Detail Letting Schedule for Uvalde County (FY 2013)
Uvalde County (FY 2013) |
CCSJ: 0023-05-083 | |||
District: | San Antonio | Let Date: | AUG 2013 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CRX 23-5-83 | CSJ: | 0023-05-083 |
Description: | REPLACE CROSSING SURFACE AT RAILROAD CROSSING | Handling Code: |
XX |
Limits From: | US 90 | Fund Cat: | 10 |
Limits To: | AT UPRR (DOT 742855X) | Estimate: | $48,128 |
Length: | 0.1 Miles | Actual: | $48,128 |
Back... |
Totals for 0023-05-083 | ||
---|---|---|---|
Length: | 0.1 Miles | ||
Estimate: | $48,128 | ||
Actual: | $48,128 | ||
CCSJ: 0235-05-030 | |||
District: | San Antonio | Let Date: | JUL 2013 |
Highway: | SH 55 | Let Status: | Actual |
Project ID: | C 235-5-30 | CSJ: | 0235-05-030 |
Description: | RECONSTRUCT ROADWAY TO IMPROVE DRAINAGE AND OPERATIONAL | Handling Code: |
|
Limits From: | 1.25 MI W OF US 83 | Fund Cat: | 3 |
Limits To: | US 83 | Estimate: | $2,455,613 |
Length: | 1.3 Miles | Actual: | $2,921,845 |
District: | San Antonio | Let Date: | JUL 2013 |
Highway: | SH 55 | Let Status: | Actual |
Project ID: | RW 235-5-033 | CSJ: | 0235-05-033 |
Description: | RIGHT OF WAY UTILITIES ADJUSTMENTS | Handling Code: |
|
Limits From: | 1.25 MI W OF US 83 | Fund Cat: | ROW |
Limits To: | US 83 | Estimate: | |
Length: | 1.3 Miles | Actual: | $38,957 |
Back... |
Totals for 0235-05-030 | ||
Length: | 2.6 Miles | ||
Estimate: | $2,455,613 | ||
Actual: | $2,960,802 | ||
CCSJ: 0915-20-016 | |||
District: | San Antonio | Let Date: | AUG 2013 |
Highway: | CR | Let Status: | Actual |
Project ID: | STP 2013(369)FRS | CSJ: | 0915-20-016 |
Description: | INSTALL RAILROAD WARNING SIGNS AND PAVEMENT MARKINGS TO | Handling Code: |
XX |
Limits From: | CR 344 | Fund Cat: | 8 |
Limits To: | AT UPRR DOT 742825F | Estimate: | $215,772 |
Length: | 0.0 Miles | Actual: | $150,000 |
Back... |
Totals for 0915-20-016 | ||
Length: | 0.0 Miles | ||
Estimate: | $215,772 | ||
Actual: | $150,000 |
|