Detail Letting Schedule for Uvalde County (FY 2013)

Last Update: Thursday, November 14, 2013
Uvalde County (FY 2013)

CCSJ: 0023-05-083

District: San Antonio Let Date: AUG 2013
Highway: US 90 Let Status: Actual
Project ID: CRX 23-5-83 CSJ: 0023-05-083
Description: REPLACE CROSSING SURFACE AT RAILROAD CROSSING Handling
Code:
XX
Limits From: US 90 Fund Cat: 10
Limits To: AT UPRR (DOT 742855X) Estimate: $48,128
Length: 0.1 Miles Actual: $48,128
 
Back...

Totals for 0023-05-083
Length: 0.1 Miles
Estimate: $48,128
Actual: $48,128

CCSJ: 0235-05-030

District: San Antonio Let Date: JUL 2013
Highway: SH 55 Let Status: Actual
Project ID: C 235-5-30 CSJ: 0235-05-030
Description: RECONSTRUCT ROADWAY TO IMPROVE DRAINAGE AND OPERATIONAL Handling
Code:
 
Limits From: 1.25 MI W OF US 83 Fund Cat: 3
Limits To: US 83 Estimate: $2,455,613
Length: 1.3 Miles Actual: $2,921,845
 
District: San Antonio Let Date: JUL 2013
Highway: SH 55 Let Status: Actual
Project ID: RW 235-5-033 CSJ: 0235-05-033
Description: RIGHT OF WAY UTILITIES ADJUSTMENTS Handling
Code:
 
Limits From: 1.25 MI W OF US 83 Fund Cat: ROW
Limits To: US 83 Estimate:  
Length: 1.3 Miles Actual: $38,957
 
Back...

Totals for 0235-05-030
Length: 2.6 Miles
Estimate: $2,455,613
Actual: $2,960,802

CCSJ: 0915-20-016

District: San Antonio Let Date: AUG 2013
Highway: CR Let Status: Actual
Project ID: STP 2013(369)FRS CSJ: 0915-20-016
Description: INSTALL RAILROAD WARNING SIGNS AND PAVEMENT MARKINGS TO Handling
Code:
XX
Limits From: CR 344 Fund Cat: 8
Limits To: AT UPRR DOT 742825F Estimate: $215,772
Length: 0.0 Miles Actual: $150,000
 
Back...

Totals for 0915-20-016
Length: 0.0 Miles
Estimate: $215,772
Actual: $150,000


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract