776 2021 REPAIR (TY T1 - 101R) LF 75.000 20.00000 200.000 11.23125 5
776 2024 REP MTL PST W / BASE PLATE (TY T101RC) EA 10.000 100.00000 30.000 51.00000 6
776 2025 REP MTL PST W / BASE PLATE (TY T1 - 101R) EA 10.000 100.00000 30.000 51.00000 6